Settings panel Sample Clauses

Settings panel. Settings panel provides  toggle buttons to hide or show layers, resources, legend and timeline (C2.25)  unchangeable input field of the username (C2.26)  input fields for first name, last name and email address (C2.27)  input fields to change password (C2.28)  “Save” and “Cancel” button to confirm and discard changes, respectively (C2.29) C2.25 C2.26 C2.27 C2.28 C2.29 Figure 12: CIPRTrainer settings panel.
AutoNDA by SimpleDocs

Related to Settings panel

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Performance Measures and Metrics This section outlines the performance measures and metrics upon which service under this SLA will be assessed. Shared Service Centers and Customers will negotiate the performance metric, frequency, customer and provider service responsibilities associated with each performance measure. Measurements of the Port of Seattle activities are critical to improving services and are the basis for cost recovery for services provided. The Port of Seattle and The Northwest Seaport Alliance have identified activities critical to meeting The NWSA’s business requirements and have agreed upon how these activities will be assessed.

  • Peer Review Dental Group, after consultation with the Joint ----------- Operations Committee, shall implement, regularly review, modify as necessary or appropriate and obtain the commitment of Providers to actively participate in peer review procedures for Providers. Dental Group shall assist Manager in the production of periodic reports describing the results of such procedures. Dental Group shall provide Manager with prompt notice of any information that raises a reasonable risk to the health and safety of Group Patients or Beneficiaries. In any event, after consultation with the Joint Operations Committee, Dental Group shall take such action as may be reasonably warranted under the facts and circumstances.

  • Function of Committee The Committee shall concern itself with the following general matters:

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopts or introduces for the Employer, management and municipal staff of the Employer.

  • INDEPENDENT ASSESSMENT COMMITTEE CHAIRPERSONS Xx. Xxxxxx Xxxxxxxxx Registered Nurses Association of Ontario 000 Xxxxxxxxxx Xxxxxx, Xxxxx 0000 Xxxxxxx, XX X0X 0X0 Telephone: (000) 000-0000, ext. 216 Fax: (000) 000-0000 E-mail: xxxxxxxxxxxxxx@xxxxxxxxx.xx Ms. Xxxxxxx Plain 0000 Xxxxxx Xxxx Xxxxxxxx, XX X0X 0X0 Telephone: (000) 000-0000 Email: xxxxxxx.xxxxx@xxxxxxxxx.xx LETTER OF UNDERSTANDING BETWEEN: XXXXXXX XXXX RETIREMENT COMMUNITY (NURSING HOME) (Hereinafter referred to as the "Employer") AND: ONTARIO NURSES' ASSOCIATION (Hereinafter referred to as the "Union")

  • Technical Objections to Grievances It is the intent of both Parties of this Agreement that no grievance shall be defeated merely because of a technical error, other than time limitations in processing the grievance through the grievance procedure. To this end, an arbitration board shall have the power to allow all necessary amendments to the grievance and the power to waive formal procedural irregularities in the processing of a grievance, in order to determine the real matter in dispute and to render a decision according to equitable principles and the justice of the case.

  • Technical Objections to Grievance No grievance will be defeated or denied by any minor technical objection.

  • Joint Job Evaluation Committee The parties entered into agreement December 17, 1992, to ensure the Joint Gender- Neutral Job Evaluation Plan remains current and operational and to that end endorsed the Joint Gender-Neutral Job Evaluation Maintenance Agreement. The parties agree that a guiding principle for the Committee is that there shall be no discrimination between male and female employees wherein a person of one sex is paid more than a person of the other sex for similar or substantially similar work.

Time is Money Join Law Insider Premium to draft better contracts faster.