Common use of Pact Duration Clause in Contracts

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 10 contracts

Samples: www.bharatpetroleum.in, www.bharatpetroleum.com, www.bharatpetroleum.in

AutoNDA by SimpleDocs

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. Any violation of the same would entail disqualification of the bidders and exclusion from future business dealings. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharge/determined by Chairperson the Chairman of the PrincipalNABARD.

Appears in 7 contracts

Samples: Agreement, Agreement for Annual Maintenance Contract, P Re Contract

Pact Duration. This The provisions of this Pact begins when shall come into effect from the date of signing of this Pact by the both parties have legally signed itparties. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged by either party during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/determined by the Chairperson of the Principal.

Appears in 6 contracts

Samples: www.keralafdc.org, www.keralafdc.org, www.keralafdc.org

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 6 contracts

Samples: Model Gas Supply Agreement, Integrity Pact, web.nlcindia.com

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Contractor/ Supplier 12 12-months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/ determined by Chairperson of the Principal.

Appears in 5 contracts

Samples: www.bharatpetroleum.in, www.indiansugar.com, www.indiansugar.com

Pact Duration. 9.1 This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, contract and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 4 contracts

Samples: www.eoiprague.gov.in, www.bhel.com, www.bhel.com

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months Contractor after the last payment under closure of the respective contract, contract and for all other Bidders 6 months Bidder's six month after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 4 contracts

Samples: apps.powergrid.in, www.powergrid.in, www.powergrid.in

Pact Duration. 9.1 This Pact begins when both parties have legally signed itand shall be binding on and from the submission of bid(s) by bidder(s). It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, contract and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 4 contracts

Samples: India Transport Framework Agreement, www.bhel.com, www.bhel.com

Pact Duration. 1. This Pact begins when both parties have legally signed it. It expires for the ContractorConsultant/Supplier 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 4 contracts

Samples: www.bharatpetroleum.in, www.bharatpetroleum.in, www.bharatpetroleum.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awardedAgreement is made. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid valid, despite the lapse of this pact Pact, as specified above, unless it is discharged / discharged/determined by Chairperson of the Principal. The Pact duration in respect of unsuccessful Bidders shall expire after 3 months of the award of the contract.

Appears in 4 contracts

Samples: www.deendayalport.gov.in, mumbaiport.gov.in, www.mumbaiport.gov.in

Pact Duration. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders Bidder 6 months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/determined by Chairperson Chairman & Managing Director of the PrincipalNFL.

Appears in 3 contracts

Samples: nationalfertilizers.com, nationalfertilizers.com, www.nationalfertilizers.com

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/determined by Chairperson of the PrincipalCMD, BSNL.

Appears in 3 contracts

Samples: Contract Agreement, Contract Agreement, Proforma for Agreement

Pact Duration. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, contract and for all other Bidders 6 06 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, above unless it is discharged / determined by Chairperson Chairman & Managing Director of the Principal/Buyer.

Appears in 3 contracts

Samples: mazagondock.in, Non Disclosure Agreement, mazagondock.in

Pact Duration. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson Chairman of the Principal.

Appears in 3 contracts

Samples: Integrity Pact, www.shipindia.com, www.shipindia.com

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders Bidder’s 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 3 contracts

Samples: www.nmdc.co.in, www.nmdc.co.in, www.nmdc.co.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months successful Bidder / Contractor after closure of the last payment under the respective contractcontract and, and for all other Bidders 6 months Bidders, after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 3 contracts

Samples: apps.powergrid.in, apps.powergrid.in, krtl.in.net

Pact Duration. 11.1 This Pact begins when both the parties have legally signed it. It expires for the Contractor/Supplier after 12 months after on completion of the last payment under warranty/guarantee period of the respective contractproject / work awarded, and for all other Bidders 6 months after to the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson fullest satisfaction of the Principal.

Appears in 3 contracts

Samples: Pre Contract Integrity, tenders.itiltd.in, tenders.itiltd.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contactor 12 months after the last payment under the respective contract, and for all tall other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson Chairman of the PrincipalEPI.

Appears in 2 contracts

Samples: Integrity Pact, engineeringprojects.com

Pact Duration. This Pact begins when both parties have legally signed singed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders Bidders, 6 months after the contract has been awarded. If any claim is made / made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/ determined by Chairperson of the Principal.

Appears in 2 contracts

Samples: www.bharatpetroleum.in, www.bharatpetroleum.co.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.Chairman and Managing Director, FACT

Appears in 2 contracts

Samples: Integrity Pact, fact.co.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. --------------------------------- ------------------------------------ For "The Principal" For "The Bidder/Contractor" If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 2 contracts

Samples: Mangalore Refinery, Mangalore Refinery

Pact Duration. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/ determined by Chairperson CMD of the PrincipalBEML.

Appears in 2 contracts

Samples: Annexure J, Annexure J

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, contract or contract period (extended if applicable) whichever is later and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/determined by Chairperson Chairman of the PrincipalNTC.

Appears in 2 contracts

Samples: ntcltd.org, www.ntcltd.org

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders Bidders, 6 months after the contract has been awarded. If any claim is made / made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/ determined by Chairperson of the Principal.

Appears in 2 contracts

Samples: www.bharatpetroleum.in, www.bharatpetroleum.in

Pact Duration. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/ determined by Chairperson CMD of the Principal.BEML

Appears in 2 contracts

Samples: www.bemlindia.in, www.bemlindia.in

Pact Duration. 9.1 This Pact begins when both parties have legally signed itand shall be binding on and from the submission of bid(s) by xxxxxx(s). It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, contract and for all other Bidders 6 months after alter the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 2 contracts

Samples: www.bhel.com, bhel.com

Pact Duration. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 Contractor 18 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson Chairman of the PrincipalGRSE.

Appears in 2 contracts

Samples: 164.100.154.65, www.grse.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Contractor/ Supplier 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/ determined by Chairperson of the Principal.

Appears in 2 contracts

Samples: www.bharatpetroleum.in, www.bharatpetroleum.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Vendor 12 months after the last payment under the respective contract, and for all other Bidders Buyers' 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 1 contract

Samples: www.mstcindia.co.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders Bidders' 6 months after the contract has been awarded. Any violation of the same would entail disqualification of the bidders and exclusion from future business dealings. If any claim is made / lodged during this time, time the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson Director of the PrincipalAIIMS Patna.

Appears in 1 contract

Samples: www.aiimspatna.org

Pact Duration. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. Any violation of the same would entail disqualification of the bidders and exclusion from future business dealing. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/determined by Chairperson of the PrincipalDirector, IIT Kanpur.

Appears in 1 contract

Samples: www.iitk.ac.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 Contractor 10 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the PrincipalDirector, NCCS.

Appears in 1 contract

Samples: nccs.res.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the PrincipalChairman & Managing Director, CONCOR.

Appears in 1 contract

Samples: Memorandum of Understanding

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months Contractor 3 years after the last payment under the respective contract, and for all other Bidders 6 12 months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson Board of the PrincipalNACIL.

Appears in 1 contract

Samples: www.mstcecommerce.com

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. Any violation of the same would entail disqualification of the bidders and exclusion from future business dealings. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharge/determined by Chairperson the Chairman of the PrincipalIIIT RANCHI.

Appears in 1 contract

Samples: Annual Maintenance Contract for Providing

AutoNDA by SimpleDocs

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 1 contract

Samples: Integrity Pact

Pact Duration. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson CMD of the PrincipalMECON.

Appears in 1 contract

Samples: Integrity Pact

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Service Provider 12 months after the last payment under the respective contract, and for all other Bidders Service Providers 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 1 contract

Samples: www.jutecorp.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. Any violation of the same would entail disqualification of the bidders and exclusion from future business dealings. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson Chairman of the PrincipalSAIL.

Appears in 1 contract

Samples: www.sailisp.co.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 Contractor12 months after the last payment under the respective contract, and for all other Bidders 6 months 6months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson Chairman of the PrincipalBDL. Clause 10 - Other provisions.

Appears in 1 contract

Samples: bdl-india.in

Pact Duration. This Pact begins when both the parties have legally signed it. It expires for the Contractor/Supplier Bidder / Contractor 12 months after the last payment completion of work under the respective contractContract or till the continuation of defect liability period, whichever is more and for all other Bidders 6 months after Bidders, till the contract has been Contract is awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson the CEO of the Principal.

Appears in 1 contract

Samples: Integrity Pact

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/determined by Chairperson of the Principal.

Appears in 1 contract

Samples: www.oil-india.com

Pact Duration. 1. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, Any violation of the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson would entail disqualification of the Principalbidders and exclusion from future business dealings.

Appears in 1 contract

Samples: nafed-india.com

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 contractor 10 months after the last payment under the respective contract, and for all other Bidders 6 bidders & three months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid valid, despite the lapse of this pact Pact, as specified above, unless it is discharged / discharged/determined by Chairperson of the PrincipalChairman, MbPT.

Appears in 1 contract

Samples: www.mumbaiport.gov.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months Contractor 3 years after the last payment under the respective contract, and for all other Bidders 6 bidders 12 months after the contract has been awarded. If any claim is made / made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson board of the PrincipalAI.

Appears in 1 contract

Samples: tenders.airindia.in

Pact Duration. This 9.1. That this Pact begins comes into force when both the parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last final payment under the respective contract, and for all other Bidders 6 3 months after the contract has been is awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 1 contract

Samples: Integrity Pact

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months Contractor 3 years after the last payment under the respective contract, and for all other Bidders 6 12 months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson Board of the PrincipalAIR INDIA.

Appears in 1 contract

Samples: tenders.airindia.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier contractor 12 months after the last payment under the respective contract, contract and for all other Bidders 6 months after the contract has been awarded. Any violation of the same would entail disqualification of the bidders and exclusion from future business dealings. If any claim is made / made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, above unless it is discharged / discharged/ determined by Chairperson the Head of the PrincipalProcuring Organization.

Appears in 1 contract

Samples: www.cuh.ac.in

Pact Duration. This Pact pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment end of tenure under the respective contract, agreement and for all other Bidders 6 06 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, above unless it is discharged / determined by Chairperson Chairman & Managing Director of the Principal/Buyer.

Appears in 1 contract

Samples: Additional Service Level Agreement

Pact Duration. 1 This Pact begins when both parties have legally signed itcomes into force from the date of signing by all the parties. It expires shall expire for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders unsuccessful bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 1 contract

Samples: Integrity

Pact Duration. This Pact begins being when both parties have legally signed singed it. It If expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders Bidders. 6 months Months after the contract has been awarded. If any claim is made / made/ lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/ determined by Chairperson of the Principal.

Appears in 1 contract

Samples: www.bharatpetroleum.com

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. SIGNATURE & SEAL OF THE VENDOR If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the Principal.

Appears in 1 contract

Samples: www.bharatpetroleum.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contract or 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. Any violation of the same would entail disqualification of the bidders and exclusion from future business dealings. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharge/determined by Chairperson the Chairman of the PrincipalNABARD.

Appears in 1 contract

Samples: Agreement for Maintenance Contract

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/determined by Chairperson of the PrincipalM.D., FSNL.

Appears in 1 contract

Samples: fsnl.nic.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson CMD of the PrincipalGIC Re.

Appears in 1 contract

Samples: www.gicre.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier Contractor 12 months after the last payment under the respective contract, and for all other Bidders 6 months after the contract has been awarded. If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / discharged/determined by Chairperson of the Principal.

Appears in 1 contract

Samples: www.centralcoalfields.in

Pact Duration. This Pact begins when both parties have legally signed it. It expires for the Contractor/Supplier 12 months Contractor 3 years after the last payment under the respective contract, and for all other Bidders 6 12 months after the contract has been awarded. .If any claim is made / made/lodged during this time, the same shall be binding and continue to be valid despite the lapse of this pact as specified above, unless it is discharged / determined by Chairperson of the PrincipalBoard ofPawan Hans.

Appears in 1 contract

Samples: Integrity Pact