Conception conditions Sample Clauses

Conception conditions. The prefabricated load bearing stressed skin panels with wood– thermal-insulating GREEN PANEL SIP are conceived as panels for execution of load bearing walls and floors. GREEN PANEL SIP are also conceived such as to allow application of additional protection and finishing layers contributing to the improvement of the thermal, acoustic and fire safety performances. Upon the elaboration of designs of buildings made of GREEN PANEL SIP boars, there will be considered both the manufacturer’s recommendations and the provisions of the following Romanian technical regulations on actions in constructions: Group of standards SR EN 1995:2004 – Eurocor 5 “Wood structures design”; Group of standards SR EN 1995:2008 “National appendix to Eurocor 5” – Eurocor 5 “Wood structures design”; CR 0-2005 – “Design Code. Basics of construction structures design”; P100-1/2006 – “Seismic Design Code. 1st Part. Buildings design provisions”; NE 019-2003 – “Calculation and structure of wood resistance structures placed within seismic areas (completion for the normative deed for anti-seismic design of dwellings, social-cultural and industrial buildings P 100- 92 in chap. IX regarding wood constructions”; EN 019-1997 – “Guide for calculation on limit states of the wood structural elements”; NP 082-2004 – “Design code regarding the basics of design and actions on constructions. Wind action”; “Constructions fire safety normative deed” – indicative P 118-99; NP 068-02 – “Normative deed on civil constructions design considering the requirements for safety in exploitation; C125-2005 – “Normative deed on design and execution of phonic insulation and acoustic treatments on buildings”; C107-2005 – “Normative deed on thermal- technical calculation of the construction elements of the buildings”; NP040-2002 – “Normative deed on design, execution and exploitation of hydro- insulations on buildings”; STAT 10101/0A-77: “Actions in constructions. Classification and grouping of actions for civil and industrial constructions”; STAT 10101/1-78: “Actions in constructions. Technical loads and permanent loads”; STAT 10101/2A1-87: “Actions in constructions. Loads due to the exploitation process for civil, industrial and agro-zoo technical constructions”; STAT 10101/20-90: “Actions in constructions. Loads given by the wind”; STAT 10101/21-92: “Actions in constructions. Loads given by snow”; STAT 10101/23A-78: “Actions in constructions. Loads given by external temperature in civil and industrial constructions”...
AutoNDA by SimpleDocs

Related to Conception conditions

  • Termination Conditions This Agreement terminates upon the earlier of any of the following events: 18.1. Podmínky ukončení platnosti smlouvy Platnost této smlouvy skončí, jakmile nastane kterákoliv z následujících událostí:

  • PROJECT CONDITIONS A. The Grantee agrees to the following Project Conditions:

  • Training Conditions 3.1 The Trainee shall attend an approved training course or training program prescribed in the Training Agreement or as notified to the trainee by the relevant State or Territory Training Authority in accredited and relevant Traineeship Schemes.

  • WORK CONDITIONS The Contractor agrees to accept sole responsibility to comply with all federal, provincial and municipal legislation which may have application to the Work and agrees to comply with all provincial and federal legislation affecting conditions of work and wage rates including the Employment Standards Act R.S.P.E.I. 1988, Cap. E-6.2, the Workers Compensation Act R.S.P.E.I. 1988, Cap. W-7.1, or any other laws that impose obligations in the nature of employers’ obligations. The Contractor agrees to follow the Public Service Commission Human Resource Policies 9.05 Violence in the Workplace Policy; 9.08 Drug, Alcohol, and Medication Policy, and 11.01 Policy for the Prevention and Resolution of Harassment in the Workplace while working on Government sites, in Government vehicles or alongside Government staff. xxxxx://xxx.xxxx.xx/sites/xxx.xxxx.xx/files/HRPolicy/HRManual_9.05.pdf xxxxx://xxx.xxxx.xx/sites/xxx.xxxx.xx/files/9.08%20DrugAlcoholAndMedicationPolicy.pdf xxxxx://xxx.xxxx.xx/files/PDF%20Files/hrp-manual/hrppm_11.01.pdf The Contractor agrees to accept the full cost of doing those things required under this paragraph and will not charge or seek reimbursement from the Owner in any way, such costs having been taken into consideration and included in the rates of payment stipulated in this Agreement.

  • Unsafe Work Conditions No employee shall be disciplined for refusal to work on an assignment which, in the opinion of:

  • Contract Conditions This section contains conditions which shall be complied with during the performance of this contract. The conditions come in two parts, general conditions and special contract requirements.

  • SUPERIOR CONDITIONS 21.01 All existing benefits, rights, privileges, practices, terms or conditions of employment which may be considered to be superior to those contained herein and which are set out in Appendix 4 are specifically retained by this Agreement unless otherwise agreed by the local parties. The parties agree to remove from Appendix 4 those superior conditions which no longer have application. Where the parties cannot agree on whether a superior condition continues to have application, the issue will be reduced to a grievance and referred to arbitration.

  • Unsafe Working Conditions (a) No Employee shall be disciplined for refusal to work on a job which is deemed unsafe by:

  • Test conditions 6.1.1. The test shall be performed on a flat, dry concrete or asphalt surface affording good adhesion.

  • Safe Working Conditions The Employer undertakes to maintain office furniture, equipment, etc., in a practical and safe condition in order to avoid injury to employees or damage to their attire. Employees, for their part and in their own interest, are expected to advise the Employer of any such potentially injurious equipment.

Time is Money Join Law Insider Premium to draft better contracts faster.