Painting specification Clause Samples

Painting specification. All steelwork surfaces are to be prepared by means of full abrasive grit blasting to SA2.5 and the application of a three component coating system as per Eskom specifications. The contractor is to remove all sharp edges from the steelwork before any painting is performed. The thickness of the first coat is 125 micrometer, the second coat thickness is 125 micrometers and the topcoat thickness is 40 micrometer.
Painting specification. This specification covers the minimum requirements for the surface preparation and painting of Equipment and structural steelwork and identification of non-buried pipelines. Equipment supplied with a “Manufacturers Standard” paint specification, shall be assessed by the Purchaser to gauge its suitability for the proposed environment. Where the “Manufacturers Standard” paint specification is deemed by the Supplier to be unsuitable for a particular environment it may be enhanced in accordance with this specification. This specification does not relieve the Supplier of the responsibility for complying with any statutory regulations.

Related to Painting specification

  • Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-▇▇▇▇▇-▇▇▇▇▇▇▇-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-▇▇▇▇▇-▇▇▇▇▇▇▇-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • ODUF Packing Specifications 6.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • Packing Specifications 7.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.

  • Service Specification The Parties have agreed upon the scope and specification of the Services provided under this Service Agreement in the Service Specification.