Summary of First Architecture Sample Clauses

Summary of First Architecture. Our first approach, described in the first deliverable of QualiMaster, did not yield performance improvement. Recall that in order to obtain proper functionality we used the stream offset functionality of Maxeler that preserves a buffer containing the elements of a specific, predefined window of data. We selected the specific functionality to access data that appear after the current data sample that is flowing through the DFE. This was necessary to obtain the whole dot product computation. Moreover each element of the xi vector, which remains constant during the summation loop, was sent into the DFE as a scalar, and therefore was stored in the FPGA in a register. Hence, these elements were always available for kernel computation. However, this also limited the possible size of input vector xias it had to equal at most the available number of registers in the DFE. Thus, our first approach could not be tested with datasets whose feature space was more than a few tens of features which led to our second approach.
AutoNDA by SimpleDocs

Related to Summary of First Architecture

  • Architecture The Private Improvements shall have architectural features, detailing, and design elements in accordance with the Project Schematic Drawings. All accessory screening walls or fences, if necessary, shall use similar primary material, color, and detailing as on the Private Improvements.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

  • Overview (a) The Employer is committed to maintaining a stable and skilled workforce, recognising its contribution to the operation of the Employer. As such, full time direct and ongoing employment is a guiding principle of this Agreement.

  • System Description The wet detention basin is designed to trap 80% of sediment in runoff and maintain pre-development downstream peak flows. The basin has two forebays (smaller ponds) located at the low end of two grass xxxxxx. In addition to runoff conveyance, the grass xxxxxx also allow infiltration and filtering of pollutants, especially from smaller storms. The forebays are each 4 feet deep. They are connected to the main pool by 18 and 24-inch metal pipes that outlet onto a rock chute. The forebays will trap coarse sediments in runoff, such as road sands, thus reducing maintenance of the main basin. The main pool will trap the finer suspended sediment. To do this, the pond size, water level and outlet structures must be maintained as specified in this Agreement (see Figures 1, 2 and 3). The main basin receives runoff from a 67.1 acre drainage area (41.2 acres within the subdivision and 25.9 acres off-site drainage coming from the east). During high rainfall or snow melt events, the water level will temporarily rise and slowly drain down to the elevation of the control structure. The water level is controlled by a 12-inch concrete pipe extending through the berm in the northwest corner of the basin (see Figures 1 and 3). On the face of the 12-inch pipe, there is metal plate with a 3-inch drilled hole (orifice) with stone in front of it. This orifice controls the water level and causes the pond to temporarily rise during runoff events. Washed stone (1- 2” diameter) is placed in front of the orifice to prevent clogging. High flows may enter the grated concrete riser or flow over the rock lined emergency spillway. “As-built” construction drawings of the basin, showing actual dimensions, elevations, outlet structures, etc. will be recorded as an addendum(s) to this agreement within 60 days after [Municipality Name] accepts verification of construction from the project engineer.

  • STATEMENT OF PHILOSOPHY The University of Minnesota and the Union are committed to recognizing and acknowledging the healthy and positive diversity that we have on the University campuses. Further, the parties recognize that all employees have the right to work in a productive environment in which there is no verbal or physical intimidation, or discrimination or harassment based on the criteria provided in Section 1, Discrimination Prohibition, and Section 2, Sexual Harassment. It is in this spirit that the parties agree to the provisions of this Article. This statement shall not be grievable nor shall either party use this Section as evidence or argument in arbitration.

  • Service Descriptions Available services for Transitional and Enhanced Supervision Services a. One (1) one-to-one meeting with the Contractor per week for case management services.

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • GENERAL SERVICE DESCRIPTION Service Provider currently provides active medical, pharmacy(Rx) and dental administration for coverages provided through Empire and Anthem (medical), Medco(Rx), MetLife(dental) and SHPS (FSA) (Empire, Anthem, Medco, MetLife and SHPS collectively, the “Vendors”) for its U.S. Active, Salaried, Eligible Employees (“Covered Employees”). Service Provider shall keep the current contracts with the Vendors and the ITT CORPORATION SALARIED MEDICAL AND DENTAL PLAN (PLAN NUMBER 502 EIN 00-0000000) and the ITT Salaried Medical Plan and Salaried Dental Plan General Plan Terms (collectively, the “Plans”) and all coverage thereunder in full force through December 31, 2011 for Service Recipient’s Covered Employees. All claims of Service Recipient’s Covered Employees made under the Plans and incurred on or prior to December 31, 2011 the (“2011 Plan Year”) will be adjudicated in accordance with the current contract and Service Provider will continue to take such actions on behalf of Service Recipient’s Covered Employees as if such employees are employees of Service Provider. All medical, dental, pharmacy and FSA claims of Service Recipient’s Covered Employees made under the Plans (the “Claims”) will be paid by the Vendors on behalf of the Service Provider. Service Recipient will pay Service Provider for coverage based on 2011 budget premium rates previously set for the calendar year 2011 and described in the “Pricing” section below. Service Recipient will pay Service Provider monthly premium payments for this service, for any full or partial months, based on actual enrollment for the months covered post-spin using enrollments as of the first (1st) calendar day of the month, commencing on the day after the Distribution Date. Service Recipient will prepare and deliver to Service Provider a monthly self xxxx containing cost breakdown by business unit and plan tier as set forth on Attachment A, within five (5) Business Days after the beginning of each calendar month. The Service Recipient will be required to pay the Service Provider the monthly premium payments within ten (10) Business Days after the beginning of each calendar month. A detailed listing of Service Recipient’s employees covered, including the Plans and enrollment tier in which they are enrolled, will be made available to Service Provider upon its reasonable request. Service Provider will retain responsibility for executing funding of Claim payments and eligibility management with Vendors through December 31, 2013. Service Provider will conduct a Headcount True-Up (as defined below) of the monthly premiums and establish an Incurred But Not Reported (“IBNR”) claims reserve for Claims incurred prior to December 31, 2011 date, but paid after that date, and conduct a reconciliation of such reserve. See “Headcount True-Up” and “IBNR Reconciliation” sections under Additional Pricing for details.

  • Service Description The Parties will provide Common Channel Signaling (CCS) to one another via Signaling System 7 (SS7) network Interconnection, in accordance with prevailing industry standards. Use of a third party provider of SS7 trunks is permitted.

  • Project Summary The main objective of the LIFE GAIA Sense project is to demonstrate Gaiasense, an innovative “Smart Farming” (SF) solution that aims at reducing the consumption of natural resources, as a way to protect the environment and support Circular Economy (CE) models. More specifically, this project will launch 18 demonstrators across Greece, Spain and Portugal covering 9 crops (olives, peaches, cotton, pistachio, potatoes, table tomatoes, industrial tomatoes, grapes, kiwi) in various terrain and microclimatic conditions. They will demonstrate an innovative method, based on high-end technology, which is suitable for being replicated and will be accessible and affordable to Farmers either as individuals or collectively through Agricultural Cooperatives. Moreover, LIFE GAIA Sense aims to promote resource efficiency practices in SMEs of the agricultural sector and eventually, contribute to the implementation of the Roadmap to a Resource Efficient Europe. This project will demonstrate a method on how the farmer will be able to decide either to use or avoid inputs (irrigation, fertilizers, pesticides etc.) in a most efficient way, without risking the annual production. The focus is on the resource consumption reduction side of CE, and the results will be both qualitatively and quantitatively, considering the resources’ efficiency in agricultural sector.

Time is Money Join Law Insider Premium to draft better contracts faster.