Disabled Aircraft Recovery Sample Clauses

Disabled Aircraft Recovery a. Aircraft towing and other equipment as necessary for removal of disabled aircraft from the runway, taxiway or other operational areas on the airport.
AutoNDA by SimpleDocs

Related to Disabled Aircraft Recovery

  • Administrative Cost Recovery 3.1 In order to assist in the defrayment of the costs of administration and other expenses incurred by the Bank under this Agreement, the Bank may, following deposit of Contribution funds, deduct from such funds and retain for the Bank’s own account an amount equal to five percent (5.0%) of the Contributions.

  • TERM OF COLLECTIVE AGREEMENT 1.01 Except where otherwise stated in this Collective Agreement, this Collective Agreement shall be in force and effect from and after the date upon which the Union and the Employer exchange notice of ratification by their respective principals of the terms of this Collective Agreement up to and including June 30, 2020 and from year to year thereafter unless notice, in writing, is given by either Party to the other Party not less than sixty (60) calendar days nor more than one hundred and twenty (120) calendar days prior to the expiration of its desire to amend this Collective Agreement.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • INTERIM ASSET SERVICING ARRANGEMENT (a) With respect to each asset (or liability) designated from time to time by the Receiver to be serviced by the Assuming Bank pursuant to this Arrangement (such being designated as "Pool Assets"), during the term of this Arrangement, the Assuming Bank shall:

  • Definition of Building Where Lift Required 1.1 A passenger/materials lift shall be provided on a building which shall, when complete, consist of more than six (6) storey levels excluding the roof, parapets and basement levels (if any), but including the ground floor. (Refer to Sub Clause 2.1 herein.)

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Post-Commercial Operation Date Testing and Modifications Each Party shall at its own expense perform routine inspection and testing of its facilities and equipment in accordance with Good Utility Practice as may be necessary to ensure the continued interconnection of the Large Generating Facility with the Participating TO’s Transmission System in a safe and reliable manner. Each Party shall have the right, upon advance written notice, to require reasonable additional testing of the other Party’s facilities, at the requesting Party’s expense, as may be in accordance with Good Utility Practice.

  • Commercial Operation Date (COD 15.1.1 The Project shall be deemed to be complete when the Completion Certificate or the Provisional Certificate, as the case may be, is issued under the provisions of Article 14, and accordingly the commercial operation date of the Project shall be the date on which such Completion Certificate or the Provisional Certificate is issued (the “COD”). The Project shall enter into commercial service on COD whereupon the Concessionaire shall be entitled to demand and collect Annuity Payments in accordance with the provisions of this Agreement.

  • Single Collective Agreement a) Central terms and local terms shall together constitute a single collective agreement.

  • Timber Cut Through Mistake Undesig- nated timber meeting Utilization Standards, cut by Pur- chaser through mistake and included by Contracting Offi- cer under B2.14, shall be removed and paid for at Current Contract Rates and Required Deposits, unless such ma- terial is not listed in A2. In such event, Contracting Offi- cer, in accord with standard Forest Service methods, shall establish rates to be paid.

Time is Money Join Law Insider Premium to draft better contracts faster.