Common use of SCHEDULING OF THE WORK Clause in Contracts

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty (40) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. The expansion joint and seal must be installed and operational and the site cleaned up by no later than October 29th, 2021. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, excavation, concrete removals, expansion joint removals, fabrication and installation of new expansion joint extrusions, reinforcement supply and installation, placing concrete for end dams, asphalt reinstatement, etc.) The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phases. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: And Agreement

AutoNDA by SimpleDocs

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty thirty-five (4035) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. Note that construction must start on site on 4 May 2020. The expansion joint detour (road closure) shall not be in- place until this date. The bridge/roadway (entire width) complete with asphalt seal, barriers, and seal guardrails must be installed and operational and the site cleaned up by opened to traffic no later than October 29th19 June 2020, 2021with no interruption to traffic after this date. The overall project must be completed no later than 19 June 2020. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, demolition, pile driving, concrete removalswork, expansion joint removalsrock placement, fabrication and installation of new expansion joint extrusionsstringers, reinforcement supply and installationdeck, placing concrete for end damsbarriers, asphalt reinstatementearthwork backfill, road work, topsoil, seeding, guardrails, etc.) related to each substructure location (eg: abutments, piers), superstructure location (eg: span 1, span 2, etc), and approach location. The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phases. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: Agreement

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty FORTY (40) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. The expansion joint and seal structure must be installed and operational completed and the site cleaned up by highway opened to traffic no later than October 29th8 November, 20212019. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, pile driving, concrete removalsfoundations, expansion joint removalsriprap placement, fabrication and installation of new expansion joint extrusions, reinforcement precast girder supply and installation, placing concrete for end damsdeck, asphalt reinstatementbarriers, earthwork backfill, collision blocks, approach slabs, waterproofing, removal of temporary works, etc.) . The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phases. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: Agreement

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty thirty (4030) working days. ; No claims claim s for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. The expansion joint and seal Note that construction must be installed and operational and the start on site cleaned up by no later than October 29th30 April 2018. The detour (road closure) shall not be in-place until this date. The bridge/roadway (entire width) complete with asphalt seal, 2021barriers, and guardrails must be opened to traffic no later than 8 June 2018, with no interruption to traffic after this date. The overall project must be completed no later than 8 June 2018. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, demolition, pile driving, concrete removalswork, expansion joint removalsrock placement, fabrication and installation of new expansion joint extrusionsstringers, reinforcement supply and installationdeck, placing concrete for end damsbarriers, earthwork backfill, road work, asphalt reinstatementpaving, guardrails, etc.) related to each substructure location (eg: abutments, piers), superstructure location (eg: span 1, span 2, etc), and approach location. The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phasesactivities. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: Agreement

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty (40) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. Note that construction must start on site on 6 July 2020. The expansion joint detour (road closure) shall not be in- place until this date. The bridge/roadway (entire width) complete with asphalt seal, barriers, and seal guardrails must be installed and operational and the site cleaned up by opened to traffic no later than October 29th28 August 2020, 2021with no interruption to traffic after this date. The overall project must be completed no later than 28 August 2020. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, demolition, pile driving, concrete removalswork, expansion joint removalsrock placement, fabrication and installation of new expansion joint extrusionsstringers, reinforcement supply and installationdeck, placing concrete for end damsbarriers, asphalt reinstatementearthwork backfill, road work, topsoil, seeding, guardrails, etc.) related to each substructure location (eg: abutments, piers), superstructure location (eg: span 1, span 2, etc), and approach location. The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phases. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: Agreement

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty two hundred and fifty (40250) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. The expansion joint and seal project must be installed and operational and the site cleaned up by completed no later than October 29thAugust 24, 2021. 2019 All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the DepartmentTIE. Note that the DepartmentTIE’s evaluation of submitted bids shall include reviewing the Preliminary Prelim inary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department TIE for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg excavation, demolition, pile driving, concrete removalsfoundations, expansion joint removalsrock placement, fabrication and installation of new expansion joint extrusions, reinforcement steel box girder supply and installation, placing concrete for end damsdeck, asphalt reinstatementbarriers, earthwork backfill, collision blocks, approach slabs, waterproofing, removal of temporary works, etc.) ). The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phases. Throughout the project the Contractor shall notify the Department TIE of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s TIE request at any time throughout the project, update and submit to the Department TIE an updated Construction Schedule as the Department TIE deems required to reflect any circumstances that may cause the need for an updated Schedule. It is the expectation that the Earthworks General Contractor will conduct all necessary works in order to allow the bridge contractor access to this site. The general sequencing of the works is as follows: - Construct access roads and earthen working platforms for centre pier (Earthworks contractor) - Excavate for pier base construction (Earthworks contractor) - Drive piles and construct cast-in-place concrete pier base (Bridge contractor) - Construct pier shaft and hammerhead pier cap (Bridge contractor) - re-align river bed (Earthworks contractor) - Construct approach roads on the east end of the bridge (Earthworks contractor) - Drive piles for east abutment and construct concrete abutment pile cap (Bridge contractor) - Construct western approach roads to bridge structure (Earthworks contractor) - Drive piles for west abutment and construct concrete abutment pile cap (Bridge contractor) - Backfill abutments with Class ‘A’ material (Bridge contractor) - Complete construction of bridge superstructure (Bridge contractor) - Complete select borrow and granular base on the approaches (Earthworks contractor) - W aterproof the bridge deck and place asphalt wearing surface (Earthworks contractor) The above sequencing is not intended to be a succession of events as there are some items which could be worked on concurrently. The Bridge and Earthwork contractors are free to revise or modify the sequencing as they see fit in order to best achieve the desired results and to meet the budget and schedule. Bidders are advised that the financial scheduling shall be $4.0 Million in Fiscal Year 2018/19. The remainder shall be processed during Fiscal Year 2019/20; which begins on April 1, 2019. It is anticipated that the site will be inactive during the winter months of 2018/2019.

Appears in 1 contract

Samples: www.princeedwardisland.ca

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty fifteen (4015) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. Note that construction is not permitted to start on site before 4 November 2019. The expansion joint and seal bridge/roadway (entire width) complete with asphalt seal, must be installed and operational and the site cleaned up by opened to traffic no later than October 29th22 November 2019, 2021with no interruption to traffic after this date. The overall project must be completed no later than 22 November 2019. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, concrete removalsdemolition, expansion joint removalsrock placement, fabrication and installation of new expansion joint extrusions, reinforcement supply and structure installation, placing concrete for end damsearthwork backfill, road work, asphalt reinstatementpaving, guardrails, etc.) ). The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phasesactivities. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: Agreement

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty (40) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. The expansion joint and seal arch structure must be completed, installed and operational and the site cleaned up backfilled, ready for traffic by no later than October 29thJune 14th, 20212019. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, pile driving, concrete removalsfoundations, expansion joint removalsriprap placement, fabrication and installation of new expansion joint extrusions, reinforcement precast girder supply and installation, placing concrete for end damsdeck, asphalt reinstatementbarriers, earthwork backfill, collision blocks, approach slabs, waterproofing, removal of temporary works, etc.) . The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phases. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule. It is the expectation that the Earthworks General Contractor will conduct all necessary works in order to allow the bridge contractor access to this site. The general sequencing works is as follows: • Construct roadway embankment east and west approaches (Earthworks contractor) • Excavate fill material to allow for pile driving at east and west abutments (Bridge contractor) • Construct concrete abutments and set girders (Bridge contractor) • Backfill abutments with Class “A” material (Bridge contractor) • Complete construction of bridge superstructure (Bridge contractor) • Complete select borrow and approach slabs (Bridge contractor) • Complete granular subbase and base on the approaches (Paving contractor) • Waterproof the bridge deck and place asphalt wearing surface (Paving contractor) The above sequencing is not intended to be a succession of events as there are some items which could be worked on concurrently. The Bridge, Earthwork and Paving contractors are free to revise or modify the sequencing as they see fit in order to best achieve the desired results and to meet the budget and schedule.

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty twenty-five (4025) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. Note that construction is not permitted to start on site before 14 May 2018. The expansion joint bridge/roadway (entire width) complete with asphalt seal, and seal guardrails must be installed and operational and the site cleaned up by opened to traffic no later than October 29th15 June 2018, 2021with no interruption to traffic after this date. The overall project must be completed no later than 15 June 2018. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, concrete removalsdemolition, expansion joint removalsrock placement, fabrication and installation of new expansion joint extrusions, reinforcement supply and pipe structure installation, placing concrete for end damsearthwork backfill, road work, asphalt reinstatementpaving, guardrails, etc.) ). The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phasesactivities. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems deem s required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: Agreement

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty fifteen (4015) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. The expansion joint and seal Note that construction must be installed and operational and the start on site cleaned up by no later than October 29th24 August 2020. The bridge/roadway (entire width) complete with asphalt seal, 2021barriers, and guardrails must be opened to traffic no later than 11 September 2020, with no interruption to traffic after this date. The overall project must be completed no later than 11 September 2020. Removals: the temporary bridge (excluding bridge footings to rem ain on site), realigned roadway (asphalt, base, and sub-base) on the Brookfield approach, asphalt milling 60m each side of temporary bridge, excavation of permanent foreslopes at bridge area, guardrail removal, winter stabilization with hay mulch, and installation of permanent cross-over guardrail at the top of each foreslope shall take place over a maximum of ten (10) consecutive working days throughout November 2020. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, concrete removalswork, expansion joint removalstemporary bridge, fabrication and installation of new expansion joint extrusionsearthwork backfill, reinforcement supply and installationroad work, placing concrete for end damstopsoil, asphalt reinstatementseeding, etc.) guardrails. The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phasesactivities. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: Agreement

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty thirty-five (4035) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. Note that construction must start on site on 26 October 2020. The expansion joint detour (road closure) shall not be in-place until this date. The bridge/roadway (entire width) complete with asphalt seal and seal guardrails must be installed and operational and the site cleaned up by opened to traffic no later than October 29th11 December 2020, 2021with no interruption to traffic after this date. The overall project must be completed no later than 11 December 2020. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, demolition, concrete removalswork, expansion joint removalsrock placement, fabrication and installation of new expansion joint extrusionsearthwork backfill, reinforcement supply and installationroad work, placing concrete for end damstopsoil, asphalt reinstatementseeding, guardrails, etc.) ). The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phases. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: Agreement

SCHEDULING OF THE WORK. The number of working days stipulated for this Contract is forty fifteen (4015) working days. No claims for delays caused by whatever external agencies or factors shall be allowed. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. Note that construction must start on site on 9 November 2020. The expansion joint and seal detour (road closure) shall not be in-place until this date. The bridge/roadway (entire width) complete with guardrails must be installed and operational and the site cleaned up by opened to traffic no later than October 29th27 November 2020, 2021with no interruption to traffic after this date. The overall project must be completed no later than 27 November 2020. All bidders shall supply a Preliminary Construction Schedule with his Tender Documents for review by the Department. Note that the Department’s evaluation of submitted bids shall include reviewing the Preliminary Schedule including but not limited to the benefit(s) of earlier completion, bridge/roadway open to traffic (entire width), and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, eg: excavation, concrete removalsdemolition, expansion joint removalsrock placement, fabrication and installation of new expansion joint extrusionsearthwork backfill, reinforcement supply and installationroad work, placing concrete for end dams, asphalt reinstatementguardrails, etc.) ). The Final Schedule shall indicate applicable time lines and milestones for all work activities and Phases. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule as the Department deems required to reflect any circumstances that may cause the need for an updated Schedule.

Appears in 1 contract

Samples: Agreement

SCHEDULING OF THE WORK. The There shall be no limitations on the number of working days stipulated for this Contract contract, however work is forty (40) working daysexpected to continue in a consecutive fashion once it begins. No claims for delays caused by whatever external agencies or factors Nevertheless, work shall be allowedcompleted by September 15, 2023. Failure to do so will result in the Contractor paying liquidated damages at the assessed rate. The Contractor shall work Saturdays (if he deems necessary to meet deadline) and/or maximize the hours per day on site. The expansion joint and seal must be installed and operational and the site cleaned up by no later than October 29th, 2021. All bidders shall supply submit a Preliminary Construction Schedule preliminary schedule with his Tender Documents their tender documents for review by the Department. Note that The Contractor’s proposed construction phasing shall highlight their planned work in the Department’s evaluation following areas: • Construction of submitted bids shall include reviewing Trail A from Station 0+000 to 0+140 • Construction of Trail A from Station 0+220 to 0+399, including provisions to maintain traffic on the Preliminary Schedule including but not limited to Confederation trail during the benefit(s) concrete box installation. • Construction of earlier completion, bridge/roadway open to traffic (entire width), Detour Road • Installation of Pedestrian Underpass and overall project completion date. Note that the tender deadline dates indicated for any Phase(s), bridge/roadway open to traffic (entire width), and/or overall project completion are the latest acceptable dates, with earlier dates acceptable. SCHEDULE ‘A’ SCHEDULE OF SPECIAL PROVISIONS Revision 0 , July 2021 XXXXXX RIVER (RED) BRIDGE – REHABILITATION PROJECT associated items • Work on widening and resurfacing Route 2 • Work on paved trails Prior to Contract award, the selected Bidder shall submit a detailed Final Construction Schedule to the Department for review. The Final Construction Schedule shall identify all primary work activities (EG. asphalt removal, : excavation, concrete removalsdemolition, expansion joint removalsrock placement, fabrication and installation of new expansion joint extrusions, reinforcement supply and structure installation, placing concrete for end damsearthwork, asphalt reinstatementbackfill, road work, guardrails, etc.) ). The Final Schedule shall indicate applicable time lines timelines and milestones for all work activities and Phases. Throughout the project the Contractor shall notify the Department of any situations that may negatively affect the project’s Final Construction Schedule. The Contractor shall, upon the Department’s request at any time throughout the project, update and submit to the Department an updated Construction Schedule Schedule. Utility crews (Aliant, Maritime Electric, etc.) may be carrying out work on site at various stages of the project. The Department will have separate Contractor’s onsite throughout the project for the installation of electrical components and signs. The Contractor shall coordinate their work schedules with all these crews and no additional compensation will be provided for any delays. Regular weekly job site meetings will be held to discuss job progress, environmental concerns, safety, traffic flow, etc. The Contractor shall make available for this meeting a representative with the authority to act for the Contractor as well as the Department deems required to reflect any circumstances that may cause the need for an updated ScheduleTraffic Control Manager.

Appears in 1 contract

Samples: And Agreement