Formation Documents With respect to the Issuing Entity, the Certificate of Trust and the Trust Agreement, (ii) with respect to the Grantor Trust, the Grantor Trust Certificate of Trust and the Grantor Trust Agreement, and (iii) with respect to the Depositor, the certificate of formation of the Depositor filed in Delaware, dated as of January 4, 2019 and the amended and restated limited liability company agreement of the Depositor, dated as of March 27, 2019, made by the Sponsor, as member.
Licensed Documentation If commercially available, Licensee shall have the option to require the Contractor to deliver, at Contractor’s expense: (i) one (1) hard copy and one (1) master electronic copy of the Documentation in a mutually agreeable format; (ii) based on hard copy instructions for access by downloading from the Internet
Construction Document Phase 1.4.1 Based on the approved Design Development Documents, Guaranteed Maximum Price, coordinated models and any further adjustments in the scope or quality of the Project or in the Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Construction Documents consisting of Drawings, Schedules and Specifications derived from the model(s) in accordance with Owner’s written requirements setting forth in detail the requirements for construction of the Project, including, without limitation, the BIM Execution Plan and “Facility Design Guidelines”. The Plans, Drawings and Specifications for the entire Project shall be so prepared that same will call for the construction of the building and related facilities, together with its built-in permanent fixtures and equipment which will cost not more than the Guaranteed Maximum Price accepted by Owner, or the Amount Available for the Construction Contract established by Owner if no Guaranteed Maximum Price proposal has been accepted by Owner. The Architect/Engineer will be responsible for managing the design to stay within such Guaranteed Maximum Price proposal or Amount Available for the Construction Contract. The Architect/Engineer shall review the Construction Documents as they are being prepared at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Construction Documents. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.4.2 As a part of Construction Documents Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Model coordination shall occur at all reviews during the Construction Documents Phase as identified in the BIM Execution Plan. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.4.3 The Architect/Engineer shall consult with the Owner and Construction Manager on matters such as construction phasing and scheduling, bid or proposal alternates, liquidated damages, the construction contract time period, and other construction issues appropriate for the Project. The Architect/Engineer shall assist the Owner and Construction Manager in the preparation of the necessary bidding information, bidding forms, RFP information, and RFP forms, and the Conditions of the Contract. 1.4.4 The Architect/Engineer shall assist the Owner in connection with the Owner’s responsibility and procedures for obtaining approval of all building and accessibility authorities having jurisdiction over the Project. 1.4.5 The Architect/Engineer shall provide coordination and inclusion of sequence of operations for all operable systems in the facility as defined by Owner during Design Development. 1.4.6 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.4.7 The Architect/Engineer shall participate in a final review of the Construction Documents and model(s) with the Owner and Construction Manager at the Project location or other location specified by Owner in the State of Texas. Prior to the Owner’s approval of the Construction Documents, the Architect/Engineer shall incorporate such changes as are necessary to satisfy the Owner’s review comments. 1.4.8 The Architect/Engineer shall provide a list of all manufacturer warranties and submittals that are required by their specification. 1.4.9 Before proceeding into the Bidding and Proposal Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Construction Documents and approval of the Final Amount Available for the Construction Contract as approved by the Board of Regents.
Closing Documentation The Parent shall have received the --------------------- following documents, agreements and instruments from the Company: (i) an opinion of ▇▇▇▇ ▇▇▇▇ ▇▇▇▇ & Freidenrich LLP, dated the Closing Date and addressed to the Parent and Newco, in substantially the form of Exhibit F hereto; --------- (ii) certificates dated as of a recent date from the Secretary of State of the States of Delaware and any other applicable states to the effect that each of the Company and its Subsidiaries is duly incorporated and in good standing in such state and stating that the Company and its Subsidiaries owes no franchise taxes in such state and listing all documents of the Company and its Subsidiaries on file with said Secretary of State; (iii) a copy of the Certificate of Incorporation of the Company, including all amendments thereto, certified as of a recent date by the Secretary of State of the State of Delaware; (iv) evidence, reasonably satisfactory to the Parent, of the authority and incumbency of the persons acting on behalf of the Company in connection with the execution of any document delivered in connection with this Agreement; (v) Uniform Commercial Code Search Reports on Form UCC-11 with respect to the Company and its Subsidiaries from the states and local jurisdictions where the principal place of business of the Company and its Subsidiaries and their respective assets are located, the search reports of which shall confirm compliance with Section 3.15 (and Schedule thereto) of this Agreement; (vi) the corporate minute books and stock record books of the Company and its Subsidiaries; (vii) estoppel letters of lenders to the Company, in form and substance reasonably satisfactory to the Parent, with respect to amounts (including any pre-payment penalties) owing by the Company as of the Closing; and (viii) such other instruments and documents as the Parent shall reasonably request not inconsistent with the provisions hereof.
Product Documentation You should review the policy documents carefully to ensure they accurately reflect the cover, conditions, limits and other terms that you require. Particular attention should be paid to policy conditions and warranties as failure to comply with these could invalidate your policy. Claims can arise, under certain types of insurance contract, long after the expiry of the policy. It is therefore important that you retain and keep safely all documents associated with your policy.