Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant services provided by a firm estimated to cost the equivalent of $100,000 or more; (e) each contract for consultant services provided by an individual estimated to cost the equivalent of $50,000 or more; and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selection. All other contracts shall be subject to Post Review by the Association.

Appears in 2 contracts

Samples: Financing Agreement, Grant Agreement

AutoNDA by SimpleDocs

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 200,000 or more; , (b) each contract for works estimated to cost the equivalent of $500,000 200,000 or moremore procured on the basis of International Competitive Bidding, Limited International Bidding or National Competitive Bidding, or Direct Contracting; and (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; (e) each contract for consultant services provided by an individual estimated to cost the equivalent of $50,000 or more; and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selection. All other contracts shall be subject to Post Review by the Association.. SCHEDULE 4

Appears in 2 contracts

Samples: Development Grant Agreement, Development Grant Agreement

Review by the Association of Procurement Decisions. The Procurement Plan shall set forth those contracts which shall be subject to the Association’s Prior Review. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; (eb) each contract for consultant services to be provided by an individual consultants estimated to cost the equivalent of $50,000 or more; and (fc) each contract for consultant services to be provided by a firm or an individual procured under Single on the basis of Single-Source Selection. All other contracts shall be subject to Post Review by the Association.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 200,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; and (ec) each contract for consultant consultants’ services provided by an individual consultant estimated to cost the equivalent of $50,000 or more; in addition, the first two (2) contracts of each Procurement and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selectionselection methods shall be subject to prior Review. All other contracts shall be subject to Post Review by the Association.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 $ 200,000 or moremore per contract; (b) each contract for works estimated to cost the equivalent all contracts selected on basis of $500,000 or moreDirect Contracting; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $$ 100,000 or moremore per contract; (ed) each contract for consultant consultants’ services provided by an individual consultant estimated to cost the equivalent of $$ 50,000 or moremore per contract; and (fe) each contract for consultant services provided by a firm or an individual procured under all contracts selected on Single Source Selectionbasis. All other contracts shall be subject to Post Review by the Association.

Appears in 2 contracts

Samples: Financing Agreement, Financing Agreement

Review by the Association of Procurement Decisions. A. Except as the Association shall otherwise determine by notice to the RecipientBorrower, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods goods, works and services (other than consultants’ services) estimated to cost the equivalent of $250,000 100,000 or more; and (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; (e) each contract for consultant services provided by an individual estimated to cost the equivalent of $50,000 or more; and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selection. All other contracts shall be subject to Post Review by the Association.

Appears in 2 contracts

Samples: Development Credit Agreement, Credit Agreement

Review by the Association of Procurement Decisions. 1. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 500,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 5,000,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 200,000 or more; (ed) each contract for individual consultant services provided by an individual estimated to cost the equivalent of $50,000 100,000 or more; and (fe) each all contract for consultant services provided by a firm procured on the basis of single source or an individual procured under Single Source Selectiondirect contracting. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for works estimated to cost the equivalent of $500,000 or more; (b) (a) each contract for goods estimated to cost the equivalent of $250,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 200,000 or more; (ed) each contract for consultant services provided by an individual consultants estimated to cost the equivalent of $50,000 or more; and (fe) each contract for consultant services provided by all contracts procured on a firm or an individual procured under Single Source Selectionsingle source basis. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods procured on the basis of International Competitive Bidding and estimated to cost the equivalent of $250,000 100,000 or more, or procured on the basis of Direct Contracting; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; (e) each contract for consultant services , or provided by an individual estimated to cost the equivalent of $50,000 or more; and (fc) each contract for consultant services provided by a firm or an individual procured under Single Source Selectionall single-source selection. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the RecipientBorrower, the following contracts shall be subject to Prior Review by the Association: (a) each contract for works, including supply and installation estimated to cost the equivalent of $500,000 or more; (b) each contract for goods estimated to cost the equivalent of $250,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant services provided by a firm the employment of consulting firms estimated to cost the equivalent of $100,000 or more; and (ed) each contract for consultant services provided by an the employment of individual consultants estimated to cost the equivalent of $50,000 or more; and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selection. All other contracts shall be subject to Post Review by the Association.. SCHEDULE 4

Appears in 1 contract

Samples: Development Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (b) each contract for goods estimated to cost the equivalent of $200,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; and (d) each contract for goods or works procured on the basis of Direct Contracting regardless of its value; and (e) each contract for consultant consultants services provided by an individual estimated to cost procured on the equivalent basis of $50,000 or more; and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selection. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods or works estimated to cost the equivalent of $250,000 100,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by by: (i) a firm estimated to cost the equivalent of $100,000 or more; or (eii) each contract for consultant services provided by an individual consultants estimated to cost the equivalent of $50,000 or more; and (fc) each contract for consultant services provided by a firm or an individual procured under Single Source Selectionany single source selection. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 300,000 or more, procured on the basis of International Competitive Bidding; (cb) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; and (ec) each contract for consultant consultants’ services provided by an individual estimated to cost the equivalent of $50,000 or more; and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selection. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated estimate to cost the equivalent of $250,000 US$100,000 or more; (b) each contract for works estimated to cost goods procured on the equivalent basis of $500,000 or moreDirect Contracting, regardless of its value; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant technical assistance services provided by a firm estimated to cost the equivalent of $US$100,000 or more; (e) each contract for consultant services provided by an individual estimated to cost the equivalent of $50,000 or more; and (fd) each contract for consultant technical assistance services provided by awarded on a firm or an individual procured under Single Source SelectionSelection basis, regardless of its value. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

AutoNDA by SimpleDocs

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 100,000 or moremore and each contract procured on the basis of Direct Contracting; (cb) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; (ec) each contract for consultant consultants services provided by an individual estimated to cost the equivalent of $50,000 or more; and (fd) each contract for consultant consultants’ services provided by a firm or an individual procured under on the basis of Single Source Selection; and (e) each contract for transportation services estimated to cost the equivalent of $100,000 or more. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 100,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; (ec) each contract for consultant services provided by an consultants service, regardless of its value, to be procured on the basis of Single Source Selection; and (d) each contract for the employment of individual consultants estimated to cost the equivalent of $50,000 or more; and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selection. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 $ 200,000 or moremore per contract; (b) each contract for works estimated to cost the equivalent all contracts selected on basis of $500,000 or moreDirect Contracting; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultant’s services provided by a firm estimated to cost the equivalent of $$ 100,000 or moremore per contract; (ed) each contract for consultant consultants’ services provided by an individual consultant estimated to cost the equivalent of $$ 50,000 or moremore per contract; and (fe) each contract for consultant services provided by a firm or an individual procured under all contracts selected on Single Source Selectionbasis. All other contracts shall be subject to Post post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost procured on the equivalent basis of $250,000 or moreInternational Competitive Bidding; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; (ec) each contract for consultant consultants’ services provided by an individual estimated to cost the equivalent of $50,000 or more; and (fd) each contract for consultant consultants’ services provided by a firm or an individual procured under Single Source Selectioneither single source selection or least-cost selection, regardless of their respective values. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods goods, works and services (other than consultants’ services) estimated to cost the equivalent of $250,000 US$200,000 or more; (b) each contract for goods, works estimated to cost the equivalent and services (other than consultants’ services) procured under Direct Contracting regardless of $500,000 or moreits value; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $US$100,000 or more; (e) each contract for consultant services provided by an individual estimated to cost the equivalent of $50,000 or more; and (fd) each contract for consultant consultants’ services provided by a firm or an individual procured to be awarded under Single Source Selection, regardless of its value. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods estimated to cost the equivalent of $250,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (b) each contract for goods estimated to cost the equivalent of $200,000 or more; and (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; (e) each contract for consultant services provided by an individual estimated to cost the equivalent of $50,000 or more; and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selection. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract all contracts in excess of US$50,000 for goods estimated to cost and all Direct Contracting contracts, regardless of contract value, and the equivalent of $250,000 or morefirst three (3) Shopping contracts; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or moremore and Single Source Selection of consultants; and (ec) each contract for consultant services provided by an individual Individual Consultant assignments estimated to cost the equivalent of $US$50,000 or more; more and (f) each Sole-Source selection of individuals, regardless of contract for consultant services provided by a firm or an individual procured under Single Source Selectionvalue. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for works estimated to cost the equivalent of $1,000,000 or more; (b) each contract for goods estimated to cost the equivalent of $250,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 or more; and (ed) each contract for consultant services provided by an individual estimated consultants to cost the equivalent of $50,000 or more; and (f) each contract for consultant services provided by a firm or an individual procured under Single Source Selection. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Review by the Association of Procurement Decisions. Except as the Association shall otherwise determine by notice to the Recipient, the following contracts shall be subject to Prior Review by the Association: (a) each contract for goods or works estimated to cost the equivalent of $250,000 300,000 or more; (b) each contract for works estimated to cost the equivalent of $500,000 or more; (c) each contract for goods or works procured under Direct Contracting; (d) each contract for consultant consultants’ services provided by a firm estimated to cost the equivalent of $100,000 200,000 or more; (ec) each contract for consultant services provided by an individual consultants estimated to cost the equivalent of $50,000 or more; (d) the first three contracts under each procurement or selection method; and (fe) each contract for consultant services provided by a firm or an individual procured under Single Source Selectionselection contract. All other contracts shall be subject to Post Review by the Association.

Appears in 1 contract

Samples: Financing Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.