PSD Requirements definition

PSD Requirements means the Prevention of Significant Deterioration requirements found in the following:

Examples of PSD Requirements in a sentence

  • Prevention of Significant Deterioration (PSD) Requirements 326 IAC 2-2-1 DefinitionsAuthority: IC 13-14-8; IC 13-17-3Affected: IC 13-15; IC 13-17 Sec.

  • The source will be required to keep records and report in accordance with the requirements of 326 IAC 2-2-8 (Prevention of Significant Deterioration (PSD) Requirements: Source Obligation).

  • Compliance with these emissions limitations makes 326 IAC 2-2 (Prevention of Significant Deterioration (PSD) Requirements) not applicable.

  • Compliance with this emission limitation makes 326 IAC 2-2 (Prevention of Significant Deterioration (PSD) Requirements) not applicable.

  • With respect to emissions of H2S, SO2, VOCs, and CO, entry of this Consent Decree shall resolve the civil claims of the United States and Indiana against CountryMark for violations of the PSD Requirements resulting from construction or modification from the date of the pre-Lodging construction or modification through December 31, 2015.189.

  • Exclusions from Release Coverage Regarding PSD Requirements: Construction and/or Modification Not Covered by Paragraphs 186–188.

  • D.1.8 Startup/Shutdown Limits [326 IAC 2-2] (a) Pursuant to Significant Source Modification 165-15845-00022, issued March 13, 2003, and 326 IAC 2-2 (PSD Requirements), the maximum number of startup/shutdown cycles from each turbine shall not exceed 240 per twelve (12) consecutive months period rolled on a monthly basis as determined at the end of each calendar month.

  • Contingent Resolution of Claims for Violations of PSD Requirements at the FCCU Related to PM.

  • Resolution of Claims for Violating PSD Requirements at the Covered Flare.

  • Increases in emissions from units covered by this Consent Decree, where the increases result from the Post-Lodging construction or modification of any units within the Refinery, are beyond the scope of the release in Paragraphs 186–188, and CountryMark must evaluate any such increases in accordance with the PSD Requirements, and if and when ever applicable, Non-Attainment New Source Review requirements.191.

Related to PSD Requirements

  • Minimum Requirements means the minimum requirements for available commercial structures. The minimum requirements may be found at this link: https://portlandgeneral.com/energy- choices/renewable-power/green-future-impact The minimum requirements may be updated from time to time to reflect PGE’s criteria from its latest Commission accepted renewable request for proposals.

  • OHS Requirements means all Laws applicable to the Supply and related to occupational health or safety, and all of the City Policies that relate to occupational health or safety, and includes without limitation the WCA;

  • Program Requirements means that Partner has to fulfill certain program requirements as described in detail in the applicable SAP PartnerEdge Model and the PartnerEdge Program Guide.

  • Listing Requirements means the Main Market Listing Requirements of Bursa Securities.

  • Reporting Requirements As defined in Section 11.12.

  • MREL Requirements means the laws, regulations, requirements, guidelines, rules, standards and policies relating to minimum requirements for own funds and eligible liabilities applicable to the Issuer and/or the Group, from time to time, (including any applicable transitional or grandfathering provisions), including, without limitation to the generality of the foregoing, any delegated or implementing acts (such as regulatory technical standards) adopted by the European Commission and any regulations, requirements, guidelines, rules, standards and policies relating to minimum requirements for own funds and eligible liabilities adopted by the Federal Republic of Germany or the Republic of Italy, a relevant resolution authority or the European Banking Authority from time to time (whether or not such requirements, guidelines or policies are applied generally or specifically to the Issuer and/or the Group), as any of the preceding laws, regulations, requirements, guidelines, rules, standards, policies or interpretations may be amended, supplemented, superseded or replaced from time to time.

  • Design requirements means the written description of the infrastructure facility to be procured pursuant to this article, including:

  • Requirements means and include schedules, details, description, statement of technical data, performance characteristics, standards (Indian as well as International) as applicable and specified in the Contract.

  • Listings Requirements means the listings requirements of the JSE from time to time;

  • Pretreatment requirements means any substantive or procedural requirement related to pretreatment, other than a pretreatment standard, imposed on an industrial user.

  • Risk Retention Requirements means the credit risk retention requirements of Section 15G of the Exchange Act (15 U.S.C. §78o-11), as added by Section 941 of the Xxxx-Xxxxx Xxxx Street Reform and Consumer Protection Act.

  • Certification Requirements means those requirements specified or referenced in this Agreement that you must meet in order to use and maintain the Certification Designation and use the Logo in accordance with the terms of this Agreement.

  • Minimum Participation Requirements means a set of minimum training, risk management, communication and capital or collateral requirements required for Participants in the PJM Markets, as set forth herein and in the Form of Annual Certification set forth as Tariff, Attachment Q, Appendix 1. Participants transacting in FTRs in certain circumstances will be required to demonstrate additional risk management procedures and controls as further set forth in the Annual Certification found in Tariff, Attachment Q, Appendix 1.

  • JSE Listings Requirements means the Listings Requirements of the JSE applicable from time to time;

  • Storage Injection Requirements means all volumes required by the Seller for injection into underground storage, including cushion gas, and for liquification, including fuel used for injection and in liquification plants, or for such other storage projects that may be developed expressly for the protection of supply to high priority users.

  • Minimum Balance Requirements You must maintain a minimum daily balance of $2,000.00 in your Money Market Savings account to obtain the disclosed annual percentage yield. We impose a monthly maintenance fee if the balance falls below $500 any day of the month. Basic Checking Account Rate Information: This account does not pay interest.

  • Qualification Requirements means the qualification requirements as set forth in Section-2, Clause 2.1 of this RFP;

  • Mandatory City Requirements means those City laws set forth in the San Francisco Municipal Code, including the duly authorized rules, regulations, and guidelines implementing such laws that impose specific duties and obligations upon Contractor.

  • Service Requirements means the specification that the Flexibility Services must be capable of meeting, as defined in Schedule 1;

  • Authority Requirements means the operational requirements, functions and characteristics of the Framework set out in Schedule 1 (Statement of Requirements)

  • Technical Requirements means the Technical Requirements in Section VII of the tendering documents.

  • Eligibility Requirements means, with respect to any Person, that such Person (i) has total assets (in name or under management) in excess of $600,000,000 and (except with respect to a pension advisory firm or similar fiduciary) capital/statutory surplus or shareholder’s equity of $250,000,000 and (ii) is regularly engaged in the business of making or owning commercial real estate loans or operating commercial mortgage properties.

  • Applicable Technical Requirements and Standards means those certain technical requirements and standards applicable to interconnections of generation and/or transmission facilities with the facilities of an Interconnected Transmission Owner or, as the case may be and to the extent applicable, of an Electric Distributor, as published by Transmission Provider in a PJM Manual provided, however, that, with respect to any generation facilities with maximum generating capacity of 2 MW or less (synchronous) or 5 MW or less (inverter-based) for which the Interconnection Customer executes a Construction Service Agreement or Interconnection Service Agreement on or after March 19, 2005, “Applicable Technical Requirements and Standards” shall refer to the “PJM Small Generator Interconnection Applicable Technical Requirements and Standards.” All Applicable Technical Requirements and Standards shall be publicly available through postings on Transmission Provider’s internet website.

  • Reporting Requirement By January 31, 2017, the District will provide for OCR’s review and approval the Web Accessibility Policy drafted consistent with Item 1.

  • Relevant Requirements means all applicable Law relating to bribery, corruption and fraud, including the Bribery Act 2010 and any guidance issued by the Secretary of State for Justice pursuant to section 9 of the Bribery Act 2010;

  • Monitoring and reporting requirements means one or more of