Blast Condition Surveys of Structures Sample Clauses

Blast Condition Surveys of Structures. Prior to and after completion of earth/rock excavation, drilling, or blasting work, engage a qualified by training and experience, independent, professional engineer to conduct pre- and post-blast condition surveys of all existing structures and conditions on the site, adjacent to the site, or in the vicinity of the site. This survey shall extend to such structures or conditions as may be affected by the Contractor’s construction operations. The minimum limits for the properties and structures to be surveyed within a 200 ft radius of the proposed blast. At least two (2) weeks prior to the performance of the pre- and post-blast condition survey of structures, submit to the RE the proposed survey program prepared by the Contractor’s consultant. Include detailed specifications of the field procedures and survey methods to be utilized in the program description.
AutoNDA by SimpleDocs

Related to Blast Condition Surveys of Structures

  • HHSC SPECIAL CONDITIONS The terms and conditions of these Special Conditions are incorporated into and made a part of the Contract. Capitalized items used in these Special Conditions and not otherwise defined have the meanings assigned to them in HHSC Uniform Terms and Conditions -Grant- Version 2.16.1

  • Supplemental JBoss Software Conditions Software Access and Software Maintenance for Supplemental JBoss Software is intended and available for Development Purposes only and for up to 25 users for each 16 Core Band Subscription of Red Hat JBoss Middleware Software that you purchased. If you deploy or use the Supplemental JBoss Software for Production Purposes or for more than 25 users, you agree to purchase the appropriate Software Subscriptions for each Unit that you deploy or use. Red Hat’s Open Source Assurance Program applies only to the Red Hat JBoss Middleware Software Subscription that you purchased (such as Red Hat JBoss Enterprise Application Platform in the example above) and does not apply to Supplemental JBoss Software. JBoss xPaaS Subscriptions (defined below) are not considered Supplemental JBoss Software. Each installation and use of JBoss xPaaS Subscriptions Software for either Development Purposes or Production Purposes is a Unit and requires a paid Software Subscription.

  • – OTHER SPECIAL CONDITIONS The following additional special conditions apply to this agreement:

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.

  • Training Conditions 3.1 The Trainee shall attend an approved training course or training program prescribed in the Training Agreement or as notified to the trainee by the relevant State or Territory Training Authority in accredited and relevant Traineeship Schemes.

  • Adverse Weather Conditions Except in emergency situations, the Employer shall not require an employee:

  • ADDITIONAL SPECIAL CONTRACT CONDITIONS A. Special Contract Conditions revisions: the corresponding subsections of the Special Contract Conditions referenced below are replaced in their entirety with the following:

  • Implementation Specifications 1. The accounting shall contain the date, nature, and purpose of such disclosures, and the name and address of the person or agency to whom the disclosure is made.

  • PROJECT CONDITIONS A. The Grantee agrees to the following Project Conditions:

  • Class Specifications The Human Resources Division shall determine:

Time is Money Join Law Insider Premium to draft better contracts faster.