Common use of Shell Clause in Contracts

Shell. All work required to obtain a shell permit final inspection (not a temporary certificate for occupancy). All work shall conform to local Code for the shell. Weather tight (air and water infiltration) shell complete with rain water distribution system. Exterior doors with manual exit panic hardware. 2 sets of standard pre- engineered stairs for access and egress with one set to access the roof. Fire riser and complete shell system, including "up heads" with capped tees for Tenant Improvements at all floors and roof monitors and PIV (monitoring system by Tenant). Floor of the Building designed for 80 PSF uniform live load. Steel framework shall be designed to accommodate shaft and elevator openings. Includes roof screen. Insulation at underside of roof deck provided, furring and drywall at perimeter walls and all columns are excluded. 10’ high ceiling for most open office space. The Building is classified as Type II-A. Exterior lobby door hardware to be electrified.

Appears in 1 contract

Samples: Office Lease (Roku, Inc)

AutoNDA by SimpleDocs

Shell. All work required to obtain a shell permit final inspection (not a temporary certificate for occupancy). All work shall conform to local Code for the shell. Weather tight (air and water infiltration) shell complete with rain water distribution system. Exterior doors with manual exit panic hardware. 2 sets of standard pre- engineered stairs for access and egress with one set to access the roof. Fire riser and complete shell system, including "up heads" with capped tees for Tenant Improvements at all floors and roof monitors and PIV (monitoring system by Tenant). Floor of the Building Buildings designed for 80 PSF uniform live load. Steel framework shall be designed to accommodate shaft and elevator openings. Includes roof screen. Insulation at underside of roof deck provided, furring and drywall at perimeter walls and all columns are excluded. 10’ high ceiling for most open office space. The Building is Buildings are classified as Type II-A. Exterior lobby door hardware to be electrified.

Appears in 1 contract

Samples: Office Lease (Roku, Inc)

Shell. All work required to obtain a shell permit final inspection (not a temporary certificate for occupancy). All work shall conform to local Code for the shell. Weather tight (air and water infiltration) shell complete with rain water distribution system. Exterior doors with manual exit panic hardware. 2 sets of standard pre- engineered stairs for access and egress with one set to access the roof. Fire riser and complete shell system, including "up heads" with capped tees for Tenant Improvements at all floors and roof monitors and PIV (monitoring system by Tenant). Floor of the Building designed for 80 PSF uniform live load. Steel framework shall be designed to accommodate shaft and elevator openings. Includes roof screen. Insulation at underside of roof deck provided, furring and drywall at perimeter walls and all columns are excluded. 10' high ceiling for most open office space. The Building is classified as Type II-A. Exterior lobby door hardware to be electrified.2A.

Appears in 1 contract

Samples: Office Lease (8x8 Inc /De/)

AutoNDA by SimpleDocs

Shell. All work required to obtain a shell permit final inspection (not a temporary certificate for occupancy). All work shall conform to local Code for the shell. Weather tight (air and water infiltration) shell complete with rain water distribution system. Exterior doors with manual exit panic hardware. 2 sets of standard pre- engineered stairs for access and egress with one set to access the roof. Fire riser and complete shell system, including "up heads" with capped tees for Tenant Improvements at all floors and roof monitors and PIV (monitoring system by Tenant). Floor of the Building designed for 80 PSF uniform live load. Steel framework shall be designed to accommodate shaft and elevator openings. Includes roof screen. Insulation at underside of roof deck provided, furring and drywall at perimeter walls and all columns are excluded. 10’ high ceiling for most open office space. The Building is classified as Type II-A. Exterior lobby door hardware to be electrified.

Appears in 1 contract

Samples: Office Lease (Roku, Inc)

Time is Money Join Law Insider Premium to draft better contracts faster.