Scheduler Sample Clauses

Scheduler. 1. To assist in the preparation and maintenance of the Schedule, the Design-Builder may engage, at its own expense, a consultant who is skilled in the application of network techniques for construction projects and the use of Primavera scheduling software. If the Design-Builder has qualified personnel on staff, the Design-Builder may perform the required scheduling with its own organization.
AutoNDA by SimpleDocs
Scheduler. 13.2.1 Bidding for Scheduler positions (shift arrangements) shall occur in the event of a vacancy in a permanent Scheduler position and annually prior to the start of a school year.
Scheduler.  Parties agree to an expedited arbitration process which utilizes the use of a central scheduler appointed by the parties  The role of the scheduler will be to set hearing dates (including continuation dates) and select arbitrators  The scheduler will be paid by the hour for work performed. This will be a shared cost as between the parties for each specific referral  The parties will mutually agree to such scheduler. If the parties cannot agree then the scheduler will be selected by an arbitrator appointed by the Ministry of Labour.
Scheduler. 1. When required by the Commission, to assist in the preparation and maintenance of the Schedule, the Contractor may engage, at its own expense, a consultant who is skilled in the application of network techniques for construction projects and the use of specified scheduling software. If the Contractor has qualified personnel on staff, the Contractor may perform the required scheduling with its own organization.
Scheduler. 1.8.2 KPI's/utilisation
Scheduler. Contractor shall retain a construction scheduler to work in enough capacity to perform all of the Contractor’s requirements to prepare the Construction Schedule. The Scheduler shall plan, coordinate, execute, and monitor a cost/resource loaded critical path method (CPM) schedule as required for Project and have a minimum of five (5) years direct experience using CPM. Scheduler will cooperate with District and shall be available on site for monitoring, maintaining and updating schedules in a timely manner. District has the right to reject the Scheduler based upon a lack of experience as required by this Document or based on lack of performance and timeliness of schedule submittals/fragnets on past projects. Contractor shall within seven (7) calendar days of District’s rejection, propose another scheduler who meets the experience requirements stated above. Administrative Personnel: Five (5) years minimum experience in using and monitoring schedules on comparable projects.
Scheduler. The Scheduler manages the monitoring process of the blog library. Through the ping server the Spider will receive updates of blog posts from blog hosts that are connected to the actual ping server, so fetching will not normally be needed. But the Scheduler will run control fetching of blog hosts with no updates within a defined time range – e. g. weekly. This will check if the blog is active or shut down, and if the ping server is missing out updates. Additionally, the Scheduler will handle blogs not connected to ping servers and comments which normally are not handled by the specified ping servers. The Scheduler will then request the RSS Comments and RSS for non ping server listed blog hosts for updates, and then let the Fetcher download the HTML.
AutoNDA by SimpleDocs
Scheduler. This class is responsible for pre-scheduling the request with scheduling strategies and returning where the request can be scheduled. •
Scheduler. DESCRlPTION OF THE EQUIPMENT All equipment, furniture, fixtures, machines, building materials and items of personal prope1iy and all appurtenances (A) constructed, reconstructed, renovated, installed, equipped and/or intended to be constructed,. reconstiucted, renovated, installed, equipped in connection with the construction, reconstruction, renovation, installation and/or equipping of the XX Xxxxx Corp. ("RBC") and Beaverkill Studio Irie. ("BSI" and together with RBC collectively, the "Company") project located on the real property described on Schedule A hereto, said Project to be constructed, reconstructed, renovated, installed, equipped by the Company as agent of the Agency pursuant to the Agent Agreement, dated December 14, 2015 and the Leaseback to Company; and (B) now or hereafter attached to, contained in or used in connection with the Land or placed on any part thereof, though not attached thereto, including but not limited to, pipes, screens, fixtures, heating, lighting, plumbing, ventilation, air conditioning, compacting and elevator plants, telephone and information systems, furniture, rugs, movable partitions, cleaning equipment, maintenance equipment, shelving, signs, waste containers, outdoor benches, drapes, blinds and accessories, sprinkler systems and other fire prevention and extinguishing apparatus.
Scheduler. The Scheduler is responsible for preparing detailed and complex project or construction schedules using Primavera or similar computer software, or is responsible for detailed analysis and evaluation of such schedules prepared by others. The Scheduler performs analysis and evaluation of the impacts of construction activities at the site and their impact on normal operations at the site. The Scheduler performs analysis and evaluation of change orders, claims, and other project events and reports on their impacts on the construction quality and schedule.