Special Hazard Systems Sample Clauses

Special Hazard Systems. 2.3.3.3 Pre-Engineered Kitchen Fire Extinguishing Systems
AutoNDA by SimpleDocs

Related to Special Hazard Systems

  • Nuclear Hazard This Exclusion 7. pertains to Nuclear Hazard to the extent set forth in M. Nuclear Hazard Clause under Section I – Conditions.

  • Fire Hazards Explosives and inflammable materials which conflict with the Insurance Underwriting or Fire Department must be excluded. The City Fire Department prohibits the use of paper, crepe paper, or corrugated papers, and cardboard that has not been flame proofed for decoration of exhibit booths. All cloth drapes or table covers must be treated for fire resistance. All boats and motorized vehicles must have fuel tanks sealed and batteries disconnected. The Fire Marshal may require fuel tanks to be drained and purged. All exhibits must be in compliance with ordinances and laws of the City and the State in which the Show is held.

  • Environmental Hazards (a) Except for matters described in Section 18(b), Borrower shall not cause or permit any of the following:

  • Hazard Something that is potentially dangerous or harmful, often the root cause of an unwanted outcome.

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Compaction of surfaces 5 Compaction of ground surface under floors etc including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density. m2 96

  • Rectification of Safety Hazard 60.12 Where, because of the existence of a safety hazard, a site has been stopped for a defined period of time and Employees sent off site by agreement between Site Managers and any combination of Union Official/s, Health and Safety Committee, those people who remain on site to do rectification work will be paid at the rate of double time for all such work.

  • MAINTENANCE OF THE SAID BUILDING / APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the association of the allottees. The cost of such maintenance has been included in the Total Price of the [Apartment/Plot]. [Insert any other clauses in relation to maintenance of project, infrastructure and equipment]

  • Hazard Pay From the effective date of this Agreement, all Bargaining Unit members who are required to work under dangerous conditions shall receive hazard pay of 7.5 percent in four (4) hour increments so worked. Dangerous conditions shall be defined as working at heights more than twenty- five (25) feet above ground on towers, bridgework or antenna and handling explosives so designated by the Employer, transportation by and working under a helicopter, working from low-altitude, light fixed-wing aircraft (except pilots) and underwater diving.

  • Leave for Storms or Hazardous Conditions (a) Time lost by an employee as a result of absence or lateness due to storm conditions or because of the condition of public streets and highways or because an employee finds it necessary to seek permission to leave prior to the end of the regular shift must be:

Time is Money Join Law Insider Premium to draft better contracts faster.