Examples of District Energy Facility in a sentence
DEC will purchase, install, and operate a particulate monitoring station in the Pittsburg-Antioch area, in cooperation with the Pittsburg District Energy Facility (PDEF), and in consultation with BAAQMD.
The APCO has concluded that the proposed Pittsburg District Energy Facility power plant, which is composed of the sources listed below, meets the requirements of all applicable District regulations.
The Pittsburg District Energy Facility will consist of the following permitted equipment: S-1 Combustion Gas Turbine #1, General Electric Frame 7FA Model PG 7231 or equivalent; 1,929 MM BTU per hour, equipped with dry low-NOx Combustors, abated by A-1 Selective Catalytic Reduction System and A-2 Oxidation Catalyst S-2 Heat Recovery Steam Generator #1, equipped with dry low-NOx Duct Burners, 83 MM BTU per hour, abated by A-1 Selective Catalytic Reduction System and A-2 Oxidation Catalyst.
The Pittsburg District Energy Facility has not volunteered to provide such emission offsets.
Prior to the issuance of the BAAQMD Authority to Construct for the Pittsburg District Energy Facility, the Owner/Operator shall demonstrate that valid emission reduction credits in the amount of 176.18 tons/year of Nitrogen Oxides, 112.25 tons/year of Precursor Organic Compounds, and 123.55 tons/year of PM10 or equivalent as defined by District Regulations 2-2-302.1, 2-2-302.2, and 2-2-303.1 are under their control through option to purchase contracts or equivalent binding legal documents.
This plant is now operating under the name of Port of Stockton District Energy Facility (POSDEF) Power CompanyL.P. The steam by-product fromthis plant goes to three proc- essing facilities within the same industrial complex: California Cedar Products Company, which manufactures cedar wood products including Dura Flame logs and Cargill and Liquid Sugar, both of which import raw sugar from Hawaii and manufacture various food products for human and animal consumption.
This is the Final Determination of Compliance (FDOC) for the Pittsburg District Energy Facility, LLC (PDEF), a nominal 520 MW, natural gas fired, combined cycle merchant power plant proposed by Enron Capital & Trade Resources Group.
In the Commission s Decision on the Pittsburg District Energy Facility, the PDEF Applicant was directed to work with DEC and BAAQMD to purchase, install, and operate a new particular monitoring station in the project vicinity.
Regulation 2, Rule 1, Sections 301 and 302 Pursuant to Regulation 2-1-301 and 2-1-302, the Pittsburg District Energy Facility has submitted an application to the District to obtain an Authority to Construct and Permit to Operate for the S-1 and S-3 Combustion Turbine Generators, S-2 and S-4 Heat Recovery Steam Generators, and S-5 Auxiliary Boiler.
In addition, the analysis includes an evaluation of the potential environmental impacts associated with operation of the proposed ENRON Pittsburg District Energy Facility (PDEF).