Bridge Building definition
Examples of Bridge Building in a sentence
CalHR shall authorize mentoring leave in support of Habitat for Humanity, statewide and regional Science and Engineering Fairs, the California Academic Decathlon, the California Bridge Building Competition, and the Promoting Readiness for Engineering Professions Foundation as approved programs under this Section.
Code Section 1938, Tenant is hereby notified that, as of the date hereof, the 1600 Bridge Building and the 1800 Bridge Building have not undergone an inspection by a "Certified Access Specialist" and Landlord states the following: "A Certified Access Specialist (CASp) can inspect the subject premises and determine whether the subject premises comply with all of the applicable construction-related accessibility standards under state law.
Landlord also reserves the right to restrict the number and size of dishes, antennae and other Rooftop Equipment in addition to the Initial Rooftop Equipment installed on the roof of the 3400 Bridge Building in its sole discretion.
During the Lease Term and subject to the terms of this Article 59, Tenant may install on the roof of the 3400 Bridge Building telecommunications antennae, microwave dishes or other communication equipment, as necessary for the operation of Tenant's business within the Premises, including any cabling or wiring necessary to connect this rooftop equipment to the Premises (collectively, the "Rooftop Equipment").
The Property comprises office premises located at part of the second floor and the whole of the third floor of Golden Bridge Building, A.
Subject to the requirements of this Suite 100 Tenant Work Letter, including without limitation Landlord’s approval rights hereunder, Tenant may, as part of the Suite 100 Second Expansion Space Improvements, paint walls, change floor coverings and display company branding in the main lobby, first floor and second floor of the 3400 Bridge Building.
So long as Tenant leases all of the rentable area in the 3000 Bridge Building, the 3000 Bridge Monument Signage shall be the only tenant signage on the monument sign for the 3000 Bridge Building.
Tenant acknowledges that, except in the case of an emergency or when a 3400 Bridge Building engineer is not made available to Tenant in sufficient time to allow Tenant to avoid or minimize interruption of use of the Rooftop Equipment, advance notice is required and a 3400 Bridge Building engineer must accompany all persons gaining access to the rooftop.
Tenant shall construct any such mezzanine in the Bridge Building so that no part of such mezzanine is south of the lowest ceiling bow truss.
The excellent organizational skills of the Spaghetti Bridge Building Group were again seen on Saturday when around 100 Court and experienced the fascina- tion of making floating concrete, a 10-minute electric motor, and candy and tooth-pick structures.