Whether the proposed Generating Sample Clauses

Whether the proposed Generating. Facility incorporates a time delay function to prevent reconnection of the generator to the system until system voltage and frequency are within normal limits for a prescribed time.
AutoNDA by SimpleDocs

Related to Whether the proposed Generating

  • Parties to the Process a) There shall be established a Central Dispute Resolution Committee (“The Committee”), which shall be composed of equal representation of up to four (4) representatives each of the employer bargaining agency and employee bargaining agency (“the central parties”), and up to three representatives of the Crown. The Committee will be co-chaired by a representative from each bargaining agency. All correspondence to the committee will be sent to both co-chairs.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • FABRICATION Making up data or results and recording or reporting them.

  • Dark Fiber Transport Dark Fiber Transport is defined as Dedicated Transport that consists of unactivated optical interoffice transmission facilities without attached signal regeneration, multiplexing, aggregation or other electronics. Except as set forth in Section 6.9.1 below, BellSouth shall not be required to provide access to Dark Fiber Transport Entrance Facilities pursuant to this Agreement.

  • Acceptance into the Program These terms and conditions are subject to your acceptance into the program by both XOOM Energy and your NGDC. You will be promptly notified with confirmation of the switch to XOOM Energy in writing.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Trunk Group Connections and Ordering 5.2.1 For both One-Way and Two-Way Interconnection Trunks, if Onvoy wishes to use a technically feasible interface other than a DS1 or a DS3 facility at the POI, the Parties shall negotiate reasonable terms and conditions (including, without limitation, rates and implementation timeframes) for such arrangement; and, if the Parties cannot agree to such terms and conditions (including, without limitation, rates and implementation timeframes), either Party may utilize the Agreement’s dispute resolution procedures.

  • Load Shedding The Distributor may carry out Load Shedding in the following circumstances:

  • Construction Sequencing In general, the sequence of the proposed dates of Initial Operation of Interconnection Customers seeking interconnection to the Transmission System will determine the sequence of construction of Network Upgrades.