Surcharge Loads Sample Clauses

Surcharge Loads. Loads include but are not limited to: Railroad vertical and centrifugal loading, railroad service vehicles (HS-20 truck), roadway loading, fills placed above the top of shoring, construction equipment, crane pads, future grading and paving, structures, material storage piles, and snow. • Dead load assumptions to be used for design: o Spoil pile: must be included assuming a minimum height of two feet of soil adjacent to the excavation. o Track: use 200 lbs/linear-ft for rails, inside guardrails and fasteners. o Roadbed: ballast, including track ties, use 120 lbs per cubic foot. • For specific applications of the Xxxxxx E80 live load, refer to in Appendix 5.1, which illustrates Live Load Pressure Due to Xxxxxx E80.
AutoNDA by SimpleDocs
Surcharge Loads. Loads include but are not limited to: Railroad vertical and centrifugal loading, railroad service vehicles (HS-20 truck), roadway loading, fills placed above the top of shoring, construction equipment, crane pads, future grading and paving, structures, material storage piles, and snow. • Dead load assumptions to be used for design: o Spoil pile: must be included assuming a minimum height of two feet of soil adjacent to the excavation. o Track: use 200 lbs/linear-ft for rails, inside guardrails and fasteners. o Roadbed: ballast, including track ties, use 120 lbs per cubic foot. • For specific applications of the Xxxxxx E80 live load, refer to in Appendix 5.1, which illustrates Live Load Pressure Due to Xxxxxx E80. • Additional analysis for centrifugal force calculations as described in AREMA Vol. 2, Ch. 15, Article 1.3.6. Centrifugal Loads are required where shoring is located along the outer side of curved track and track curvature exceeds three degrees. • Lateral pressure from to infinite and uniform surcharge load. o The surcharge can effectively be treated as another soil layer, whereby the vertical surcharge pressure is multiplied by the active or at-rest earth pressure coefficient as shown below: Where: = 0 = 0 UA – Uniform lateral surcharge pressure for active condition (lbf/ft2) U0 – Uniform lateral surcharge pressure for at-rest condition (lbf/ft2) KA - Active earth pressure coefficient K0 – At-rest earth pressure coefficient q - Uniform surcharge load (lbf/ft2) • Lateral pressure from to point, line, uniform strip, and rectangular-area surcharge loads. o Equations shall be based on Boussinesq theory (i.e., elastic theory) and a rigid wall condition.
Surcharge Loads. Surcharge loading resulting from presence of adjoining structures shall be fully considered in design of foundation walls. Surcharge loading resulting from presence of adjoining traffic lane shall be fully considered in design of foundation walls. For walls not adjacent to other structures or traffic lanes, a minimum surcharge load of 300 psf shall be considered in the design of foundation walls.

Related to Surcharge Loads

  • Monthly Data Download Not later than fifteen (15) days after the end of each month, beginning with the month in which the Commencement Date occurs and ending with the Final Shared-Loss Month, Assuming Institution shall provide Receiver:

  • Remittance Processing Services In order to provide a means of collection of the Receivables which will allow the Trustee to receive the proceeds of the Receivables and related security without AmeriCredit or its Affiliates having access to the funds, the parties hereto agree for the benefit of the Trustee that the processing services (the “Service(s)”) of Processor will be used for the collection and the deposit of remittances related to the Receivables and related security.

  • Data Collection, Processing and Usage The Company collects, processes and uses the International Participant’s personal data, including the International Participant’s name, home address, email address, and telephone number, date of birth, social insurance number or other identification number, salary, citizenship, job title, any shares of Common Stock or directorships held in the Company, and details of all Equity Awards or any other equity compensation awards granted, canceled, exercised, vested, or outstanding in the International Participant’s favor, which the Company receives from the International Participant or the Employer. In granting the Equity Award under the Plan, the Company will collect the International Participant’s personal data for purposes of allocating shares of Common Stock and implementing, administering and managing the Plan. The Company’s legal basis for the collection, processing and usage of the International Participant’s personal data is the International Participant’s consent.

  • Customer Remittances Obligors of the Receivables will be directed by AmeriCredit to forward their remittances to Processor at a post office address (the “Lockbox”) assigned by Processor. Processor, acting for the exclusive benefit of the Trustee, shall have unrestricted and exclusive access to the mail directed to this address. AmeriCredit agrees to notify Processor thirty (30) days in advance of any change in Obligor remittance statements and/or mailing schedule.

  • Calculations Respecting Mortgage Loans Calculations required to be made pursuant to this Agreement with respect to any Mortgage Loan in the Trust Fund shall be made based upon current information as to the terms of the Mortgage Loans and reports of payments received from the Mortgagor on such Mortgage Loans and payments to be made to the Securities Administrator as supplied to the Securities Administrator by the Master Servicer. The Securities Administrator shall not be required to recompute, verify or recalculate the information supplied to it by the Master Servicer or any Servicer.

  • Order Processing Any order by you for the purchase of shares of the respective Funds through us shall be accepted at the time when it is received by us (or any clearing house agency that we may designate from time to time), and at the offering and sale price next determined, unless rejected by us or the respective Funds. In addition to the right to reject any order, the Funds have reserved the right to withhold shares from sale temporarily or permanently. We will not accept any order from you that is placed on a conditional basis or subject to any delay or contingency prior to execution. The procedures relating to the handling of orders shall be subject to instructions that we shall forward from time to time to all members of the Selling Group. The shares purchased will be issued by the respective Funds only against receipt of the purchase price, in collected New York or Los Angeles Clearing House funds subject to deduction of all concessions on such sale (reallowance of any concessions to which you are entitled on purchases at net asset value will be paid through our direct purchase concession system). If payment for the shares purchased is not received within three days after the date of confirmation the sale may be cancelled forthwith, by us or by the respective Funds, without any responsibility or liability on our part or on the part of the Funds, and we and/or the respective Funds may hold you responsible for any loss, expense, liability or damage, including loss of profit suffered by us and/or the respective Funds, resulting from your delay or failure to make payment as aforesaid.

  • Data Collection Some downloaded software included in the Materials may generate and collect information about the software and usage and transmit it to Intel to help improve Intel’s products and services. This collected information may include product name, product version, time of event collection, license type, support type, installation status, hardware and software performance, and use. 9.

  • Equipment, Etc Each Grantor shall, (i) within ten (10) days after a written request by the Administrative Agent, in the case of Equipment now owned, and (ii) following a request by the Administrative Agent pursuant to subclause (i) above, within ten (10) days after acquiring any other Equipment, deliver to the Administrative Agent, any and all certificates of title, and applications therefor, if any, of such Equipment and shall cause the Administrative Agent to be named as lienholder on any such certificate of title and applications. No Grantor shall permit any such items to become a fixture to real estate or an accession to other personal property unless such real estate or personal property is the subject of a fixture filing (as defined in the UCC) creating a first priority perfected Lien in favor of the Administrative Agent.

  • Billing and Collection The Originating party shall xxxx and collect such information service charges and shall remit the amounts collected to the Terminating Party less:

Time is Money Join Law Insider Premium to draft better contracts faster.