jurisdictional transmission planning criteria definition

jurisdictional transmission planning criteria means the minimum transmission network performance requirements detailed in relevant legislation, regulations or statutory instruments (including the Code)7;

Related to jurisdictional transmission planning criteria

  • Interregional Transmission Project means transmission facilities that would be located within two or more neighboring transmission planning regions and are determined by each of those regions to be a more efficient or cost effective solution to regional transmission needs.

  • Regional Transmission Organization or “RTO” means the regional transmission organization approved by the Federal Energy Regulatory Commission for the control area that includes the utility’s assigned service area (as defined in IC 8-1-2.3-2).

  • Regional Transmission Expansion Plan means the plan prepared by the Office of the Interconnection pursuant to Operating Agreement, Schedule 6 for the enhancement and expansion of the Transmission System in order to meet the demands for firm transmission service in the PJM Region. Reliability Assurance Agreement or PJM Reliability Assurance Agreement:

  • Business Critical means any function identified in any Statement of Work as Business Critical.

  • Business Criteria means any one or any combination of Income before Taxes, Net Income, Return on Equity, Return on Assets, Pre-tax Margin, Free Cash Flow, Valuation or EPS.

  • Coordinated licensure information system means an integrated process for collecting, storing, and sharing information on nurse licensure and enforcement activities related to nurse licensure laws that is administered by a nonprofit organization composed of and controlled by licensing boards.

  • ASAM criteria means the most current edition of the American Society of Addiction Medicine's published criteria for admission to treatment, continued services, and discharge.

  • Fitch Criteria means the Collateral Amount shall equal the sum of (i) the product of A multiplied by the xxxx-to-market value of the outstanding Transactions determined by Party A in good faith from time to time, and (ii) the product of B multiplied by the current aggregate notional amount of the outstanding Transactions, where:

  • Regional Transmission Enhancements means enhancements and expansions of the Transmission System that (1) a Regional Transmission Expansion Plan developed pursuant to Operating Agreement, Schedule 6 or (2) any joint planning or coordination agreement between PJM and another region or transmission planning authority set forth in Tariff, Schedule 12- Appendix B (“Appendix B Agreement”) designates one or more of the Transmission Owner(s) to construct and own or finance. Required Transmission Enhancements shall also include enhancements and expansions of facilities in another region or planning authority that meet the definition of transmission facilities pursuant to FERC’s Uniform System of Accounts or have been classified as transmission facilities in a ruling by FERC addressing such facilities constructed pursuant to an Appendix B Agreement cost responsibility for which has been assigned at least in part to PJM pursuant to such Appendix B Agreement.

  • Functional Criteria means the criteria set out in clause 27 of this Part C.

  • Regional economic integration organization means an organization constituted by sovereign States of a given region to which its member States have transferred competence in respect of matters governed by this Convention and which has been duly authorized, in accordance with its internal procedures, to sign, ratify, accept, approve or accede to this Convention;

  • Regulatory Flood Protection Elevation means the “Base Flood Elevation” plus the “Freeboard”. In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this elevation shall be the BFE plus two (2) feet of freeboard. In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least two (2) feet above the highest adjacent grade.

  • Step therapy protocol means a protocol or program that establishes the specific

  • Rating Criteria with respect to any Person, means that (i) the short-term unsecured debt obligations of such Person are rated at least “A-1” by S&P, “P-1” by Xxxxx’x and “F-1” by Fitch, if deposits are held by such Person for a period of less than one month, or (ii) the long-term unsecured debt obligations of such Person are rated at least “AA-” by S&P, “Aa3” by Xxxxx’x and “AA-” by Fitch, if deposits are held by such Person for a period of one month or more.

  • STU or State Transmission Utility means the State Transmission Utility notified by respective State Government under Sub-section (1) of Section 39 of the Act.

  • Clinical nurse specialist means a registered nurse with relevant post-basic qualifications and 12 months’ experience working in the clinical area of his/her specified post-basic qualification, or a minimum of four years’ post-basic registration experience, including three years’ experience in the relevant specialist field and who satisfies the local criteria.

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • U.S. Special Resolution Regimes has the meaning specified in Section 11.21.

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.

  • Intra-State Transmission System means any system for transmission of electricity other than an Inter-State Transmission System;

  • Anti-Static Product means a product that is labeled to eliminate, prevent, or inhibit the accumulation of static electricity. “Anti-Static Product” does not include “Electronic Cleaner,” “Floor Polish or Wax,” “Floor Coating,” and products that meet the definition of “Aerosol Coating Product” or “Architectural Coating.”

  • Critical Energy Infrastructure Information means all information, whether furnished before or after the mutual execution of this Agreement, whether oral, written or recorded/electronic, and regardless of the manner in which it is furnished, that is marked “CEII” or “Critical Energy Infrastructure Information” or which under all of the circumstances should be treated as such in accordance with the definition of CEII in 18 C.F.R. § 388.13(c)(1). The Receiving Party shall maintain all CEII in a secure place. The Receiving Party shall treat CEII received under this agreement in accordance with its own procedures for protecting CEII and shall not disclose CEII to anyone except its Authorized Representatives.

  • Capacity Transmission Injection Rights means the rights to schedule energy and capacity deliveries at a Point of Interconnection of a Merchant Transmission Facility with the Transmission System. Capacity Transmission Injection Rights may be awarded only to a Merchant D.C. Transmission Facility and/or Controllable A.C. Merchant Transmission Facilities that connects the Transmission System to another control area. Deliveries scheduled using Capacity Transmission Injection Rights have rights similar to those under Firm Point-to-Point Transmission Service or, if coupled with a generating unit external to the PJM Region that satisfies all applicable criteria specified in the PJM Manuals, similar to Capacity Interconnection Rights.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.