Common use of Alternative Procedures for Requesting Interconnection Service Clause in Contracts

Alternative Procedures for Requesting Interconnection Service. If Transmission Provider determines that the provision of Interconnection Service requested by Interconnection Customer would jeopardize the tax-exempt status of any local furnishing bond(s) used to finance its facilities that would be used in providing such Interconnection Service, it shall advise the Interconnection Customer within thirty (30) Calendar Days of receipt of the Interconnection Request. Interconnection Customer thereafter may renew its request for interconnection using the process specified in Article 5.2(ii) of the Transmission Provider’s OATT, if applicable. 1. The undersigned Interconnection Customer submits this request to interconnect its Large Generating Facility which is a Qualifying Facility with the Transmission Provider’s Transmission System pursuant to Transmission Provider’s QF-LGIP. 2. This Interconnection Request is for (check one): 3. The type of interconnection service requested is Network Resource Interconnection Service. 4. Check here if Interconnection Customer requesting Network Resource Interconnection Service has initiated the process of certifying the Large Generating Facility as a Qualifying Facility as provided in 18 C.F.R. 292-207. 5. Interconnection Customer provides the following information: a. Address or location or the proposed new Large Generating Facility site (to the extent known) or, in the case of an existing Large Generating Facility, the name and specific location of the existing Large Generating Facility; b. Maximum summer at _ degrees C and winter at degrees C megawatt electrical output of the proposed new Large Generating Facility or the amount of megawatt increase in the generating capacity of an existing Large Generating Facility; c. General description of the equipment configuration; d. Commercial Operation Date (Day, Month, and Year); e. Name, address, telephone number, and e-mail address of Interconnection Customer's contact person;

Appears in 1 contract

Sources: Qualifying Facility Large Generator Interconnection Agreement (Qf Lgia)

Alternative Procedures for Requesting Interconnection Service. If Transmission Provider determines that the provision of Interconnection Service requested by Interconnection Customer would jeopardize the tax-exempt status of any local furnishing bond(s) used to finance its facilities that would be used in providing such Interconnection Service, it shall advise the Interconnection Customer within thirty (30) Calendar Days days of receipt of the Interconnection Request. Interconnection Customer thereafter may renew its request for interconnection using the process specified in Article 5.2(ii) of the Transmission Provider’s OATT, if applicable. 1. The undersigned Interconnection Customer submits this request to interconnect its Large Generating Facility which is a Qualifying Facility with the Transmission Provider’s 's Transmission System pursuant to Transmission Provider’s QF-LGIPa Tariff. 2. This Interconnection Request is for (check one): 3. The type of interconnection service requested is Network Resource Interconnection Service.(check one): 4. Check here only if Interconnection Customer requesting Network Resource Interconnection Service has initiated the process of certifying the Large also seeks to have its Generating Facility as a Qualifying Facility as provided in 18 C.F.R. 292-207.studied for Energy Resource Interconnection Service 5. Interconnection Customer provides the following information: a. Address or location or the proposed new Large Generating Facility site (to the extent known) or, in the case of an existing Large Generating Facility, the name and specific location of the existing Large Generating Facility; b. Maximum summer at _ degrees C and winter at degrees C megawatt electrical output of the proposed new Large Generating Facility or the amount of megawatt increase in the generating capacity of an existing Large Generating Facility; c. General description of the equipment configurationconfiguration (e.g, wind, solar, biomass, combined cycle, base load or combustion turbine; and fuel type); d. Commercial Operation Date (Day, Month, and Year); e. Name, address, telephone number, and e-mail address of Interconnection Customer's contact person;

Appears in 1 contract

Sources: Standard Large Generator Interconnection Procedures (Lgip)

Alternative Procedures for Requesting Interconnection Service. If Transmission Provider determines that the provision of Interconnection Service requested by Interconnection Customer would jeopardize the tax-exempt status of any local furnishing bond(s) used to finance its facilities that would be used in providing such Interconnection Service, it shall advise the Interconnection Customer within thirty (30) Calendar daysCalendar Days of receipt of the Interconnection Request. Interconnection Customer thereafter may renew its request for interconnection using the process specified in Article 5.2(ii) of the Transmission Provider’s OATT, if applicableOATTTariff. 1. The undersigned Interconnection Customer submits this request to interconnect its Large Generating Facility which is a Qualifying Facility with the Transmission Provider’s 's Transmission System pursuant to Transmission Provider’s QF-LGIPa Tariff. 2. This Interconnection Request is for (check one): 3. The type of interconnection service requested is Network Resource Interconnection Service.(check one): 4. Check here only if Interconnection Customer requesting Network Resource Interconnection Service has initiated the process of certifying the Large also seeks to have its Generating Facility as a Qualifying Facility as provided in 18 C.F.R. 292-207.studied for Energy Resource Interconnection Service 5. Interconnection Customer provides the following information: a. Address or location or the proposed new Large Generating Facility site (to the extent known) or, in the case of an existing Large Generating Facility, the name and specific location of the existing Large Generating Facility; b. Maximum summer at _ degrees C and winter at degrees C megawatt electrical output of the proposed new Large Generating Facility or the amount of megawatt increase in the generating capacity of an existing Large Generating Facility; c. General description of the equipment configuration; d. Commercial Operation Date (Day, Month, and Year); e. Name, address, telephone number, and e-mail address of Interconnection Customer's contact person;

Appears in 1 contract

Sources: Standard Large Generator Interconnection Procedures (Lgip)

Alternative Procedures for Requesting Interconnection Service. If Transmission Provider determines that the provision of Interconnection Service requested by Interconnection Customer would jeopardize the tax-exempt status of any local furnishing bond(s) used to finance its facilities that would be used in providing such Interconnection Service, it shall advise the Interconnection Customer within thirty (30) Calendar Days of receipt of the Interconnection Request. Interconnection Customer thereafter may renew its request for interconnection using the process specified in Article 5.2(ii) of the Transmission Provider’s OATT, if applicableTariff. 1. The undersigned Interconnection Customer submits this request to interconnect evaluate the interconnection of its Large Generating Facility which is a Qualifying Facility with the Transmission Provider’s 's Transmission System pursuant to Transmission Provider’s QF-LGIPthe Tariff. 2. This Interconnection Request is for The type of interconnection service to be evaluated (check one): 3. The type of interconnection service requested is Network Resource Interconnection Service. 4. Check here if Interconnection Customer requesting Network Resource Interconnection Service has initiated the process of certifying the Large Generating Facility as a Qualifying Facility as provided in 18 C.F.R. 292-207. 5. Interconnection Customer provides the following information: a. Address or location or the proposed new Large Generating Facility site (to the extent known) or, in the case of an existing Large Generating Facility, the name and specific location of the existing Large Generating Facility; b. Maximum summer at _ degrees C and winter at degrees C megawatt electrical output of the proposed new Large Generating Facility or the amount of megawatt increase in the generating capacity of an existing Large Generating Facility; c. General description of the equipment configuration; d. Commercial Operation Date to be studied (Day, Month, and Year); ; e. Name, address, telephone number, and e-mail address of Interconnection Customer's contact person; f. Approximate location of the proposed Point of Interconnection; g. Interconnection Customer Data (set forth in Attachment A) h. Primary frequency response operating range for electric storage resources. i. Requested capacity (in MW) of Interconnection Service (if lower than the Generating Facility Capacity); and j. A Scope of Work including any additional information that may be reasonably required. 4. $10,000 study deposit amount as specified in the LGIP. 5. For study purposes, the point of delivery to deliver within the Control Area or to adjoining Control Area if the Generating Facility is not designated a Network Resource pursuant to Section 30.2 of the Tariff. 6. This Informational Interconnection Study Request shall be submitted to the representative indicated below: [To be completed by Transmission Provider] 7. Representative of Interconnection Customer to contact: [To be completed by Interconnection Customer] 8. This Interconnection Request is submitted by: Name of Interconnection Customer: By (signature): Name (type or print): Title: Date: Speed (RPM) Short Circuit Ratio Connection (e.g. Wye) _ Frequency, Hertz Stator Amperes at Rated kVA Field Volts Max Turbine MW °F Inertia Constant, H = kW sec/kVA Moment-of-Inertia, WR2 = lb. ft.2 Synchronous – saturated Xdv Xqv Synchronous – unsaturated Xdi Xqi Transient – saturated X'dv X'qv Transient – unsaturated X'di X'qi Subtransient – saturated X”dv X”qv Subtransient – unsaturated X”di X”qi Negative Sequence – saturated X2v Negative Sequence – unsaturated X2i Zero Sequence – saturated X0v Zero Sequence – unsaturated X0i Leakage Reactance Xlm Open Circuit T'do T'qo Three-Phase Short Circuit Transient T'd3 T'q Line to Line Short Circuit Transient T'd1 Short Circuit Subtransient T”d T”q Open Circuit Subtransient T'd2 Line to Neutral Short Circuit Transient T”do T”qo Three Phase Short Circuit Ta3 Line to Line Short Circuit Ta2 Line to Neutral Short Circuit Ta1 NOTE: If requested information is not applicable, indicate by marking “N/A.” Positive R1 Negative R2 Zero R0 Rotor Short Time Thermal Capacity I22t = Field Current at Rated kVA, Armature Voltage and PF = amps Field Current at Rated kVA and Armature Voltage, 0 PF = amps Three Phase Armature Winding Capacitance = microfarad Field Winding Resistance = ohms °C Armature Winding Resistance (Per Phase) = ohms °C Provide Saturation, Vee, Reactive Capability, Capacity Temperature Correction curves. Designate normal and emergency Hydrogen Pressure operating range for multiple curves. Capacity Self-cooled/ Maximum Nameplate / kVA Voltage Ratio(Generator Side/System side/Tertiary) / / kV Winding Connections (Low V/High V/Tertiary V (Delta or Wye)) / / Fixed Taps Available Present Tap Setting If more than one transformer stage is used to deliver the output from the proposed generator to the Transmission System, please provide the information above for each transformer or transformer type.

Appears in 1 contract

Sources: Standard Large Generator Interconnection Agreement (Lgia)

Alternative Procedures for Requesting Interconnection Service. If Transmission Provider determines that the provision of Interconnection Service requested by Interconnection Customer would jeopardize the tax-exempt status of any local furnishing bond(s) used to finance its facilities that would be used in providing such Interconnection Service, it shall advise the Interconnection Customer within thirty (30) Calendar Days of receipt of the Interconnection Request. Interconnection Customer thereafter may renew its request for interconnection using the process specified in Article 5.2(ii) of the Transmission Provider’s OATT, if applicableTariff. 1. The undersigned Interconnection Customer submits this request to interconnect evaluate the interconnection of its Large Generating Facility which is a Qualifying Facility with the Transmission Provider’s 's Transmission System pursuant to Transmission Provider’s QF-LGIPthe Tariff. 2. This Interconnection Request is for (check one): 3. The type of interconnection service requested is to be evaluated (check one): _____Energy Resource Interconnection Service _____Network Resource Interconnection Service. 4. Check here if Interconnection Customer requesting Network Resource Interconnection Service has initiated the process of certifying the Large Generating Facility as a Qualifying Facility as provided in 18 C.F.R. 292-207. 53. Interconnection Customer provides the following information: a. Address or location or the proposed new Large Generating Facility site (to the extent known) or, in the case of an existing Large Generating Facility, the name and specific location of the existing Large Generating Facility; b. Maximum summer at ____ degrees C and winter at _____ degrees C megawatt electrical output of the proposed new Large Generating Facility or the amount of megawatt increase in the generating capacity of an existing Large Generating Facility; c. General description of the equipment configuration; d. Commercial Operation Date to be studied (Day, Month, and Year); ; e. Name, address, telephone number, and e-mail address of Interconnection Customer's contact person; f. Approximate location of the proposed Point of Interconnection; g. Interconnection Customer Data (set forth in Attachment A) h. Primary frequency response operating range for electric storage resources. i. Requested capacity (in MW) of Interconnection Service (if lower than the Generating Facility Capacity); and j. A Scope of Work including any additional information that may be reasonably required. 4. $10,000 study deposit amount as specified in the LGIP. 5. For study purposes, the point of delivery to deliver within the Control Area or to adjoining Control Area if the Generating Facility is not designated a Network Resource pursuant to Section 30.2 of the Tariff. 6. This Informational Interconnection Study Request shall be submitted to the representative indicated below: [To be completed by Transmission Provider] 7. Representative of Interconnection Customer to contact: [To be completed by Interconnection Customer] 8. This Interconnection Request is submitted by: Name of Interconnection Customer: ___________________________________ By (signature): ____________________________________________________ Name (type or print): _______________________________________________ Title: ____________________________________________________________ Date: ___________________ Minimum State of Charge: ___________________ Maximum State of Charge: ___________________ Inertia Constant, H =_____________kW sec/kVA Moment-of-Inertia, WR2 =_____________lb. ft.2 Synchronous – saturated Xdv__ Xqv___ Synchronous – unsaturated Xdi___ Xqi____ Transient – saturated X'dv__ X'qv___ Transient – unsaturated X'di___ X'qi____ Subtransient – saturated X”dv__ X”qv_______ Subtransient – unsaturated X”di___ X”qi___ Negative Sequence – saturated X2v___ Negative Sequence – unsaturated X2i____ Zero Sequence – saturated X0v___ Zero Sequence – unsaturated X0i___ Leakage Reactance Xlm___ Open Circuit T'do___ T'qo___ Three-Phase Short Circuit Transient T'd3___________ T'q____ Line to Line Short Circuit Transient T'd1___ Short Circuit Subtransient T”d____ T”q____ Open Circuit Subtransient T'd2____ Line to Neutral Short Circuit Transient T”do___ T”qo___ Three Phase Short Circuit Ta3_______ Line to Line Short Circuit Ta2_______ Line to Neutral Short Circuit Ta1_______ NOTE: If requested information is not applicable, indicate by marking “N/A.” Positive R1_______ Negative R2_______ Zero R0_______ Rotor Short Time Thermal Capacity I22t = _______ Field Current at Rated kVA, Armature Voltage and PF =_______amps Field Current at Rated kVA and Armature Voltage, 0 PF =_______amps Three Phase Armature Winding Capacitance =_______microfarad Field Winding Resistance = _______ ohms _______°C Armature Winding Resistance (Per Phase) =_______ ohms _______°C Provide Saturation, Vee, Reactive Capability, Capacity Temperature Correction curves. Designate normal and emergency Hydrogen Pressure operating range for multiple curves. Capacity Self-cooled/ Maximum Nameplate _______________/_______________kVA Voltage Ratio(Generator Side/System side/Tertiary) _______________/_______________/_______________kV Winding Connections (Low V/High V/Tertiary V (Delta or Wye)) _______________/______________/_______________ Fixed Taps Available ______________________________________________________ Present Tap Setting _______________________________________________________ If more than one transformer stage is used to deliver the output from the proposed generator to the Transmission System, please provide the information above for each transformer or transformer type.

Appears in 1 contract

Sources: Standard Large Generator Interconnection Agreement (Lgia)