Technical zone definition

Technical zone means the area between the ring, cage or fenced area and public seating. The area must have a separate divider and be at least 8 but preferably 12 feet from the ring, cage or fenced area. If there is not a solid barrier, uniformed security must be present.

Related to Technical zone

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Technical Support Services means the technical support and maintenance Services provided by us according to our then-current technical support policy and procedure listed at ▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ (“Technical Support Policy”) when the Services are purchased.

  • Design-build team means an entity that consists of:

  • Technical Services means all services that are necessary to carry out individual, scattered site activities including but not limited to: (1) conducting initial inspections, (2) work write-up or project specification development, (3) cost estimate preparation, (4) construction supervision associated with activities that do not require an architect or engineer, (5) lead hazard reduction or lead abatement need determination and oversight, (6) lead hazard reduction or abatement carrying costs, (7) temporary relocation coordination, (8) financing costs such as security agreement preparation and recording or filing fees, (9) processing of individual applications for assistance, (10) income eligibility determination and verification, (11) value determination (new construction) or after rehabilitation value determination (existing structures), and (12) project-specific environmental clearance processes.