ANT AND COCKROACH CONTROL Sample Clauses

ANT AND COCKROACH CONTROL. Treatment by residual spraying, fogging or misting will be carried out regularly in the whole premises, such as training rooms, supply and storage areas, elevator duct, employees canteen, locker rooms, various offices, common areas especially in the suspected harborages and breeding places of cockroaches, such as pantries, toilet areas and drainages. Cracks and crevices and hidden surfaces such as inside drawer units, cupboards and cabinets shall also be treated with insecticidal solutions with residual effect, in which case all contents thereof must be removed prior to the scheduled date of service. Residual misting and / or spraying will be applied to areas where fogging treatment is not advisable. CONTRACTOR
AutoNDA by SimpleDocs

Related to ANT AND COCKROACH CONTROL

  • Real and Reactive Power Control 36 9.6 Outages and Interruptions. 37 9.7 Switching and Tagging Rules. 41 9.8 Use of Attachment Facilities by Third Parties. 41 9.9 Disturbance Analysis Data Exchange. 42 ARTICLE 10. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations. 42 10.2 Developer Obligations. 42 10.3 Coordination. 42 10.4 Secondary Systems. 42 10.5 Operating and Maintenance Expenses. 43 ARTICLE 11. PERFORMANCE OBLIGATION 43

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Code of Basic Working Conditions and Human Rights Xxxxx is committed to providing a safe and secure working environment and the protection and advancement of basic human rights in its worldwide operations. In furtherance of this commitment, Xxxxx has adopted a Code of Basic Working Conditions and Human Rights setting out in detail the measures it takes to ensure this commitment is fulfilled. This code may be downloaded at xxxxx://xxx.xxxxxx.xxx/principles/xxxxx-xxxxxx.xxxx. Xxxxx strongly encourages Seller to adopt and enforce concepts similar to those embodied in the Boeing Code, including conducting Seller’s operations in a manner that is fully compliant with all applicable laws and regulations pertaining to fair wages and treatment, freedom of association, personal privacy, collective bargaining, workplace safety and environmental protection. Seller shall include the substance of this clause, including this flowdown requirement, in all subcontracts awarded by Seller for work under this Contract.

  • File Management and Record Retention relating to CRF Eligible Persons or Households Grantee must maintain a separate file for every applicant, Eligible Person, or Household, regardless of whether the request was approved or denied.

  • Erosion and Sediment Control The Contractor shall install and maintain erosion and sediment control devices to prevent adjacent streets, storm drains and property from accumulations of soil, sediment, or dust which result from his work. Devices installed to control sediment and prevent erosion shall comply with the requirements of the Georgia Tech Project Superintendent. The Contractor is responsible for monitoring downstream conditions throughout the construction period and clearing any debris, sediment, and dust caused by the progress of the Work. The Contractor shall inspect, maintain, and clear erosion and sediment control devices at least weekly unless otherwise directed by the Georgia Institute of Technology Construction Manager. At the conclusion of the Work, the Contractor shall remove all installed devices and restoring the site to the satisfaction of the Georgia Tech Construction Manager.

  • Notice of Criminal Activity and Disciplinary Actions a. Xxxxxxx shall immediately report in writing to their contract manager when Xxxxxxx has knowledge or any reason to believe that they or any person with ownership or controlling interest in the organization/business, or their agent, employee, contractor or volunteer that is providing services under this Contract has:

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • Competent Authorities and Contact Points 1. Each Party shall provide each other Party with a description of its competent authorities and their division of responsibilities.

  • Project Management and Coordination The Engineer shall coordinate all subconsultant activity to include quality of and consistency of work and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.

  • Cloud Computing State Risk and Authorization Management Program In accordance with Senate Bill 475, Acts 2021, 87th Leg., R.S., pursuant to Texas Government Code, Section 2054.0593, Contractor acknowledges and agrees that, if providing cloud computing services for System Agency, Contractor must comply with the requirements of the state risk and authorization management program and that System Agency may not enter or renew a contract with Contractor to purchase cloud computing services for the agency that are subject to the state risk and authorization management program unless Contractor demonstrates compliance with program requirements. If providing cloud computing services for System Agency that are subject to the state risk and authorization management program, Contractor certifies it will maintain program compliance and certification throughout the term of the Contract.

Time is Money Join Law Insider Premium to draft better contracts faster.