Study Report. The Feasibility Study report shall provide the following information: (a) a preliminary identification of any circuit breaker short circuit capability limits that may be exceeded as a result of the interconnection; (b) a preliminary identification of any thermal overload or voltage limit violations that may result from the interconnection; and (c) a preliminary description and non-binding estimate of the cost of facilities required to interconnect the Generating Facility to the IPA Switchyard and to address any identified short circuit and power flow issues.

Appears in 3 contracts

Sources: Generator Interconnection Procedures, Generator Interconnection Procedures, Generator Interconnection Procedures

Study Report. The Feasibility Study report shall provide the following information: : (a) a preliminary identification of any circuit breaker short circuit capability limits that may be exceeded as a result of the interconnection; (b) a preliminary identification of any thermal overload or voltage limit violations that may result from the interconnection; and (c) a preliminary description and non-binding estimate of the cost of facilities required to interconnect the Generating Facility to the IPA Switchyard and to address any identified short circuit and power flow issues.

Appears in 2 contracts

Sources: Generator Interconnection Agreement (Gia), Generator Interconnection Agreement (Gia)