Schematic Clause Samples
Schematic. The Engineer shall identify, analyze, and minimize potential adverse operational impacts, crash impacts, ROW impacts, environmental impacts, major utility conflicts, structural impediments, or exceptions to the Owner, State and FHWA design criteria. Schematics will be developed to the 50%, 90%, and 100% level of completion.
Schematic. 1. Engineer will utilize 30% Schematic provided by TxDOT to begin design on the project.
a. Engineer will obtain all design files and format for utilization in design
2. Utilities
Schematic. For the selected design alternative, schematic design will be prepared. Architectural building preliminary plan and elevation will be prepared. The site plan will locate facility outlines, confirm working grade, and provide preliminary storm water run-off plans. Confirmation of traffic patterns and material flow on site will be included. Mechanical design will advance such that power demands are calculated. electrical overall one-line and power plan, and the routing of underground utilities will be established. Discipline design criteria will be completed as well as the scale specification. We have assumed that the existing topographic mapping of the site will be sufficient for design and that no geotechnical investigations are required. The results of the pre-design and schematic design will be incorporated into a Master Improvement Plan. This will document the pre-design activities conducted and the rationale for the selected case. Elements of the schematic design will be reviewed for grouping into phased development packages, which may be executed independently. For these packages, cost estimates appropriate to the design will be prepared. Based upon construction sequencing requirements and County prioritization, a phased construction plan will be prepared. The Master Improvement Plan will be submitted in draft form and upon receipt of review and comment, submitted in final form. Although the Master Plan will be organized such that work may be released in a phased manner, it is assumed that the entire project will be released upon issuance of the Master Plan. Issuance of the final Master Improvement Plan will complete the schematic design phase.
Schematic
