Common use of Roads Clause in Contracts

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Road 13.55 miles 766 feet Maintenance New Construction When soil is dry, frozen or snow covered All road work will be completed prior to harvest or hauling within a unit. Road 28-1 1,688 feet 7,422 feet Maintenance New Construction Road 28-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% Hard Fescue N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location N/A

Appears in 2 contracts

Samples: dnrc.mt.gov, dnrc.mt.gov

AutoNDA by SimpleDocs

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Road 13.55 miles 766 feet Maintenance New Construction When soil is dry, frozen or snow covered All road work will be completed prior to harvest or hauling within a unit. Road 28-1 1,688 feet 7,422 feet Maintenance New Construction Road 28-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction B. ROAD X/X X/X X/X X/X X/X X. XXXX CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description N/A N/A N/A N/A N/A Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 N/A TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% Hard Fescue 8 Elymus glaucus, Blue Wildrye N/A 4 Pseudoroegneria spicate, Bluebunch Wheatgrass N/A 4 Elymus trachycaulus, Slender Wheatgrass N/A 4 Bromus marginatus, Mountain Brome N/A 6 Lolium multifolrum, Cover Crop of Annual Rye N/A 26 Pounds per acre of seed 20.8 Total pounds seed mix according to IX.C. GRASS SEEDING SPECIFICATIONS, concurrent with construction and temporary road obliteration TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A N/A Fill Material Yards Type Source Location Delivery Location N/A N/A N/A N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE PURCHASER FOR DELIVERY: The Purchaser is required to furnish the described material, to be delivered and unloaded by the Purchaser at the DNRC N/A Unit office. Materials shall be delivered before N/A. All materials furnished by the Purchaser become the property of the State when delivered. Amount Description and Specifications N/A N/A

Appears in 1 contract

Samples: Timber Sale Contract

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length (miles) Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Southern Pine Plantation (SPP) Road 13.55 miles 766 feet Maintenance New Construction When soil is dry, frozen or snow covered All road work will be completed prior 0.88 Level 1 maintenance After June 15 and when conditions allow for shaping and compaction Prior to harvest or hauling within a unit. on these roads Lazy Creek Ranch (LCR) Road 28-1 1,688 feet 7,422 feet Maintenance New Construction 0.79 North Lake (NL) Road 28-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction 0.46 B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description N/A 1 Geotextile fabric (16 feet x 28 feet) Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 N/A TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30137 Stillwater Blend 20% Annual Ryegrass 3015% Slender Wheatgrass 25% Mountain Brome 15% Canada Bluegrass (Ruebens) 25% Streambank Wheatgrass 15% Hard Fescue (Durar) 0 N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location 50 10 Pit Run ¾”-minus 000 Xxx XXX Xxxx TABLE B-2 (Continued): MATERIALS FURNISHED BY THE PURCHASER FOR DELIVERY: The Purchaser is required to furnish the described material, to be delivered and unloaded by the Purchaser at the DNRC Stillwater Unit office, 0000 Xxx 00, Xxxxx, XX 00000. Materials shall be delivered before 7/1/2025. All materials furnished by the Purchaser become the property of the State when delivered. Amount Description and Specifications N/A

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length (miles) Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Lower Whitefish Road 13.55 miles 766 feet 1.5 Any time soil is not too wet or dry to allow shaping and compaction as determined Xxxxx Lake Road 1 by the Forest Officer King Creek Road 0.9 Maintenance Lower Xxxxxxxx 1.2 Anchor Pit Road 0.8 After June 15th and when Prior to log hauling on these roads/trails conditions allow for Lower Whitefish Jump-up 0.5 shaping and compaction as determined by the Forest Reconstruction Officer Anchor Pit Spur 0.2 King Creek Spur 0.2 New Construction When soil is dry, frozen or snow covered All road work will be completed prior to harvest or hauling within a unit. Road 28-1 1,688 feet 7,422 feet Maintenance New Construction Road 28-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction Knife Ridge Excavated Trail 0.5 B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30160 Xxxxxxxxxx Xxxxx 00% Annual Ryegrass 3015% Slender Wheatgrass 25% Mountain Brome 15% Canada bluegrass (Ruebens) 25% Streambank Wheatgrass 15% Hard Fescue fescue (Durar) N/A N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A 1 24’ open-top well casing water diverter Fill Material Yards Type Source Location Delivery Location N/A20 ¾ inch gravel Anchor Pit Lower Whitefish and East Lakeshore Drive Intersection

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per according to the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length (miles) Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Soup Creek 3.8 Maintenance Road 13.55 miles 766 feet Renovation and Initial Cilly Creek Road 3.2 Maintenance Maintenance: Award of contract to November 30, 2016; Renovation and Initial Lower Cilly Road 1 Maintenance June 1, 2017 to October 31, 2017 Maintenance: October 31, 2017 9521 Road 1.9 Maintenance New Construction When soil is dry, frozen or snow covered All road work will be completed prior Road Construction: New Road Award of contract to harvest or hauling within a unit. Road 28-1 1,688 feet 7,422 feet Maintenance Construction: Xxxxxx Spur 0.62 Renovation New Construction Road 28-2 8,370 feet November 30, 2016; June 1, 2017 to September 30, 2017 September 30, 2017 Spur 1622 0.23 Renovation New Construction Road 20-1 2,668 feet Final Maintenance and Blading: Final Maintenance and Blading: August 15, 2019 Wetland Spur 1.48 New Construction Road 20June 1, 2017 to November 15, 2017; Spur 918 0.36 Renovation New Construction June 16, 2018 to November 15, 2018; June 16, 2019 to August 15, 2019 Spur 9-2 1,996 feet 15D 0.69 Renovation New Construction B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description 1 1 1 1 1 18” 18” 24” 30” 30” 26’ 32’ 40’ 34’ 40’ 16 16 16 16 16 80 feet Filter Fabric Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% 69 Tall Fescue “Durar” Hard Fescue N/A Slender Wheatgrass Red Top Annual Rye 69 34.5 2,000 00-00-00 34.5 241.50 TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location N/A80 1 ½”-minus gravel Goat Creek Pit Cilly Creek Rd.: MM1.43; Xxxxxx Spur: 7+25, 21+33, Wetland Spur: 6+79, 33+79 10 Rock Armor Goat Creek Pit Wetland Spur: 34+15 000 Xxx Xxx gravel Goat Creek Pit Xxxxxx Spur: 5+09, 20+81; Wetland Spur: 6+79, 33+97, 76+07 Spur 9-15D: 11+51, 13+86 20 Drain Rock Xxxxxxxx Pit Wetland Spur: 76+07

Appears in 1 contract

Samples: Graves Sample Contract

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Miles Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Xxxxx Xxxxxx Xxxx 0.0 Xxxx Xxxxxx Xxxx 0.5 May (excluding Memorial Day weekend) and/or North Xxxxx Lake Road 13.55 miles 766 feet 3.5 Heavy Maintenance New Construction When September 16 to March 15, any time soil is dry, frozen not too wet or snow covered All road work will be completed prior too dry to and BMP Site allow shaping and Spur 18B 0.6 Improvement compaction as determined by the Forest Prior to Log Hauling and following harvest Officer North Beaver Lake Road 3.6 South Xxxxx Lake Road 1.1 Spur H temp 0.4 New Temporary Road Construction and reclamation any time soil is not too wet or hauling within a unit. Road 28-1 1,688 feet 7,422 feet Maintenance New Construction Road 28-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction too dry to allow shaping and compaction as determined by the Forest Officer B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description 1 18” 36’ 16 1 40’ 18” CMP Band Slash Filter Fill Material Yards Amount Type Delivery Location 0 1045 cu yds 40 cu yds 10 cu yds ¾ inch crushed gravel Pit run gravel Talus Xxxxxx Xxxx xxxxx 0000 Xxxxx Xxxxx Xxxxxx Xxxx 28-1 and Road 28-2 Xx. Segment 2, MM 0.51 TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30101 20% Annual Ryegrass 3015% Slender Wheatgrass 25% Mountain Brome 15% Canada bluegrass (Ruebens) 25% Streambank Wheatgrass 15% Hard Fescue fescue (Durar) N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A 1 18” x 28’ Corrugated Metal Pipe (CMP) Fill Material Yards Amount Type Source Location Delivery Location 3 40’ Energy dissipaters Slash Filter Windrow local TABLE B-2 (Continued): MATERIALS FURNISHED BY THE PURCHASER FOR DELIVERY: The Purchaser is required to furnish the described material, to be delivered and unloaded by the Purchaser at the DNRC Unit name Unit office, address or location. Materials shall be delivered before date. All materials furnished by the Purchaser become the property of the State when delivered. Amount Description and Specifications N/A

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Feet Type of Construction Operation Period Completion Date or Requirement Buffalo Bill International Road 13.55 miles 766 feet 9,370 Advanced Maintenance New Construction When soil is dryGOSHAWK TIMING RESTRICTION: No harvest activities may occur inside the two ¼ mile circles (see Harvest map in Attachment A) from April 1 thru August 15. Operational periods will be agreed upon by the purchaser and the Forest Officer prior to the start of road work. International East International South 3,300 1,070 Advanced Maintenance Advanced Maintenance October 31, frozen or snow covered 2019 & Lower Tungsten 2,025 Reconstruction All road work will Upper Xxxxxxxx Xxxxx 00-0 Xxxx Xxxxx 00-0 Xxxx 1,995 2,315 2,240 Reconstruction New construction New construction be completed prior to harvest or hauling within a unit. Road 28Xxxxx 00-1 1,688 feet 7,422 feet Maintenance New Construction Road 280 Xxxx 0,000 Xxx xxxxxxxxxxxx Xxxxx 00-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction 0 Xxxx 1,320 Reconstruction B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% Hard Fescue N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Xxxxxx Xxxxxxxxxxx 0 Xxxxx XXXX – ADJUSTABLE IX. SPECIFICATIONS AND DRAWINGS Fill Material Yards Type Source Location Delivery Location N/AAs Needed Rock Armoring Found on Site CMP catch basins & outlets

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Miles/Feet Type of Construction Operation Period Completion Date or Requirement Buffalo Bill XxXxxxxx-XxXxxxxx 4.1 Miles Maintenance 36-6 Temp, 36-7 Temp, 36-8 Road, and 36-9 Temp operational period is August 16th to March 31st. All other road construction and maintenance activities may take place as site conditions allow. Operational periods will vary depending on the type of work to be done. Operational periods will be agreed upon by the purchaser and the Forest Officer prior to the start of road work. Elk Creek 6.9 Miles Xxxxxxxxxxx 00-0 Xxxx 10,595 Feet Xxxxxxxxxxx 00-0 Xxxx 3,475 Feet Maintenance 36-3 Road 13.55 miles 766 feet Maintenance 2,080 Feet 1,560 Feet Reconstruction New Construction When soil is dry, frozen or snow covered 00-0 Xxxx 00-0 Xxxx 000 Feet 1,530 Feet 510 Feet Reconstruction New Construction New Construction All road work will be completed prior to harvest or hauling within a unit. 36-7 Temp 975 Feet Temp Maintenance 36-8 Road 28590 Feet Reconstruction 36-1 1,688 feet 7,422 feet 9 Temp 1,005 Feet Temp Maintenance New Construction 36-11 Temp 1,220 Feet Temp Maintenance 36-12 Temp 425 Feet Temp Maintenance 36-13 Road 281,740 Feet Reconstruction 36-2 8,370 feet New Construction 14 Road 203,365 Feet Reconstruction 36-1 2,668 feet New Construction 15 Road 20-2 1,996 feet New Construction 300 Feet Decommission B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 18” 57 feet 16 1 18” CMP Band TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% Hard Fescue N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A 3 Well Casing Super Gates. Can be picked up at the Plains Unit Office. Fill Material Yards Type Source Location Delivery Location N/A4 yards Rock Armor On Site 36-6 Temp

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length (Miles) Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Main Haul Road 13.55 3.3 Maintenance, brushing, site improvements When site conditions allow unless a raptor nest is found to be active; if the nest is active, then no activity is allowed within 0.25 miles 766 feet Maintenance New Construction When soil is dry, frozen or snow covered All road work will be completed prior of the nest from April 1 through August 15 Prior to harvest or hauling within a unit. operations Haul Road 28-1 1,688 feet 7,422 feet Maintenance New Construction B 0.76 Maintenance, brushing, site improvements When site conditions allow Haul Road 28-2 8,370 feet New Construction C 0.33 Maintenance, brushing, site improvements Haul Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction D 1.5 Brushing, site improvements, new construction B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description N/A N/A Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 N/A TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 320 25% Streambank Slender Wheatgrass 15% Hard Fescue 25% Annual Ryegrass 15% Streambank Wheatgrass 20% Mountain Brome N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location N/A

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length (miles) Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Spur 18-29 (Restricted Road) 0.26 Road 13.55 miles 766 feet Maintenance New Construction Maintenance Period: Award date through March 30, 2025; June 16, 2025 through March 30, 2026; June 16, 2026 through March 30, 2027; June 16, 2027 through September 1, 2027. Hauling Operation Period: November 16, 2024, through March 30, 2025; November 16, 2025 through March 30, 2026; November 16, 2026 through March 30, 2027. As weather provides favorable conditions for the work to be completed. When soil is dry, frozen or snow covered All Hauling Restrictions in Section VII.N. of the timber sale contract apply Initial road work will maintenance: Must be completed prior to before timber harvest or hauling within a unitbegins. Final Road 28-1 1,688 feet 7,422 feet maintenance: September 1, 2027 State Xxxxxxx Road (Restricted Road) 0.9 Road Maintenance New Construction Soup Creek Road 28-2 8,370 feet New Construction 0.8 Road 20-1 2,668 feet New Construction Maintenance Xxxxxx Meadow Road 20-2 1,996 feet New Construction (Restricted Road) 0.7 Road Maintenance Big Bear Road (Restricted Road) 0.3 Road Maintenance B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% 26 Tall Fescue 13 “Durar” Hard Fescue N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location N/A13 Red Top

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length (Miles) Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Road 13.55 miles 766 feet East Side Xxxxxx River Rd State Lands Office Xx Xxxxxx Creek Rd Spur B1 Spur B2 Spur B3 1.05 0.6 1.38 0.8 1.33 0.5 Maintenance New Construction When soil moisture conditions permit See Contract VII. F. Unit Designations and Attachment A Osprey/Eagle Mitigation maps Road work is dry, frozen or snow covered All road work will to be completed prior to harvest or hauling within a unit. Road 28-1 1,688 feet 7,422 feet Maintenance New Construction Road 28-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction before logging the unit accessed by the road B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 281 18” 34’ 16 1700 gallon Petroleum Emulsion Dust Control EDL-1 and Road 28-2 MT TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to applicationOfficer. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% Hard Fescue N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location N/ATABLE B-2 (Continued): MATERIALS FURNISHED BY THE PURCHASER FOR DELIVERY: The Purchaser is required to furnish the described material, to be delivered and unloaded by the Purchaser at the DNRC Xxxxx Unit office, 000 Xxxxx Xxxxx Xxxxxx Xxxx, Xxxxx, XX. Materials shall be delivered before June 30, 2024. All materials furnished by the Purchaser become the property of the State when delivered. Amount Description and Specifications 100 pounds Certified Noxious Weed-Free Seed in the following blend: 13% Revenue or Primar Slender Wheatgrass 13% Bromar Mountain Brome 26% Tegmar Intermediate Wheatgrass 13% Durar Hard Fescue 8% Alsyke Clover 13% Ruebens Canada Bluegrass 14% Annual Rye

Appears in 1 contract

Samples: Office Sample Contract

AutoNDA by SimpleDocs

Roads. The Purchaser is required to construct the roads shown in Table B-1 per according to the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Type of Construction Operation Period Completion Date or Requirement Buffalo Bill FS Road 13.55 714 4.5 miles 766 feet Maintenance June 1 – October 31 October 31, 2021 FS Road 1.6 miles Maintenance Reconstruction June 1 – October 31 October 31, 0000 Xxx Xxxxx Xxxx 1.1 miles New Construction When soil is dryJune 1 – October 31 October 31, frozen or snow covered All road work will be completed prior to harvest or hauling within a unit. Road 28-0000 Xxx Xxxxx Xxxx 1.4 miles New Construction June 1 1,688 feet 7,422 feet Maintenance – October 31 October 31, 2021 Optional Xxxx 0 xxxx xxxx .00 miles New Construction Road 28-2 8,370 feet New Construction Road 20-Obliteration June 1 2,668 feet New Construction Road 20-2 1,996 feet New Construction – October 31 Prior to harvest Obliteration at completion of harvest B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description 1 ea 1 ea 1 ea 24” 18” 18” 70’ 50’ 70’ 16 Steel 16 Steel 16 Steel Bands and hardware as needed for CMP’s Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30374 Revenue or Primar" Slender Wheatgrass 5 lbs. 19% Annual Ryegrass 30of mix “Xxxx” or “Mandan” Pubescent Wheatgrass 6 lbs. 28% Mountain Brome 25% Streambank Wheatgrass 15% of mix “Durar” or “Whitmar” Hard Fescue N/A 3 lbs. 14% of mix “Ruebens” Canada bluegrass 4 lbs. 19% of mix Sheep Fescue 4 lbs. 10% of the mix TOTAL LBS./ACRE PURE LIVE SEED 22 lbs. NONE TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Slash generated during road brushing operations can be used for slash filter windrows. If this material is not adequate the forest officer will work with the contractor to use slash found as close to the application site as possible. Amount Description N/A 1 Pipe Gate - Pickup in Missoula at DNRC Office 0000 00xx Xxxxxx, Install as directed by forest officer. Fill Material Yards Type Source Location Delivery Location N/ATABLE B-2 (Continued): MATERIALS FURNISHED BY THE PURCHASER FOR DELIVERY: The Purchaser is required to furnish the described material, to be delivered and unloaded by the Purchaser at the DNRC Unit name Unit office, address or location. Materials shall be delivered before date. All materials furnished by the Purchaser become the property of the State when delivered. Amount Description and Specifications

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Miles Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Sunday Mountain Road 13.55 miles 766 feet 0.9 Maintenance New Construction When and BMP site improvement Any time soil is drynot too wet or too dry to allow shaping and compaction as determined by Forest Officer Prior to Log Hauling and following harvest Xxx Creek Road (NFD 3730) 1.3 Xxxx Xxx Road (NFD 3732) 2.3 Heavy Maintenance and BMP site improvement No Name Road 0.1 Obliteration Prior to contract completion 7801 0.9 Maintenance and BMP site improvement Between June 16 and March 30, frozen Any time soil is not too wet or snow covered All road work will be completed prior too dry to allow shaping and compaction as determined by Forest Officer Prior to Log Hauling and following harvest or hauling within a unit. Road 28-1 1,688 feet 7,422 feet Spur 9 1.0 Spur 15 0.7 Spur 36 1.8 Spur 13 0.6 Spur 14 0.5 Heavy Maintenance New Construction Road 28-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction and BMP site improvement Xxxxxx Spur 0.1 B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description 1 12 inches 24 feet 16 7 16-foot conveyer belt water-diverter NOTE: (3 extra 16-foot flappers have been added to allow for potential damage during harvest period. Extras will be credited to contractor if no flappers are damaged during harvest period) 8 18-foot conveyer belt water-diverter NOTE: (3 extra 16-foot flappers have been added to allow for potential damage during harvest period. Extras will be credited to contractor if no flappers are damaged during harvest period) 3 20-foot conveyer belt water-diverter 50 feet Geotextile fabric (27 feet wide) 140 feet Geotextile fabric (12 feet wide) Fill Material Yards Type Delivery Location 0 55 Pit run Xxxx xxxxx Xxx Road – MM 1.50 and 1.73 10 3/4”- minus Xxxx 28-1 and Xxx Road 28-2 – MM 1.75 5 Talus Xxxx Xxx Road – MM 1.75 TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30389 20% Annual Ryegrass 3015% Slender Wheatgrass 25% Mountain Brome 15% Canada bluegrass (Ruebens) 25% Streambank Wheatgrass 15% Hard Fescue fescue (Durar) N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A N/A Fill Material Yards Type Source Location Delivery Location N/A N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE PURCHASER FOR DELIVERY: The Purchaser is required to furnish the described material, to be delivered and unloaded by the Purchaser at the DNRC Unit name Unit office, address or location. Materials shall be delivered before date. All materials furnished by the Purchaser become the property of the State when delivered. Amount Description and Specifications N/A

Appears in 1 contract

Samples: Junction Sample Contract

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length (Feet) Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Road 13.55 miles 766 feet Spur 16A 4150 Maintenance New Construction When soil is dry, frozen or snow covered All road work will be completed prior conditions allow Prior to harvest or hauling within a unit. Spur 16B 720 Maintenance RR Grade East 2267 Maintenance Powerline Road 28-1 1,688 feet 7,422 feet 5808 Maintenance New Construction Road 28-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction Spur 8A 3669 Xxxxxxxxxxx Xxxx 0X 0000 Xxxxxxxxxxx Xxxx 0X 5478 Maintenance Spur 8D 1325 Maintenance Section 8 Loop (west entrance) 1322 Maintenance Section 8 Loop (east entrance) 477 Maintenance B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 110 Drain rock - 2” screened and cleaned Several locations along the Powerline Road 28-2 TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% Hard Fescue N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location N/A1 14 foot Cattle Gate 1 12 foot Cattle Gate and posts

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Approx. Length (miles) Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Hill Road 13.55 miles 766 feet 2.31 Maintenance Dry, non-frozen conditions June 16 through October 15 Prior to harvest and by October 15, 2024 0.1 New Construction When soil is dry, frozen or snow covered All road work will be completed prior to harvest or hauling within a unit. On A Log Road 28-1 1,688 feet 7,422 feet 0.71 Maintenance New Construction Road 28-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 500 yd3 1½ inch crushed road mix Sale roads, various stations 350 yd3 Pit run Sale roads, various stations TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Common Name Species Name % of Mix # / Acre Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank 104 ‘Xxxxxx’ Pubescent Wheatgrass 15% Hard Fescue Thinopyrum intermedium 31 7 N/A N/A ‘Sodar’ Streambank Wheatgrass Elymus lanceolatus 17 4 ‘Xxxxxx’ Western Wheatgrass Pascopyrum smithii 17 4 ‘Xxxxx’ Slender Wheatgrass Elymus trachycaulus 9 2 ‘Covar’ Sheep fescue Festuca ovina 4 1 Total pounds mixed seed per acre 23 TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A - - Fill Material Yards Type Source Location Delivery Location N/ALocation

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Soup Creek Road 13.55 miles 766 feet 3.8 (Miles) Road Maintenance OPERATING PERIOD: a. November 16, 2023 through March 16, 2024, June 16, 2024 through March 16,2025; June 16, 2025 through March 16, 2026; June 16, 2026 through September 30, 2026 and when Soil Compaction Restrictions in Section VII.L.1 of this contract apply. Cilly Creek Road 1.4 (Miles) Road Maintenance New Construction When soil is dryConstruction, frozen or snow covered All renovation, and initial road work will maintenance: Must be completed prior to harvest before hauling logs on that segment. Upper Cilly Ridge Road 2.23 (Miles) Road Maintenance Cilly Trail Road 2.0 (Miles) Road Maintenance Final road maintenance: Before September 30, 2026 Spur 1509 0.9 (Miles) Road Maintenance 2,000 (feet) Road Construction Upper Cilly Soup Road 1.6 (Miles) Road Maintenance 1.2 or hauling within a unit. 5 (Miles) Road 28-1 1,688 feet 7,422 feet Maintenance New Construction Cilly Soup Road 28-2 8,370 feet New Construction 2,500 (feet) Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 N/A TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% 164.4 Tall Fescue 82.2 “Durar” Hard Fescue N/A 94.8 587.9 Annual Rye (includes quick cover) TOTAL TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location 30 1 ½”-minus Goat Creek Pit Spur 1509 STA 2+00, STA 8+00, STA 12+00 TABLE B-2 (Continued): MATERIALS FURNISHED BY THE PURCHASER FOR DELIVERY: The Purchaser is required to furnish the described material, to be delivered and unloaded by the Purchaser at the DNRC Swan Unit office, 00000 Xxxxxxx 00 Xxxx Xxxx, XX 00000-0000. Materials shall be delivered before March 16, 2024. All materials furnished by the Purchaser become the property of the State when delivered. Amount Description and Specifications N/A

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Measurement (Miles) Type of Construction Operation Period Completion Date or Requirement Buffalo Bill Road 13.55 miles 766 feet Sage Spur 1.2 Maintenance New Construction When and BMP Site Improvement June 16 to March 15, Any time soil is drynot too wet or too dry to allow shaping and compaction as determined by the Forest Officer Prior to log hauling; final reclamation or final blading and removal of bridges by Oct 30, frozen or snow covered All road work will be completed prior to harvest or hauling within a unit. Road 28-0000 Xxxx Xxxx X 0.2 Unit 1 1,688 feet 7,422 feet Maintenance Temp 0.2 New Construction Road 28-Temporary Unit 2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet New Construction B. ROAD Temp 0.2 Unit 8 Temp 0.15 Xxxx 0 Xxxx 0.00 X. XXXX CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description 48 12 Lineal feet of construction fabric 00-xxxx xxxxx xxxxxxx Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 N/A N/A TABLE B-2 (CONTINUED): SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% Hard Fescue 104 8 Stillwater Blend Quick Cover N/A N/A TABLE B-2 (Continued): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location 90 Pit Run or common fill local CLT locations TABLE B-2 (Continued): MATERIALS FURNISHED BY THE PURCHASER FOR DELIVERY: The Purchaser is required to furnish the described material, to be delivered and unloaded by the Purchaser at the DNRC Stillwater Unit office, 0000 Xxx 00 Xxxxx xx Xxxxxxxxx, Xxxxx XX 00000. Materials shall be delivered before N/A. All materials furnished by the Purchaser become the property of the State when delivered. Amount Description and Specifications N/A N/A

Appears in 1 contract

Samples: dnrc.mt.gov

Roads. The Purchaser is required to construct the roads shown in Table B-1 per the schedules stated, as shown on the Sale Map, Attachment A, and to the specifications and drawings in Attachment B and other applicable attachments. TABLE B-1. ROAD CONSTRUCTION REQUIREMENTS Road Name or Number Approximate Length Type of Construction Operation Period Completion Date or Requirement Buffalo Bill XxXxxxx Ridge Road 13.55 miles 766 feet 7.6 Miles 1.4 Miles Maintenance Reconstruction Any season except when restricted by the Forest Officer for unsuitable construction conditions. ***Portion of XxXxxxx Ridge Upper Spur will be restricted to August 16-March 31. See attached timing restriction map. ***** Fishtrap Face High Road 2.2 Miles 4,635 Feet Reconstruction New Construction XxXxxxx Ridge Upper Spur Road 4-1 0.4 Miles 1,610 Feet 200 Feet 2,750 Feet Maintenance New Construction When soil is dry, frozen or snow covered Reconstruction New Construction All road work will be completed prior to harvest or hauling within a unit. Road 28-1 1,688 feet 7,422 feet Maintenance XxXxxxx Ridge Lower Spur 0.4 Miles 1,650 Feet Reconstruction New Construction Road 284-2 8,370 feet New Construction Road 20-1 2,668 feet New Construction Road 20-2 1,996 feet 580 Feet New Construction B. ROAD CONSTRUCTION MATERIALS ESTIMATE: TABLE B-2: MATERIALS FURNISHED AND INSTALLED BY THE PURCHASER: The Purchaser is required to furnish the described material and install as required in Attachment B. Quantities are estimated, and the Attachment B requirements and specifications must be met regardless of the estimated amounts. All materials furnished by the Purchaser become the property of the State when installed. If, due to a minor design change, material is not installed, the material will be delivered to the nearest DNRC Unit Office and become property of the State upon delivery. Corrugated Metal Pipe Other Materials No. Diameter Length Gauge Amount Description Fill Material Yards Type Delivery Location 0 Xxxx xxxxx Xxxx 28-1 and Road 28-2 18” 60 feet 16 1 18” CMP Band TABLE B-2 (CONTINUED): B-2: SEED AND FERTILIZER REQUIREMENTS The Purchaser is required to furnish and apply certified noxious weed-free, pure live seed mixture(s) and fertilizer in the amounts shown. Total pounds mixed seed are pure live seed, corrected for germination and purity. Germination and purity tests must have been conducted within the last 12 months prior to delivery. Purchaser shall furnish documentation of germination and purity tests to the Forest Officer prior to application. Certified Noxious Weed-Free Seed Fertilizer Pounds Description Pounds Analysis (N-P-K) 486 340 30% Annual Ryegrass 30% Mountain Brome 25% Streambank Wheatgrass 15% Hard Fescue N/A 4,250 16-16-16 TABLE B-2 (ContinuedCONTINUED): MATERIALS FURNISHED BY THE STATE: The Purchaser is required to load and haul the described materials from the State source and install them as required in Attachment B. Amount Description N/A Fill Material Yards Type Source Location Delivery Location N/A1 cu. yd Borrow on site. Used to rock armor CMP.

Appears in 1 contract

Samples: dnrc.mt.gov

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!