Temporary Scheduler Sample Clauses

Temporary Scheduler. Temporary Scheduler positions will be determined by the Director of Transportation and filled from the District eligible pool on the basis of the best qualified employee who meets the department’s needs. The applicant awarded the temporary Scheduler position will be allowed to bid on regular school year routes, and will revert back to their regular driver status (seniority position) on release days.

Related to Temporary Scheduler

  • Temporary Schedule Changes Overtime-eligible employees’ workweeks and/or work schedules may be temporarily changed with prior notice from the Employer. A temporary schedule change is defined as a change lasting thirty (30) calendar days or less. With the exception of the job classifications listed in Appendix B, overtime-eligible employees will receive three (3) calendar days’ written notice of any temporary schedule change. The day that notification is given is considered the first day of notice. Adjustments in the hours of work of daily work shifts during a workweek do not constitute a temporary schedule change.

  • Temporary Roads As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Purchaser shall employ such measures as out- sloping, drainage dips, and water-spreading ditches.

  • Temporary Upgrade An employee in a temporary upgrade status shall have no right to grieve or arbitrate release from such temporary upgrade status.

  • Temporary Structures Installation of temporary construction-related structures including scaffolding, barriers, screening, fences, protective walkways, signage, office trailers or restrooms.

  • Temporary Work 3.4.1 The Contractor shall have the sole responsibility for the design, erection, operation, maintenance, removal and repair of Temporary Work. 3.4.2 The Contractor shall engage and pay for registered professional engineering Personnel skilled in the appropriate disciplines to perform those functions referred to in GC 3.4.1 where required by Laws or by the Agreement and in all cases where such Temporary Work is of such a nature that professional engineering skill is required or prudent to produce safe and satisfactory results. 3.4.3 Notwithstanding the provisions of 3.1 - CONTROL OF THE WORK, GC 3.4.1 and