Documentation Management System Sample Clauses

Documentation Management System. The contractor shall establish a document management system which is a comprehensive system for the management of documentation. The relevant documentation must be maintained and updated as changes are made until the completion of the project. Any change shall be automatically propagated through to all related documentation. “Redline” approach will be accepted during implementation phase. Two copies of the system engineering and design stage documentation for technical clarification shall be presented to the Project Manager seven working days prior to the start of the respective formal technical clarification discussions. The system engineering and design stage documentation clarify the respective plant system The Contractor will obtain the acceptance of the system engineering and design stage documentation in the form of design freeze from the Project Manager during the process of the technical clarification meetings. The Project Manager’s acceptance is a requirement for commencement of the production engineering stage of the works.
AutoNDA by SimpleDocs
Documentation Management System. A comprehensive documentation management system is provided. All documentation is maintained and updated until Completion. Any change is propagated automatically to all related documentation. All documentation forms an integral part of the documentation system. The AKZ plant position codes are identified in the documentation. AKZ codes, down to third level, are to be used. The Contractor includes the Project Manager accepted drawing head on all drawings submitted to the Project Manager. The format of all documents is submitted to the Project Manager for acceptance. Automatic prevention of duplication of numbering or ambiguity is built into the system.
Documentation Management System. The Contractor plans the supply of the documentation during the various project stages and provides the documents in accordance with the key scheduled project milestone dates. A comprehensive documentation management system is provided. The Contractor submits all documentation on a formal transmittal form in triplicate to the Project Manager. All manuals, documents and engineering documentation shall be presented in British English.

Related to Documentation Management System

  • STATEWIDE CONTRACT MANAGEMENT SYSTEM If the maximum amount payable to Contractor under this Contract is $100,000 or greater, either on the Effective Date or at any time thereafter, this section shall apply. Contractor agrees to be governed by and comply with the provisions of §§00-000-000, 00-000-000, 00-000-000, and 00- 000-000, C.R.S. regarding the monitoring of vendor performance and the reporting of contract information in the State’s contract management system (“Contract Management System” or “CMS”). Contractor’s performance shall be subject to evaluation and review in accordance with the terms and conditions of this Contract, Colorado statutes governing CMS, and State Fiscal Rules and State Controller policies.

  • PERFORMANCE MANAGEMENT SYSTEM 5.1 The Employee agrees to participate in the performance management system that the Employer adopts or introduces for the Employer, management and municipal staff of the Employer.

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Project Management Services Contractor shall provide business analysis and project management services necessary to ensure technical projects successfully meet the objectives for which they were undertaken. Following are characteristics of this Service:

  • Program Management 1.1.01 Implement and operate an Immunization Program as a Responsible Entity

  • Financial Management System Subrecipient shall establish and maintain a sound financial management system, based upon generally accepted accounting principles. Contractor’s system shall provide fiscal control and accounting procedures that will include the following:

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Monitoring and Management Information C10.1 The Contractor shall comply with the monitoring arrangements set out in the Monitoring Schedule including, but not limited to, providing such data and information as the Contractor may be required to produce under the Contract.

  • Information Management Information and Records