Preliminary Design Report. Prepare a Preliminary Design Report: The consultant shall establish and indicate project specific design criteria and standards within the Preliminary Design Report (including ADA requirements). The consultant shall submit all design assumptions for pipe sections, water, sewer, and storm sewer locations, pavement sections, etc. The Consultant shall include design life, design criteria, and reference of design resources. The Consultant shall use the City Infrastructure Design Criteria Manual to establish design criteria and standards. The Preliminary Design Report shall evaluate and recommend either a full reconstruction or a pavement rehabilitation of the streets in the project area; based on the Project geotechnical report, preliminary horizontal and vertical alignments for utilities, roadways, project phasing and limits, and other public improvements. Establish pipe sizes, lane configurations, drainage system capacity, complete water quality assessment, etc. Provide justification for the facility and analysis of alternatives. The project’s geotechnical report shall be included within the Preliminary Project Design Report and include soil classifications, N values, water levels, proctors, CBR’s, resistivity tests, pavement design, and testing recommendations. The Consultant shall elaborate on other project components as necessary. A probable opinion of construction costs for the project(s) shall be included. The costs shall be itemized based on the City’s standard bid items and appropriate contingency item allowance. The consultant shall establish and indicate project specific design criteria and standards within the Preliminary Design Report. Use the City Infrastructure Design Criteria Manual to establish design criteria and standards. The Preliminary Design Report shall provide review of compliance with City’s Standard Specifications for construction of the project(s). Identify the existing right-of-way (ROW) location and any ROW or easements necessary for the Project. Include size and extent of such ROW and easements and contact information of property owners. Identify all non-conforming water and sewer service lines and include a map showing a proposed solution to making them conform with the City’s current standards. Submit one (1) copy and a PDF version of the Preliminary Design Report and preliminary plans and specifications to City of Rapid City’s project manager for review and comment.
Appears in 1 contract
Sources: Professional Services
Preliminary Design Report. Prepare a Preliminary Design Report: The consultant shall establish and indicate project specific design criteria and standards within the Preliminary Design Report (including ADA requirements)Report. The consultant shall submit all design assumptions for pipe sections, water, sewer, and storm sewer locations, pavement sections, etc. The Consultant shall include design life, design criteria, and reference of design resources. The Consultant shall use the City Infrastructure Design Criteria Manual to establish design criteria and standards. The Preliminary Design Report shall evaluate include evaluations and recommend either a full reconstruction or a pavement rehabilitation of the streets in the project area; recommendations based on items outlined under the heading “Project geotechnical report, preliminary horizontal Design and vertical alignments for utilities, roadways, project phasing and limits, and other public improvements. Establish pipe sizes, lane configurations, drainage system capacity, complete water quality assessment, etc. Provide justification for the facility and analysis of alternativesEvaluation Components” above. The project’s geotechnical report shall be included within the Preliminary Project Design Report and include soil classifications, N values, water levels, proctors, CBR’s, resistivity tests, pavement design, and testing recommendations. The Consultant shall elaborate on other project components as necessary. A probable opinion of construction costs for the project(s) project shall be included. The costs shall be itemized based on the City’s standard bid items and in three separate schedules, one for each individual project. The cost will also include appropriate contingency item allowance. The consultant shall establish and indicate project specific design criteria and standards within the Preliminary Design Report. Use the City The City’s Infrastructure Design Criteria Manual shall be used to establish design criteria and standards. The Preliminary Design Report shall provide review of compliance with City’s Standard Specifications for construction of the project(s). Identify the existing right-of-way (ROW) location and any ROW or easements necessary for the Project. Include size and extent of such ROW and easements and contact information of property owners. Identify all non-conforming water and sewer service lines and include a map showing a proposed solution to making them conform with the City’s current standards. Submit one (1) copy and a PDF version of the Preliminary Design Report and preliminary plans and specifications to City of Rapid City’s project manager for review and comment.
Appears in 1 contract
Sources: Professional Services