Coercive Control Sample Clauses

Coercive Control. Coercive control comprises a complex pattern of abuse, using power and psychological domination to exert and maintain control over another. It includes financial control (see section 1.2.3), psychological/emotional abuse (see section 1.2.4) and forced social isolation (i.e. isolation from friends, family and other support networks). It is important to note that survivors of domestic violence are rarely subjected to just one of the behaviours outlined above (Xxxxxx, Xxxxxxxxxx & Xxxxx-Xxxxxx, 2010); a finding supported by the research study presented in Chapter 5, which explores the type and severity of abuse experienced by male and female psychiatric service users. Around half of women and a third of men who experience domestic violence report more than one form of abusive behaviour (Xxxxxxx, Xxxxxxx, Xxxxx, et al, 2007). In an attempt to gain a deeper understanding of the nature of domestic violence among men and women, several scholars have attempted to examine the patterns and characteristics of violence within violent relationships; as outlined below.
AutoNDA by SimpleDocs
Coercive Control. Consistent patterns of controlling behavior that may include intimidation, isolation, threats, or monitoring.

Related to Coercive Control

  • Restrictive Controls Either Party may use protective network traffic management controls such as 7-digit and 10-digit code gaps set at appropriate levels on traffic toward each other's network, when required, to protect the public switched network from congestion due to facility failures, switch congestion, or failure or focused overload. CLEC and CenturyLink will immediately notify each other of any protective control action planned or executed.

  • Noise Control The use of sound equipment is prohibited unless approved by Management. Any electronic equipment or machinery which is determined to be distracting to other exhibits will not be permitted.

  • Climate Control a. The air conditioning/heating units shall be functional at all times.

  • Expansive Controls Where the capability exists, originating or terminating traffic reroutes may be implemented by either Party to temporarily relieve network congestion due to facility failures or abnormal calling patterns. Reroutes will not be used to circumvent normal trunk servicing. Expansive controls will only be used when mutually agreed to by the Parties.

  • Site Control In the total loss of building use scenario, what likely exists will be a smoking pile of rubble. This rubble will contain many components that could be dangerous. It could also contain any personnel on the premises at the time of the disaster. For these reasons, the local fire marshal with the assistance of the police will control the site until the building is no longer a threat to surrounding properties and the companies have secured the site from the general public. During this time, the majority owner of the building should be arranging for a demolition contractor to mobilize to the site with the primary objective of reaching the cable entrance facility for a damage assessment. The results of this assessment would then dictate immediate plans for restoration, both short term and permanent. In a less catastrophic event, i.e., the building is still standing and the cable entrance facility is usable, the situation is more complex. The site will initially be controlled by local authorities until the threat to adjacent property has diminished. Once the site is returned to the control of the companies, the following events should occur. An initial assessment of the main building infrastructure systems (mechanical, electrical, fire and life safety, elevators, and others) will establish building needs. Once these needs are determined, the majority owner should lead the building restoration efforts. There may be situations where the site will not be totally restored within the confines of the building. The companies must individually determine their needs and jointly assess the cost of permanent restoration to determine the overall plan of action. Multiple restoration trailers from each company will result in the need for designated space and installation order. This layout and control is required to maximize the amount of restoration equipment that can be placed at the site, and the priority of placements. Care must be taken in this planning to ensure other restoration efforts have logistical access to the building. Major components of telephone and building equipment will need to be removed and replaced. A priority for this equipment must also be jointly established to facilitate overall site restoration. (Example: If the AC switchgear has sustained damage, this would be of the highest priority in order to regain power, lighting, and HVAC throughout the building.) If the site will not accommodate the required restoration equipment, the companies would then need to quickly arrange with local authorities for street closures, rights of way or other possible options available.

  • Control Notwithstanding any other provision of the Agreement, it is understood and agreed that the Trust shall at all times retain the ultimate responsibility for and control of all functions performed pursuant to this Agreement and has reserved the right to reasonably direct any action hereunder taken on its behalf by the Sub-Adviser.

  • Fraud Control BellSouth will provide seven days per week, 24-hours per day, fraud monitoring on Calling Cards, xxxx-to-third and collect calls made to numbers in BellSouth’s LIDB, provided that such information is included in the LIDB query. BellSouth will establish fraud alert thresholds and will notify <<customer_name>> of fraud alerts so that <<customer_name>> may take action it deems appropriate.

  • Infection Control Consistent with the Centers for Disease Control and Prevention Guideline for Infection Control in Health Care Personnel, and University Policy 3364-109-EH-603, the parties agree that all bargaining unit employees who come in contact with patients in the hospital or ambulatory care clinics will need to be vaccinated against influenza when flu season begins each fall. The influenza vaccine will be offered to all health care workers, including pregnant women, before the influenza season, unless otherwise medically contraindicated or it compromises sincerely held religious beliefs.

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

Time is Money Join Law Insider Premium to draft better contracts faster.