Examples of CAISO Resource ID in a sentence
At Seller’s expense, Seller shall obtain and maintain a single CAISO Resource ID dedicated exclusively to the Project and shall install all necessary metering and telemetry required by the CAISO to deliver the Product.
Where historical data is not available, Seller should reference suita Demand Response Provider (DRP) Name Investor Owned Utility (IOU) Contract ID CAISO Resource ID Historical Performance Data Load Type(s) (Air Conditioning, Energy Storage-Building Load, Pumps, Electric Vehicles, Other - describe) Dispatch Method (DRP Controlled, Customer Automated, Manual or Other - describe) Dispatch Date Dispatch Time # Registered Residential Service Accounts # Registered Non-Res.
Multiple resources can be aggregated so long as: (1) the aggregate product has a single CAISO Resource ID, (2) the aggregate product can be measured similar to having a single CAISO meter,(3) the aggregate product has one Locational Marginal Price node, and (4) the aggregate product complies with the CAISO Tariff.
Export Resource Adequacy Resources must be modeled as Physical Resources with a negative Resource Adequacy Capacity value identified by the valid CAISO Resource ID created for that export Resource.
At Seller’s expense, Seller shall (a) in the case of Front of the Meter Project, obtain and maintain a single CAISO Resource ID dedicated exclusively to the Project and install all necessary metering and telemetry required by the CAISO to deliver the Product and (b) in the case of Behind the Meter Project, install, or shall cause the Customers in Seller’s Portfolio to install all necessary metering and telemetry required by the CAISO to deliver the Product.
For Projects connected to the CAISO Transmission System, multiple ES resources can be aggregated so long as: (1) the aggregate product has a single CAISO Resource ID, (2) the aggregate product can be measured similar to having a single CAISO meter, (3) the aggregate product has one Locational Marginal Price node, and (4) the aggregate product complies with the CAISO Tariff.
At Seller’s expense, Seller shall [, or shall cause Project Company to,] (a) in the case of Front of the Meter Project, obtain and maintain a single CAISO Resource ID dedicated exclusively to the Project and install all necessary metering and telemetry required by the CAISO to deliver the Product and (b) in the case of Behind the Meter Project, install, or shall cause the Customers in Seller’s Portfolio to install all necessary metering and telemetry required by the CAISO to deliver the Product.
Table 3Existing and Future Contracts with New Builds (MW) - Resources Currently without CAISO Resource ID or WECC CEC-RPS-IDCapacity Inputs (MW) Candidate ResourceChart 3 4.
At Seller’s expense, Seller shall, or shall cause Project Company to, (a) in the case of Front of the Meter Project, obtain and maintain a single CAISO Resource ID dedicated exclusively to the Project and install all necessary metering and telemetry required by the CAISO to deliver the Product and (b) in the case of Behind the Meter Project, install, or shall cause the Customers in Seller’s Portfolio to install all necessary metering and telemetry required by the CAISO to deliver the Product.
The Electrical Delivery Point for the Unit is described as follows: Distribution area (e.g. PG&E): ___________ Existing zone (e.g. NP-15): ___________ Load zone: ___________ Delivery Point: ___________ (which is the physical interconnection point to the CAISO Grid with a corresponding PNode of [insert]) CAISO Resource ID: ___________ Delivery Point address: ___________ Substation: ___________ Additional Information: [Provide one line diagram for Unit(s).