Trial Area Clause Samples

Trial Area. 7.1.1. All Operators shall be required to operate in all Full-service Boroughs and their vehicles will also be permitted to travel through all Ride-through Boroughs. The list of trialling Boroughs may change over time, and Operators’ operations will need to change to reflect any increase or decrease in the scope of the Trial. 7.1.2. The map below identifies Boroughs that are likely to be Participating Boroughs from TP Day 1 of Trial Period 1 (date to be agreed after Contract Award as noted in section 6 above). It should be noted that there are no guarantees that these are the exact Boroughs that are part of the Trial on TP Day 1 of Trial Period 1, that Boroughs will take the role indicated below or that there will be this many Participating Boroughs, but Operators are required to confirm they can deliver e-scooters to at least 11 Full-service Boroughs from TP Day 1 of Trial Period 1. 7.1.3. Given the nature of the Trial, we cannot guarantee the size or spread of the Trial Area. Operators must however agree to operate in all Boroughs within Greater London which issue an Operator Contract Request. While unlikely, this means the maximum potential coverage of this Trial would be 32 London Boroughs and the City of London, potentially including private (or other) land sites by agreement. At the time of launching this procurement, Operators should note that other Boroughs have expressed interest to varying degrees in joining the trial at a point later than Trial Period 1. The total number of Boroughs to express interest without formal commitment so far is around two thirds of the total. We are also discussing the Trial with major private landowners that may wish to participate more widely e.g. the Canary Wharf Group. 7.1.4. All e-scooters used in the Trial shall be permitted to be ridden through, parked in and rented from each and every Full-service Borough. All e- scooters used in the Trial shall also be permitted to travel through each and every Ride-through Borough, but not be parked. This shall have the effect that the Participating Boroughs form a single Trial Area for the purposes of Operators and Users. E-scooters cannot be used in Non- participating Boroughs.
Trial Area. The Contractor shall arrange for a trial area of bituminous concrete to be laid in an area to the required thickness using the plant and methods to be used for the permanent surfacing to the full width normally produced by the plant and not less than 50 metres long. Samples shall be taken and tested in accordance with the relevant clauses of Section 1 from a representative part of the road base, base course, and surfacing where directed by the Project ▇▇▇▇▇▇▇.▇▇ case the trial lay fails to meet the design standards, the mix and/or workmanship shall be adjusted and new trial lays repeated until a satisfactory and Specification complying layer is achieved, all to the expense of the Contractor. At the risk of the Contractor the trial area may be laid as part of the permanent work. In that case any layer proved by tests to be defective shall be removed by the Contractor at his own cost. The Contractor shall allow for the cost of complying with the above in his tender.
Trial Area. The Contractor shall demonstrate the ability to produce and place microsurfacing by successfully placing a trial mix over an area 100 m long and one wide prior to full production of the work.

Related to Trial Area

  • School Improvement The parties do hereby mutually agree that the school improvement process currently in effect will continue. Any plan developed by the committees shall not be in conflict with the master agreement or board policy.

  • Capacity Building 1. Contractor will work in partnership with AOD to study the viability of billing under Drug Medi-Cal and 3rd party payer. 2. Contractor will document and track consumers who are CalWORKS eligible.

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.

  • Building With respect to each parcel of Real Estate, all of the buildings, structures and improvements now or hereafter located thereon. Business Day. Any day on which banking institutions located in the same city and State as the Agent’s Head Office are located are open for the transaction of banking business and, in the case of LIBOR Rate Loans, which also is a LIBOR Business Day.

  • Building Permit The Owner shall pay for all permits. The Owner and AE shall be required to provide such information to the Permitting Authority as is necessary to obtain approval from the Permitting Authority to commence construction prior to beginning construction. The CM shall pull the Building Permit, and shall be responsible for delivering and posting the Building Permit at the Project Site prior to the commencement of construction. The Owner and AE shall fully cooperate with the CM when and where necessary.