Boundary Wall and Fencing Sample Clauses

Boundary Wall and Fencing. The Concessionaire shall construct a wire mesh fencing of minimum 3.5 meters height along the perimeter of the Landfill Facility. There shall be only one common entry-cum-exit point into the Landfill Facility with such entry-cum-exit point being from the Waste Processing Facility.
AutoNDA by SimpleDocs
Boundary Wall and Fencing. (a) The Concessionaire shall construct a boundary wall as per approved drawings.

Related to Boundary Wall and Fencing

  • Boundary Line Fires Both Parties shall have responsibility for Initial Attack in the case of a Boundary Line Fire. Neither Party will assume the other is aware of the fire, or is taking action. The officer-in-charge who arrives first at the boundary line fire will act as Incident Commander. When both Parties have arrived, they will mutually agree to the designation of the Incident Commander or the initiation of a Unified Command Structure.

  • Fill, Backfill and Landscaping No soil found on Site, or transported to the Site from remote locations, which contains debris or waste or Hazardous Materials shall be used for fill, backfill or landscaping topsoil.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Cutting, Patching, and Fitting The Contractor shall do all cutting, patching, and fitting of the Work that may be required to make its several parts come together properly and fit.

  • Geological and Archeological Specimens If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.

  • The Site The site of the Project Highway (the “Site”) shall comprise the site described in Schedule-A in respect of which the Right of Way shall be provided by the Authority to the Contractor. The Authority shall be responsible for:

  • Fencing The SPD shall Fence the demarcated boundary of the Demised Premises at the SPD’s own expense in every respect.

  • Study Area The study area focused on the Bulk Power System in South-Eastern New York between Albany and New York City, and voltages underlying systems at 115 kV and above in the lower Xxxxxx Valley (Zones G, H & I). In the PSS™E power flow base case provided by NYISO, facilities rated at 115 kV and above in PSS™E designated areas 6 through 11 are monitored in the study. These areas are: • Capital District • Xxxxxx • Millwood • Xxxxxxxxx • Con Ed • Long Island

  • Boundaries All of the improvements which were included in determining the appraised value of the Property lie wholly within the boundaries and building restriction lines of the Property, and no improvements on adjoining properties encroach upon the Property, and no easements or other encumbrances upon the Property encroach upon any of the Improvements, so as to affect the value or marketability of the Property except those which are insured against by the Title Insurance Policy.

  • Work Site Work site shall be defined as a college campus or any other place designated by management where instruction and/or services are performed.

Time is Money Join Law Insider Premium to draft better contracts faster.