Load Customer definition
Examples of Load Customer in a sentence
The Load Customer shall ensure that the Load Rejection Scheme(s) as required by the IESO in their System Impact Assessment (SIA) have been successfully installed, tested and commissioned before connecting to GLP system.
The Load Customer must submit their commissioning procedure by the date as specified in Part 7: Documents Group C.
The total (2.1 + 2.2 + 2.3) GLPL Connection Work estimated cost recoverable from the Load Customer using the GLPL Economic Evaluation Procedure (refer to Appendix F for details) approved by the Board is (Insert number in words) dollars $(Insert number).00).
The Load Customer, whenever required by GLPL to do so, shall furnish security satisfactory to GLPL for the performance by the Load Customer of its obligations for costs documented in Schedule “D” under this Agreement.
The required amount of such collateral is at least equal to the Original Additional Collateral Requirement for such Parent Power Mortgage Loan.
By (insert date), the Load Customer will have commissioned the Load Rejection Scheme(s).
As per the Transmission System Code GLP reserves the right to inspect, test and witness the commissioning of the New and/or modified Existing Load Customer Facilities that could affect the performance of the transmission system.
GLPL shall also provide to the Load Customer together with the final invoice or credit memorandum, a new Schedule "F" to replace Schedule "F" of this Agreement attached hereto and said new Schedule "F" shall be made a part hereof as though it had been originally incorporated into this Agreement.
The Load Customer shall pay a capital contribution (the ‘Capital Contribution”) which is calculated based on the Actual Cost of the GLPL Connection Work – Recoverable – Connection Facilities and GLP Connection Work – Recoverable – Network Facilities (provided a direction is obtained from the OEB) and as per the GLPL Economic Evaluation Procedure approved be the Board (plus applicable taxes) in the manner of and time of payment specified in Schedule "D".
The estimate of Actual Cost of the GLPL Connection Work is based on the preliminary estimate provided to the Load Customer on (insert date) for transmission connection plus the additional estimate for GLPL review and commissioning costs associated with the New Load Customer Facilities.