Designated Equipment; Designated Locations The System and the Data Access Services shall be used and accessed solely on and through the Designated Configuration at the offices of the Fund or the Fund Accountants in Xxxxxxxxx, Xxxxxxxx xx Xxxxxx Xxxxx, Xxxxxxxx (“Designated Locations”).
Supplier Selection If Customer selects a seat or galley supplier that is not on the Boeing recommended list, such seat or galley will become BFE and the provisions of Exhibit A, Buyer Furnished Equipment Provisions Document, of the AGTA will apply.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where EveryCall has requested an Unbundled Loop and BellSouth uses Integrated Digital Loop Carrier (IDLC) systems to provide the local service to the end user and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to EveryCall. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for EveryCall (e.g. hairpinning):
One-Way Interconnection Trunks 2.3.1 Where the Parties use One-Way Interconnection Trunks for the delivery of traffic from CBB to Verizon, CBB, at CBB’s own expense, shall:
Purchases Prerequisites Contractor must ensure that entities receiving payment directly from Customers under this Contract must have met the following requirements: • Have an active registration with the Florida Department of State, Division of Corporations (xxx.xxxxxx.xxx), or, if exempt from the registration requirements, provide the Department with the basis for such exemption. • Be registered in the MFMP Vendor Information Portal (xxxxx://xxxxxx. xxxxxxxxxxxxxxxxxxxx.xxx). • Have a current W-9 filed with the Florida Department of Financial Services (xxxxx://xxxxxxxx.xxxxxxxxxxxx.xxx)
C1 Contract Price C1.1 In consideration of the Contractor’s performance of its obligations under the Contract, the Authority shall pay the Contract Price in accordance with clause C2 (Payment and VAT).
Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.
Long Description (If Applicable Training to provide the knowledge, skills and abilities needed as a result of agency mission, policies, or procedures. . Training to acquire the knowledge, skills and abilities needed as a result of assignment to new duties and responsibilities when such training is not part of a planned, career development program (e.g., training provided to a staffing specialist who has been newly assigned to a position involving classification duties).
Gold Open Access Articles May be shared according to the author-selected end-user license and should contain a CrossMark logo, the end user license, and a DOI link to the formal publication on ScienceDirect. Please refer to Elsevier's posting policy for further information.
Open Access Same-Time Information System (OASIS): The information system and standards of conduct contained in Part 37 and Part 38 of the Commission’s regulations and all additional requirements implemented by subsequent Commission orders dealing with OASIS.