Quality Plan. The plan prepared by the Contractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor and subcontractor personnel (including the Quality Manager and the Contractor's key people under clause 3.6(a)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding quality generally during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 (including how the Contractor will ensure maximum consistency between the Contractor's quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.2; the procedure for ensuring subcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Activities and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Activities and the Works; the procedure for regular auditing or other monitoring of Contractor and subcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by: the Contract; or the Contract Administrator.
Appears in 5 contracts
Sources: Head Contract, Early Contractor Involvement Head Contract, Head Contract
Quality Plan. The plan prepared by the Contractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook Handbook, the ESD and WOL Plan Guide and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan (if any) must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor and subcontractor personnel (including the Quality Manager and the Contractor's key people under clause 3.6(a)2.3) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Contract AdministratorPDS Contractor, the Commonwealth and Other Contractors regarding quality generally during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 8.7 (including how the Contractor will ensure maximum consistency between the Contractor's quality assurance procedure, system or framework and the Quality PlanPlan (if any)); the procedure for regularly reviewing, updating and amending the Quality Plan (if any) under clause 9.28.7; the procedure for ensuring subcontractor compliance with the Quality PlanPlan (if any); the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Activities and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Activities and the Works; the procedure for regular regularly auditing or other monitoring of Contractor and subcontractor compliance with the Quality PlanPlan (if any), including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by: the Contract; or the Contract AdministratorPDS Contractor.
Appears in 3 contracts
Sources: Medium Works Contract, Medium Works Contract, Medium Works Contract
Quality Plan. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail the procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must not be inconsistent with the Contractor’s Quality Plan and must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's Consultant’s quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor and subcontractor Consultant personnel (including the Quality Manager and the Contractor's Consultant’s key people under clause 3.6(a4.4(a)(i)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding quality generally during the Contractor's Activities and the WorksServices; the training and awareness programmes provided to Contractor and subcontractor Consultant personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan to meet the requirements of the Subcontract under clause 9.2 7.4 (including how the Contractor Consultant will ensure maximum consistency between the Contractor's Consultant’s quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.2; the procedure for ensuring subcontractor compliance with the Quality Plan7.4; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Activities and the WorksServices, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Activities and the WorksServices; the procedure for regular auditing or other monitoring of Contractor and subcontractor Consultant compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Activities and the WorksServices; the additional matters specified in the Contract Subcontract Particulars; and any other matters required byby the: the ContractSubcontract; or Contractor’s Representative. Any person provided with Confidential Information and, if clause 19 applies, Sensitive and Classified Information (or any part of it) (whether in a tangible or an intangible form). The schedule of proforma contracts and other documents applicable to the Contract AdministratorDefence Design Services Subcontract (DSSC-1 2021): posted on DEQMS (or any alternative location notified by the Commonwealth), as amended from time to time by the Commonwealth; and which as at the Award Date include the contracts and other documents specified in the Subcontract Particulars.
Appears in 3 contracts
Sources: Design Services Subcontract, Design Services Subcontract, Design Services Subcontract
Quality Plan. The plan prepared by the Contractor Subcontractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the ContractorSubcontractor's Activities and the Subcontract Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must not be inconsistent with the Contractor’s Quality Plan and must address, at a minimum: all Statutory Requirements; all Quality Objectives; the ContractorSubcontractor's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the Quality Manager and the ContractorSubcontractor's key people under clause 3.6(a)2.3) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding quality generally during the ContractorSubcontractor's Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 8.7 (including how the Contractor Subcontractor will ensure maximum consistency between the ContractorSubcontractor's quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.28.7; the procedure for ensuring subcontractor subsubcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the ContractorSubcontractor's Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the ContractorSubcontractor's Activities and the Subcontract Works; the procedure for regular regularly auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the ContractorSubcontractor's Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by: the ContractSubcontract; or the Contract AdministratorContractor’s Representative.
Appears in 2 contracts
Quality Plan. The plan prepared by the Contractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor and subcontractor personnel (including the Quality Manager and the Contractor's key people under clause 3.6(a)2.3) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding quality generally during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 8.7 (including how the Contractor will ensure maximum consistency between the Contractor's quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.28.7; the procedure for ensuring subcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Activities and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Activities and the Works; the procedure for regular regularly auditing or other monitoring of Contractor and subcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required byby the: the Contract; or the Contract Administrator.
Appears in 2 contracts
Sources: Medium Works Contract, Medium Works Contract
Quality Plan. The plan prepared by the Contractor Subcontractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the Contractor's Subcontractor’s Activities and the Subcontract Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must not be inconsistent with the Contractor’s Quality Plan and must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's Subcontractor’s quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the Quality Manager and the Contractor's Subcontractor’s key people under clause 3.6(a)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding quality generally during the Contractor's Subcontractor’s Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 (including how the Contractor Subcontractor will ensure maximum consistency between the Contractor's Subcontractor’s quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.2; the procedure for ensuring subcontractor subsubcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Subcontractor’s Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Subcontractor’s Activities and the Subcontract Works; the procedure for regular auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Subcontractor’s Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required byby the: the ContractSubcontract; or the Contract AdministratorContractor’s Representative.
Appears in 2 contracts
Quality Plan. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail the procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must address, at a minimum: all Statutory Requirements; all Quality Objectives; the ContractorConsultant's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor Consultant and subcontractor subconsultant personnel (including the Quality Manager and the ContractorConsultant's key people under clause 3.6(a4.5(a)(i)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding quality generally during the Contractor's Activities and the WorksServices; the training and awareness programmes provided to Contractor Consultant and subcontractor subconsultant personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan to meet the requirements of the Contract under clause 9.2 7.4 (including how the Contractor Consultant will ensure maximum consistency between the ContractorConsultant's quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.27.4; the procedure for ensuring subcontractor subconsultant compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Activities and the WorksServices, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Activities and the WorksServices; the procedure for regular auditing or other monitoring of Contractor Consultant and subcontractor subconsultant compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Activities and the WorksServices; the additional matters specified in the Contract Particulars; and any other matters required byby the: the Contract; or the Contract Administrator.
Appears in 1 contract
Sources: Design Services Contract
Quality Plan. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail the procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook Handbook, the ESD and WOL Plan Guide and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must address, at a minimum: all Statutory Requirements; all Quality Objectives; the ContractorConsultant's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor Consultant and subcontractor subconsultant personnel (including the Quality Manager and the ContractorConsultant's key people under clause 3.6(a4.5(a)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding quality generally during the Contractor's Activities and the WorksServices; the training and awareness programmes provided to Contractor Consultant and subcontractor subconsultant personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan to meet the requirements of the Contract under clause 9.2 7.4 (including how the Contractor Consultant will ensure maximum consistency between the ContractorConsultant's quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.27.4; the procedure for ensuring subcontractor subconsultant compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Activities and the WorksServices, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Activities and the WorksServices; the procedure for regular regularly auditing or other monitoring of Contractor Consultant and subcontractor subconsultant compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Activities and the WorksServices; the additional matters specified in the Contract Particulars; and any other matters required by: the Contract; or the Contract Administrator.
Appears in 1 contract
Sources: Design Services Contract
Quality Plan. The plan prepared by the Contractor Subcontractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the Contractor's Subcontractor’s Activities and the Subcontract Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook Manual, the ESD and WOL Plan Guide and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must not be inconsistent with the Contractor’s Quality Plan and must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's Subcontractor’s quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the Quality Manager and the Contractor's Subcontractor’s key people under clause 3.6(a)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding quality generally during the Contractor's Subcontractor’s Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 (including how the Contractor Subcontractor will ensure maximum consistency between the Contractor's Subcontractor’s quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.2; the procedure for ensuring subcontractor subsubcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Subcontractor’s Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Subcontractor’s Activities and the Subcontract Works; the procedure for regular regularly auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Subcontractor’s Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by: the ContractSubcontract; or the Contract AdministratorContractor’s Representative.
Appears in 1 contract
Sources: Major Works Subcontract
Quality Plan. The plan prepared by the Contractor Subcontractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the ContractorSubcontractor's Activities and the Subcontract Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must not be inconsistent with the Contractor’s Quality Plan and must address, at a minimum: all Statutory Requirements; all Quality Objectives; the ContractorSubcontractor's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the Quality Manager and the ContractorSubcontractor's key people under clause 3.6(a)2.3) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding quality generally during the ContractorSubcontractor's Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 8.7 (including how the Contractor Subcontractor will ensure maximum consistency between the ContractorSubcontractor's quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.28.7; the procedure for ensuring subcontractor subsubcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the ContractorSubcontractor's Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the ContractorSubcontractor's Activities and the Subcontract Works; the procedure for regular regularly auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the ContractorSubcontractor's Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by: the ContractSubcontract; or the Contract AdministratorContractor’s Representative. Any person provided with Confidential Information and, if clause 21 applies, Sensitive and Classified Information (or any part of it) (whether in a tangible or an intangible form), including potential or actual subsubcontractors, suppliers and material suppliers. An area identified on the map located at ▇▇▇.▇▇▇▇.▇▇▇.▇▇/▇▇▇▇▇▇▇▇-▇▇▇▇▇▇/▇▇▇▇▇▇▇▇▇▇-▇▇▇▇▇▇▇/▇▇▇▇-map-data, as updated from time to time.
Appears in 1 contract
Sources: Medium Works Subcontract
Quality Plan. The plan prepared by the Contractor Subconsultant and finalised under clause 9.27.4, which must set out in adequate detail the procedures the Contractor Subconsultant will implement to manage the Contractor's Activities and the Works Subcontract Services from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must not be inconsistent with the Consultant’s Quality Plan and must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's Subconsultant’s quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor and subcontractor Subconsultant personnel (including the Quality Manager and the Contractor's Subconsultant’s key people under clause 3.6(a4.4(a)(i)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the DSC Contract Administrator, the Commonwealth Consultant, the Consultant’s Representative and Other Contractors regarding quality generally during the Contractor's Activities and the WorksSubcontract Services; the training and awareness programmes provided to Contractor and subcontractor Subconsultant personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan to meet the requirements of the Subcontract under clause 9.2 7.4 (including how the Contractor Subconsultant will ensure maximum consistency between the Contractor's Subconsultant’s quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.2; the procedure for ensuring subcontractor compliance with the Quality Plan7.4; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Activities and the WorksSubcontract Services, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Activities and the WorksSubcontract Services; the procedure for regular auditing or other monitoring of Contractor and subcontractor Subconsultant compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Activities and the WorksSubcontract Services; the additional matters specified in the Contract Subcontract Particulars; and any other matters required byby the: the ContractSubcontract; or the Contract AdministratorConsultant’s Representative. Any person provided with Confidential Information and, if clause 19 applies, Sensitive and Classified Information (or any part of it) (whether in a tangible or an intangible form).
Appears in 1 contract
Sources: Design Services Subcontract
Quality Plan. The plan prepared by the Contractor and finalised under clause 9.27.7, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Remediation Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor and subcontractor personnel (including the Quality Manager and the Contractor's key people under clause 3.6(a)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding quality generally during the Contractor's Activities and the Remediation Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 7.7 (including how the Contractor will ensure maximum consistency between the Contractor's quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.27.7; the procedure for ensuring subcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Activities and the Remediation Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Activities and the Remediation Works; the procedure for regular regularly auditing or other monitoring of Contractor and subcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Activities and the Remediation Works; the additional matters specified in the Contract Particulars; and any other matters required by: the Contract; or the Contract Administrator.
Appears in 1 contract
Sources: Panel Agreement
Quality Plan. The plan prepared by the Contractor Subcontractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the Contractor's Subcontractor’s Activities and the Subcontract Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must not be inconsistent with the Contractor’s Quality Plan and must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's Subcontractor’s quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the Quality Manager and the Contractor's Subcontractor’s key people under clause 3.6(a)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding quality generally during the Contractor's Subcontractor’s Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 (including how the Contractor Subcontractor will ensure maximum consistency between the Contractor's Subcontractor’s quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.2; the procedure for ensuring subcontractor subsubcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Subcontractor’s Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Subcontractor’s Activities and the Subcontract Works; the procedure for regular auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Subcontractor’s Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required byby the: the ContractSubcontract; or Contractor’s Representative. Any person provided with Confidential Information and, if clause 21 applies, Sensitive and Classified Information (or any part of it) (whether in a tangible or an intangible form), including potential or actual subsubcontractors, suppliers and material suppliers. Has the Contract Administratormeaning given to it in section 9 of the Corporations Act 2001 (Cth).
Appears in 1 contract
Sources: Major Works Subcontract
Quality Plan. The plan prepared by the Contractor Subcontractor and finalised under clause 9.28.7, which must set out in adequate detail the procedures the Contractor Subcontractor will implement to manage the ContractorSubcontractor's Activities and the Subcontract Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook Manual, the ESD and WOL Plan Guide and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must not be inconsistent with the Contractor’s Quality Plan and must address, at a minimum: all Statutory Requirements; all Quality Objectives; the ContractorSubcontractor's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the Quality Manager and the ContractorSubcontractor's key people under clause 3.6(a)2.3) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding quality generally during the ContractorSubcontractor's Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 8.7 (including how the Contractor Subcontractor will ensure maximum consistency between the ContractorSubcontractor's quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.28.7; the procedure for ensuring subcontractor subsubcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the ContractorSubcontractor's Activities and the Subcontract Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the ContractorSubcontractor's Activities and the Subcontract Works; the procedure for regular regularly auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the ContractorSubcontractor's Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by: the ContractSubcontract; or the Contract AdministratorContractor’s Representative. Any person provided with Confidential Information and, if clause 21 applies, Sensitive and Classified Information (or any part of it) (whether in a tangible or an intangible form), including potential or actual subsubcontractors, suppliers and material suppliers. Has the same meaning as in subsection 3(2) of the Building Code 2016. An area identified on the map located at ▇▇▇▇▇://▇▇▇.▇▇▇▇.▇▇▇.▇▇/▇▇▇▇▇▇▇▇-▇▇▇▇▇▇/▇▇▇▇▇▇▇▇▇▇-▇▇▇▇▇▇▇/▇▇▇▇-map-data The accounting system used by the Commonwealth. The schedule of proforma contracts and other documents applicable to the Medium Works Subcontract (MESC-1 2003) posted on DEQMS (or any alternative location notified by the Commonwealth), as amended from time to time by the Commonwealth and which, as at the Award Date, includes the contracts and other the documents specified in the Subcontract Particulars.
Appears in 1 contract
Sources: Medium Works Subcontract
Quality Plan. The plan prepared by the Contractor and finalised under clause 9.2, which must set out in adequate detail the procedures the Contractor will implement to manage the Contractor's Activities and the Works from a quality perspective to: ensure compliance with the Smart Infrastructure Handbook Handbook, the ESD and WOL Plan Guide and Statutory Requirements; and maximise the achievement of the Quality Objectives. The Quality Plan must address, at a minimum: all Statutory Requirements; all Quality Objectives; the Contractor's quality assurance procedure, system or framework (which may or may not be a certified quality assurance procedure, system or framework); the roles and responsibilities of all Contractor and subcontractor personnel (including the Quality Manager and the Contractor's key people under clause 3.6(a)) regarding quality; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding quality generally during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding quality; the procedure for preparing (including tailoring) and finalising the Quality Plan under clause 9.2 (including how the Contractor will ensure maximum consistency between the Contractor's quality assurance procedure, system or framework and the Quality Plan); the procedure for regularly reviewing, updating and amending the Quality Plan under clause 9.2; the procedure for ensuring subcontractor compliance with the Quality Plan; the procedure for regularly identifying, controlling and monitoring possible and actual impacts on quality associated with the Contractor's Activities and the Works, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such identification, control and monitoring; and complaints regarding quality during the Contractor's Activities and the Works; the procedure for regular regularly auditing or other monitoring of Contractor and subcontractor compliance with the Quality Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding quality during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by: the Contract; or the Contract Administrator.
Appears in 1 contract
Sources: Head Contract