Schematic Design Work Outline Sample Clauses

Schematic Design Work Outline. Develop Base Maps The base maps to be used for the analysis and proposed schematic layout shall be developed by the Engineer from existing construction and right of way (ROW) plans as available. The Engineer shall re-establish the existing centerline horizontal alignments for all roadways, identify existing ROW, property owners and the approximate location of major utilities based on a XXX in the preparation of base maps.
AutoNDA by SimpleDocs
Schematic Design Work Outline. A. Develop Base Maps The base maps to be used for the analysis and proposed schematic layout shall be developed by the Engineer from existing construction and right of way (ROW) plans as available. The Engineer shall re- establish the existing centerline horizontal alignments for all roadways, identify existing ROW, property DocuSign Envelope ID: D0E29F2F-2A8C-4E32-A9B8-8EFA82530B8F WAs Used PeopleSoft Contract No. 7032 Legacy Contract No. 19-6SDP5001 owners and the approximate location of major utilities based on a XXX in the preparation of base maps. The existing centerline horizontal alignments for all roadways will be reviewed and approved by the State prior to being utilized for further engineering or surveying purposes.
Schematic Design Work Outline 

Related to Schematic Design Work Outline

  • Schematic Design Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Schematic Design Phase Services § 3.2.1 The Architect shall review the program and other information furnished by the Owner, and shall review laws, codes, and regulations applicable to the Architect’s services.

  • Schematic Design See Section 2, Part 1, Article 2.1.4, Paragraph 2.1.4.2.

  • Schematic Design Documents In accordance with the approved Preliminary Design and Construction Schedule and based upon approval of and comments made by the Owner regarding the Concept Design Studies, the Design Professional shall prepare and submit to the Owner Schematic Design Documents, including drawings and outline specifications. These documents shall represent a further development of the approved design concept, providing additional detail and specificity regarding the intended design solution. Typically, all such documents shall be drawn to scale, indicating materials and assemblies, as appropriate, to convey the design intent and to illustrate the Project’s basic elements, scale and relationship to the Site. All major pieces of furniture and equipment to be fixed or supplied by the CM/GC shall be illustrated to scale. (See ASTM Standard Practice E 1804-02, August 2007, Sections 6.3, 8.2 and 8.3 for guidance on information which is generally developed in Schematic Design.)

  • Design Professional to Design Work The Design Professional Contract requires the Design Professional to design and to prepare the Contract Documents, a copy of which shall be furnished to the Contractor upon request. The Design Professional Contract requires the Design Professional to designate a readily accessible representative (either on Site or by computer, phone or fax or otherwise) who shall have authority promptly to render decisions and to furnish information required of the Design Professional.

  • HOURS OF WORK AND WORK SCHEDULES 22.01 Except for employees subject to a particular work schedule according to clause 22.10, the duration of the regular work week is established at thirty-five (35) hours generally worked between 9:00 and 17:00 from Monday to Friday.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • Design Development Phase INDICATE IN STATEMENT OF WORK “NOT APPLICABLE” IF SECTION IS NOT APPLICABLE

  • Preliminary Design Phase During the Preliminary Design Phase, the CONSULTANT shall, if requested by the CITY and accepted by the CONSULTANT as part of a Services Authorization:

Time is Money Join Law Insider Premium to draft better contracts faster.