Participating Meters Sample Clauses

Participating Meters i. Town Garage, CMP Meter - G046555567; CMP Account - 441-156-0630-002.
AutoNDA by SimpleDocs

Related to Participating Meters

  • OGS Centralized Contract: Terms and Conditions The terms and conditions set forth in this section are expressly incorporated in and applicable to the Contract. Captions are intended as descriptive and are not intended to limit or otherwise restrict the terms and conditions set forth herein. Appendix A Appendix A, Standard Clauses for New York State Contracts, dated January 2014, attached hereto, is hereby incorporated in, and expressly made a part of, this Contract. Appendix B Appendix B, Office of General Services General Specifications, dated January 2015 22772 Project Based Information Technology Consulting (Statewide), attached hereto, is hereby incorporated in, and expressly made a part of, this Contract.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Technical Objections to Grievances It is the intent of both Parties of this Agreement that no grievance shall be defeated merely because of a technical error, other than time limitations in processing the grievance through the grievance procedure. To this end, an arbitration board shall have the power to allow all necessary amendments to the grievance and the power to waive formal procedural irregularities in the processing of a grievance, in order to determine the real matter in dispute and to render a decision according to equitable principles and the justice of the case.

  • Program Components Activities and services delivered under this Program Element align with Foundational Programs and Foundational Capabilities, as defined in Oregon’s Public Health Modernization Manual, (xxxx://xxx.xxxxxx.xxx/oha/PH/ABOUT/TASKFORCE/Documents/public_health_modernization_man ual.pdf) as well as with public health accountability outcome and process metrics (if applicable) as follows:

  • Technical Objections to Grievance No grievance will be defeated or denied by any minor technical objection.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Technical Objections No grievance shall be defeated merely because of a technical error, other than time limitations in the processing of the grievance through the grievance procedure. To this end, an arbitrator shall have the power to waive formal procedural irregularities in the processing of the grievance in order to determine the real matter in dispute.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Flexible Hours of Work 19.1 Flexible hours of work, or flextime, is a system designed to provide for the individual preferences and work habits of employees while at the same time ensuring the efficient operation of the Employer's service.

  • Shift Rotation Routine shift rotation is not an approach to staffing endorsed by the Employer. Except for emergency situations where it may be necessary to provide safe patient care, shift rotation will not be utilized without mutual consent. If such an occasion should ever occur, volunteers will be sought first. If no one volunteers, the Employer will rotate shifts on an inverse seniority basis until the staff vacancies are filled.