Actual Starting Reliability Factor definition

Actual Starting Reliability Factor or “ASRF” has the meaning set forth in Section F of the Gates Transaction.
Actual Starting Reliability Factor or “ASRF” has the meaning set forth in Section F of the Panoche Transaction.
Actual Starting Reliability Factor or “ASRF” has the meaning set forth in Section F of the Fresno Transaction.

Related to Actual Starting Reliability Factor

  • Quality factor (Q) means the modifying factor, listed in Tables I and II of 38.4(4), that is used to derive dose equivalent from absorbed dose.

  • Sustainability Factors means environmental, social and employee matters, respect for human rights, anti‐corruption and anti‐bribery matters.

  • Annual Statement of Compliance As defined in Section 3.13.

  • Actual weight means the actual unladen weight of a vehicle or combination of

  • Load Factor means the percentage of aircraft seats actually occupied on a flight (RPMs divided by ASMs). “NMB” means the National Mediation Board.

  • Capacity factor means the ratio of the average load on a machine or equipment for the period of time considered to the capacity rating of the machine or equipment.

  • Gross Standard Volume as herein used means volume corrected to a temperature of sixty degrees (60°) Fahrenheit, in accordance with the latest API/ASTM measurement standards, and at equilibrium vapor pressure.

  • Annual Statement means that statement required by Iowa Code section 508.11 to be filed annually by the company with the office of the commissioner.

  • HICP Daily Inflation Reference Index means (A) in relation to the first calendar day of any given month, the HICP Monthly Reference Index of the third month preceding such month, and (B) in relation to a calendar day (D) (other than the first calendar day) in any given month (M), the linear interpolation of the HICP Monthly Reference Index pertaining respectively to the third month preceding such month (M - 3) and the second month preceding such month (M - 2) calculated in accordance with the following formula:

  • Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.

  • Locational Deliverability Area Reliability Requirement means the projected internal capacity in the Locational Deliverability Area plus the Capacity Emergency Transfer Objective for the Delivery Year, as determined by the Office of the Interconnection in connection with preparation of the Regional Transmission Expansion Plan, less the minimum internal resources required for all FRR Entities in such Locational Deliverability Area.

  • Pre-Contractual Statement means a draft agreement, undertaking, representation, warranty, promise, assurance or arrangement of any nature whatsoever, whether or not in writing, relating to this Agreement made or given by a Party to this Agreement or any other person at any time prior to the date of this Agreement.

  • Actual Uptime means, of the Total Operation Hours, the aggregate number of hours in any month during which each equipment is actually available for use.

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Non-Participating Certified Clinical Nurse Specialist means a Certified Clinical Nurse Specialist who does not have a written agreement with the Claim Administrator or another Blue Cross and/or Blue Shield Plan to provide services to you at the time services are rendered.

  • CPI Daily Inflation Reference Index means (A) in relation to the first day of any given month, the CPI Monthly Reference Index of the third month preceding such month, and (B) in relation to a day (D) (other than the first day) in any given month (M), the linear interpolation of the CPI Monthly Reference Index pertaining respectively to the third month preceding such month (M - 3) and the second month preceding such month (M - 2) calculated in accordance with the following formula:

  • Yearly (1/Year) sampling frequency means the sampling shall be done in the month of September, unless specifically identified otherwise in the effluent limitations and monitoring requirements table.

  • Weighting factor wT for an organ or tissue (T) means the proportion of the risk of stochastic effects resulting from irradiation of that organ or tissue to the total risk of stochastic effects when the whole body is irradiated uniformly. For calculating the effective dose equivalent, the values of wT are:

  • Quarterly (1/Quarter) sampling frequency means the sampling shall be done in the months of March, June, August, and December, unless specifically identified otherwise in the Effluent Limitations and Monitoring Requirements table.

  • Service Level means the standard set forth below by which IBM measures the level of service it provides in this SLA.

  • PJM Region Reliability Requirement means, for purposes of the Base Residual Auction, the Forecast Pool Requirement multiplied by the Preliminary PJM Region Peak Load Forecast, less the sum of all Preliminary Unforced Capacity Obligations of FRR Entities in the PJM Region; and, for purposes of the Incremental Auctions, the Forecast Pool Requirement multiplied by the updated PJM Region Peak Load Forecast, less the sum of all updated Unforced Capacity Obligations of FRR Entities in the PJM Region.

  • Baseline actual emissions means the rate of emissions, in tons per year, of a regulated NSR pollutant, as determined in accordance with paragraphs (i) through (iv) of this definition.

  • Mean Sea Level means the average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For the purposes of this Ordinance, the term is synonymous with the National Geodetic Vertical Datum (NGVD) of 1929, the North American Vertical Datum (NAVD) of 1988, or other datum, to which Base Flood Elevations shown on a community's Flood Insurance Rate Map are referenced.

  • Actual/360 means that interest is calculated on the basis of the actual number of days elapsed in a year of 360 days.

  • Peer support specialist means an individual who has experienced a severe and persistent mental illness and who has successfully completed standardized training to provide peer support services through the medical assistance program or the Iowa Behavioral Health Care Plan.