Core Working Group (CWG Sample Clauses

Core Working Group (CWG. This national Core Working Group will be comprised of the following: • USAID Mexico • The Nature Conservancy -TNC • WWF • CI • Fondo Mexicano para la Conservacion de la Naturaleza (FMCN) • Secretaria del Medio Ambiente y Recursos Naturales - SEMARNAT. • Pronatura Mexico
AutoNDA by SimpleDocs

Related to Core Working Group (CWG

  • Working Group 1. The Parties hereby establish a Working Group on Temporary Entry for Business Persons, which shall meet at least once every 3 years or on request of the Free Trade Commission to consider any matter arising under this Chapter. 2. The Working Group's functions shall include: (a) to review the implementation and operation of this Chapter; (b) to consider the development of measures to further facilitate temporary entry of business persons on a reciprocal basis; (c) the identification of measures that affect the temporary entry of business persons under this Chapter; and (d) the observance of the issues established under Article 121 (Cooperation).

  • Working Groups From time to time, a Joint Committee may establish and delegate duties to sub-committees or directed teams (each, a “Working Group”) on an “as-needed” basis to oversee particular projects or activities (e.g., joint project team, joint finance group, or joint intellectual property group). Each such Working Group shall be constituted and shall operate as the Joint Committee determines; provided, that each Working Group shall have equal representation from each Party, unless otherwise mutually agreed. Working Groups may be established on an ad hoc basis for purposes of a specific project or on such other basis as the Joint Committee may determine. Each Working Group and its activities shall be subject to the oversight, review and approval of, and shall report to, the Joint Committee that formed said Working Group. In no event shall the authority of the Working Group exceed that specified for the Joint Committee that formed the Working Group. All decisions of a Working Group shall be by unanimous agreement. Any disagreement between the designees of AbbVie and Ablynx on a Working Group shall be referred to the Joint Committee that formed the Working Group for resolution.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Programming Phase 2.2.1.2. Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Development Phase contractual phase initiated with the approval of ANP for the Development Plan and which is extended during the Production Phase while investments in xxxxx, equipment, and facilities for the Production of Oil and Gas according to the Best Practices of the Oil Industry are required.

  • Project Team To accomplish Owner’s objectives, Owner intends to employ a team concept in connection with the construction of the Project. The basic roles and general responsibilities of team members are set forth in general terms below but are more fully set forth in the Design Professional Contract with respect to the Design Professional, in the Program Management Agreement with any Program Manager, and in this Contract with respect to the Contractor.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection xxxxx; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.

  • JOINT WORK PRODUCT This Agreement is the joint work product of H-GAC and the Contractor. This Agreement has been negotiated by H-GAC and the Contractor and their respective counsel and shall be fairly interpreted in accordance with its terms and, in the event of any ambiguities, no inferences shall be drawn against any party.

  • Program Development NWESD agrees that priority in the development of new applications services by XXXXX shall be in accordance with the expressed direction of the XXXXX Board of Directors operating under their bylaws.

  • Design Development Phase Services 3.3.1 Based on the Owner’s approval of the Schematic Design Documents, and on the Owner’s authorization of any adjustments in the Project requirements and the budget for the Cost of the Work, the Architect shall prepare Design Development Documents for the Owner’s approval. The Design Development Documents shall illustrate and describe the development of the approved Schematic Design Documents and shall consist of drawings and other documents including plans, sections, elevations, typical construction details, and diagrammatic layouts of building systems to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, and other appropriate elements. The Design Development Documents shall also include outline specifications that identify major materials and systems and establish, in general, their quality levels.

Time is Money Join Law Insider Premium to draft better contracts faster.