Outstanding resource water definition

Outstanding resource water or “ORW" means waters designated under s. NR 102.10.
Outstanding resource water means any waters designated by the Secretary as having ex- ceptional natural, recreational, cultural, or scenic values, pursuant to 10 V.S.A. § 1424a.
Outstanding resource water or “ORW" means waters designated under s. NR 102.10. (23m) “Pollutant of concern" means a pollutant that has been identified as contributing to a water

Examples of Outstanding resource water in a sentence

  • The Board gives special consideration to stream segments “generally recognized as constituting an outstanding national resource …, or of exceptional recreational or ecological significance.” Outstanding resource water (i.e. Tier 3) designations constitute outstanding national or state resources that require protection from point and nonpoint source activities that may lower water quality [IDAPA 58.01.02.051].

  • Outstanding resource water means a high quality water, such as water of national and state parks and wildlife refuges and water of exceptional recreational significance.

  • Outstanding resource water (ORW) – The Topsail/Middle Sound ORW lies southwest of New Topsail Inlet, but does not adjoin the town of Topsail Beach.

  • Outstanding resource water classification -- rules -- criteria -- limitations-- procedure -- definition.

  • Outstanding resource water classification -- rules -- criteria -- limitations -- procedure -- definition.75-5-317.


More Definitions of Outstanding resource water

Outstanding resource water means a high quality water, such as water of national and state parks and wildlife refuges and water of exceptional recreational or ecological significance, which has been so designated by the legislature. It constitutes an outstanding national or state resource that requires protection from point source and nonpoint source activities that may lower water quality.
Outstanding resource water means waters designated as Outstanding Resource Waters by the Vermont Natural Resources Board pursuant to 10 V.S.A. §1424a.
Outstanding resource water means any waters designated by the Secretary as having exceptional natural, recreational, cultural, or scenic values, pursuant to 10 V.S.A. § 1424a.
Outstanding resource water means high quality water, such as water of national and state parks and wildlife refuges and water of exceptional recreational or ecological significance, which has been so designated by legislature.
Outstanding resource water means a high quality water, such

Related to Outstanding resource water

  • Market Participant Energy Injection means transactions in the Day-ahead Energy Market and Real-time Energy Market, including but not limited to Day-ahead generation schedules, real- time generation output, Increment Offers, internal bilateral transactions and import transactions, as further described in the PJM Manuals.

  • Non-potable water means water not safe for drinking, personal, or culinary use as determined by the requirements of 35 Ill. Adm. Code 604.

  • Day-ahead Scheduling Reserves Resources means synchronized and non-synchronized generation resources and Demand Resources electrically located within the PJM Region that are capable of providing Day-ahead Scheduling Reserves.

  • Eligible Renewable Energy Resource or “ERR” has the meaning set forth in California Public Utilities Code Section 399.12 and California Public Resources Code Section 25741, as either code provision is amended or supplemented from time to time.

  • Base Load Generation Resource means a Generation Capacity Resource that operates at least 90 percent of the hours that it is available to operate, as determined by the Office of the Interconnection in accordance with the PJM Manuals.

  • Limited Resource Price Decrement means, for the 2017/2018 Delivery Year, a difference between the clearing price for Limited Demand Resources and the clearing price for Extended Summer Demand Resources and Annual Resources, representing the cost to procure additional Extended Summer Demand Resources or Annual Resources out of merit order when the Limited Resource Constraint is binding.

  • Energy Transmission Injection Rights means the rights to schedule energy deliveries at a specified point on the Transmission System. Energy Transmission Injection Rights may be awarded only to a Merchant D.C. Transmission Facility that connects the Transmission System to another control area. Deliveries scheduled using Energy Transmission Injection Rights have rights similar to those under Non-Firm Point-to-Point Transmission Service.

  • Capacity Performance Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(a).

  • Energy Storage Resource means a resource capable of receiving electric energy from the grid and storing it for later injection to the grid that participates in the PJM Energy, Capacity and/or Ancillary Services markets as a Market Participant. Facilities Study:

  • National Pollutant Discharge Elimination System (NPDES) means the national program for issuing, modifying, revoking and reissuing, terminating, monitoring, and enforcing permits and imposing and enforcing pretreatment requirements, under Sections 307, 318, 402, and 405 of CWA. The term includes an approved program.

  • Potable water means water that is fit for human consumption;

  • Extended Summer Resource Price Adder means, for Delivery Years through May 31, 2018, an addition to the marginal value of Unforced Capacity as necessary to reflect the price of Annual Resources and Extended Summer Demand Resources required to meet the applicable Minimum Extended Summer Resource Requirement.

  • Spent nuclear fuel means fuel that has been withdrawn from a nuclear re- actor following irradiation, the con- stituent elements of which have not been separated by reprocessing.

  • Emission Control Strategy means any device, system, or strategy employed with a diesel-fueled CI engine that is intended to reduce emissions. Examples of emission control strategies include, but are not limited to, particulate filters, diesel oxidation catalysts, selective catalytic reduction systems, alternative fuels, fuel additives used in combination with particulate filters, alternative diesel fuels, and combinations of the above.

  • CAISO Global Resource ID means the number or name assigned by the CAISO to the CAISO-Approved Meter.

  • Network Resource shall have the meaning as provided in the NYISO OATT, for such resources located in New York, and the meaning as provided in the PJM OATT, for such resources located in PJM.

  • Renewable Energy Standard means the minimum renewable energy capacity portfolio, if applicable, and the renewable energy credit portfolio required to be achieved under section 28 or former section 27.

  • CAISO Grid means the system of transmission lines and associated facilities of the Participating Transmission Owners that have been placed under the CAISO’s operational control.

  • Emission control system means the electronic engine management controller and any emission related component in the exhaust or evaporative system which supplies an input to or receives an output from this controller.

  • Basic gas supply service means gas supply service that is

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Spinning Reserve means the ability to immediately and automatically increase generation or reduce demand in response to a fall in frequency;

  • Standard Methods for the Examination of Water and Wastewater means the most recent edition of Standard Methods for the Examination of Water and Wastewater published jointly by the American Public Health Association, the American Waterworks Association and the Water Environment Federation;

  • National Pollutant Discharge Elimination System Permit or “NPDES” means a permit issued by the MPCA as required by federal law for the purpose of regulating the discharge of pollutants from point sources into waters of the United States from concentrated animal feeding operations (CAFOs) as defined by federal law

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Nominated Energy Efficiency Value means the amount of load reduction that an Energy Efficiency Resource commits to provide through installation of more efficient devices or equipment or implementation of more efficient processes or systems.