Use Case 2 Clause Samples

Use Case 2. Forced convection around a sphere The two solvers are compared, in terms of performance and accuracy, for the case of forced convection around a single sphere. Figure 2 shows that the old CFDEM solver (CFDEM-FD) tends to over predict the Nusselt number, while the HFD-IBM predicts a Nusselt number in the range of the correlations found in literature. It is noteworthy that the new HFD-IBM solver uses a significantly coarser mesh than the old CFDEM solver.
Use Case 2. Advanced configuration and supply scenario
Use Case 2 

Related to Use Case 2

  • Use Cases Subscription Services are provided for Software only when used for its supported purpose (“Use Case”). The Use Case determines which Subscription is required and what fees are charged. If you use or deploy the Software in a manner contrary to a supported Use Case, you are responsible for purchasing the appropriate Subscription(s) to cover such usage. For example, if you are using a Red Hat Enterprise Linux Desktop Subscription as a server, you are obligated to purchase a Red Hat Enterprise Linux Server Subscription.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Software Use Case Red Hat Enterprise Linux Developer Suite Subscription Services for Red Hat Enterprise Linux Developer Suite are available for Development Purposes only.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the ▇▇▇▇▇ Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/▇▇▇▇▇▇▇ KXM-550, GE Grid Solutions KOTEF ▇▇▇.▇▇, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556