Schematic Design Approval Sample Clauses

Schematic Design Approval. The Design Professional shall, on the Preliminary Design and Construction Schedule, show the progress to date, confirm the remainder of the design portion of the schedule, and update the projected construction portion of the schedule, The Design Professional shall meet with the Owner and Using Agency for the purpose of presenting and reviewing the Schematic Design including the updated schedule and the initial Statement of Probable Construction Cost. The Design Professional shall obtain the written approval of the Owner of the Schematic Design Phase before proceeding with the next phase.
AutoNDA by SimpleDocs
Schematic Design Approval. The Design Builder shall, on the Preliminary Design and Construction Schedule, show the progress to date, confirm the remainder of the design portion of the schedule, and update the projected construction portion of the schedule, The Design Builder shall meet with the Owner, Program Manager, Using Agency and Design-Builder for the purpose of presenting and reviewing the Schematic Design including the updated schedule and the initial Statement of Probable Construction Cost. The Design Builder shall obtain the written approval of the Owner for the Schematic Design before proceeding with the next phase.
Schematic Design Approval. As part of the Service A 10% Schematic Review Submittal, the Designer shall furnish the Owner an estimate of project cost based upon the Service A 10% Review Submittal. The approval of project cost estimate and the Service A 10% Review Submittal by the Owner and all public agencies involved will constitute authority for the Designer to proceed with the performance and completion of Service B.
Schematic Design Approval. The Project Management Contractor shall use its best efforts to cause the design consultant to revise the schematic design so that it reflects the comments received from the Client Agency, the Department and to reflect any approved value engineering ideas. The Project Management Contractor shall review the revised schematic design and advise the Department whether the requested changes and value engineering changes have been incorporated. The Project Management Contractor shall not have the authority to approve the schematic design. The decision to approve or reject the revised schematic design shall be made by the DGS Project Manager. The approved schematic design is referred to herein as the “Final Schematic Design”. The Project Management Contractor shall update the Control Budget to reflect the likely cost of the Final Schematic Design.
Schematic Design Approval. The Design Professional shall meet with the Owner and Using Agency for the purpose of presenting and reviewing the Schematic Design Documents and the Statement of Probable Construction Cost. To the extent the Statement of Probable Construction Cost submitted with the Schematic Design Documents significantly deviates from the GMP Cost Limitation, the Design Professional shall discuss the deviations with the Owner and prepare and submit a plan to address the differences. The Design Professional shall, on the Preliminary Design and Construction Schedule, show the progress to date, confirm the remainder of the design portion of the schedule, and update the projected construction portion of the schedule. The Design Professional shall obtain the written approval of the Owner of the Schematic Design Documents before proceeding with the next phase. Design Development Phase.

Related to Schematic Design Approval

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.