Ore Samples Clause Samples

Ore Samples. The mineral content of all ore mined and removed from the Claims (but excluding ore leached in place) and the quantities of constituents recovered by Payor shall be determined by Payor, or with respect to such ore which is sold, by the mill or smelter to which the ore is sold, in accordance with standard sampling and analysis procedures, and shall be weighted average based on the total amount of ore from the Claims crushed and sampled, or the constituents recovered, during an entire calendar quarter. Upon reasonable advance written notice to Payor, Payee shall have the right to have representatives present at the time samples are taken for the purpose of confirming that the sampling and analysis procedure is standard and acceptable according to accepted industry practices.
Ore Samples. The mineral content of all ore mined and removed from the Property (excluding ore leached in place) and the quantities of constituents recovered by Grantor shall be determined by Grantor, or with respect to such ore which is sold, by the mill or smelter to which the ore is sold, in accordance with standard sampling and analysis procedures.
Ore Samples. The mineral content of all ore mined and removed from the Claims (but excluding ore leached in place) and the quantities of constituents recovered by Payor shall be determined by Payor, or with respect to such ore which is sold, by the mill or smelter to which the ore is sold, in accordance with standard sampling and analysis procedures, and shall be weighted average based on the total amount of ore from the Claims crushed and sampled, or the constituents recovered, during an entire calendar quarter. Upon reasonable advance written notice to Payor, Payee shall have the right to have representatives present at the time samples are taken for the purpose of confirming that the sampling and analysis procedure is standard and acceptable according to accepted industry practices. 8. Commingling of Ores. Payor shall have the right to mix or commingle, either underground, at the surface, or at processing plants or other treatment facilities, any material containing Valuable Minerals mined or extracted from the Claims with ores or material derived from other lands or properties owned, leased or controlled by Payor; provided, however, that before commingling, Payor shall calculate from representative samples the average grade of the ore from the Claims and shall either weigh or volumetrically calculate the number of tons of ore from the Claims to be commingled. As products are produced from the commingled ores, Payor shall calculate from representative samples the average percentage recovery of products produced from the commingled ores during each month. In obtaining representative samples, calculating the average grade of commingled ores and average percentage of recovery, Payor may use any procedures acceptable in the mining and metallurgical industry which Payor believes to be accurate and cost-effective for the type of mining and processing activity being conducted, and Payor's choice of such procedures shall be final and binding upon Payee. In addition, comparable procedures may be used by Payor to apportion among the commingled ores any penalty charges imposed by the smelter or refiner on commingled ores or concentrates. The records relating to commingled ores shall be available for inspection by Payee, at Payee's sole expense, at all reasonable times, and shall be retained by Payor for a period of two (2) years. 9.
Ore Samples. The mineral content of all ore mined and removed from the Gold Bar North Property (excluding ore leached in place) and the quantities of constituents recovered by Buyer shall be determined by Buyer, or with respect to such ore which is sold, by the mill or smelter to which the ore is sold, in accordance with standard sampling and analysis procedures.
Ore Samples. The mineral content of all ore mined and removed from the Property (but excluding ore leached in place), and the quantities of constituents recovered by PDUS, shall be determined by PDUS, or with respect to such ore which is sold, by the mill or smelter to which the ore is sold, in accordance with standard sampling and analysis procedures, and shall be weighted average based on the total amount of ore from the Property crushed and sampled, or the constituents recovered, during an entire calendar quarter.

Related to Ore Samples

  • Samples The Contractor shall submit the following samples of Materials and relevant information to the Authority’s Engineer for pre-construction review: (a) manufacturer's test reports and standard samples of manufactured Materials; and (b) samples of such other Materials as the Authority’s Engineer may require.

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • API If the Software offers integration capabilities via an API, your use of the API may be subject to additional costs or Sage specific policies and terms and conditions (which shall prevail in relation to your use of the API). You may not access or use the API in any way that could cause damage to us or the Software, or in contravention of any applicable laws. We reserve the right in our sole discretion, to: (i) update any API from time to time; (ii) place limitations around your use of any API; and (iii) deny you access to any API in the event of misuse by you or to otherwise protect our legitimate interests.

  • SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 4.12.1 Shop Drawings are drawings, diagrams, schedules and other, data specially prepared for the Work by the Contractor or any Subcontractor, manufacturer, supplier or distributor to illustrate some portion of the Work. 4.12.2 Product Data are illustrations, standard schedules, performance charts, instructions, brochures, diagrams and other information furnished by the Contractor to illustrate a material, product or system for some portion of the Work. 4.12.3 Samples are physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. 4.12.4 The Contractor shall review, approve and submit, with reasonable promptness and in such sequence as to cause no delay in the Work or in the work of the State or any separate contractor, all Shop Drawings, Product Data and Samples required by the Contract Documents. 4.12.5 By approving and submitting Shop Drawings, Product Data and Samples, the Contractor represents that he / she has determined and verified all materials, field measurements, and field construction criteria related thereto, or will do so, and that he / she has checked and coordinated the information contained within such submittals with the requirements of the Work and of the Contract Documents. 4.12.6 The Contractor shall not be relieved of responsibility for any deviation from the requirements of the Contract Documents by the Architect's approval of Shop Drawings, Product Data or Samples under Subparagraph 2.2.7 of these General Conditions unless the Contractor has specifically informed the Architect and the State in writing of such deviation at the time of sub- mission and the Architect and the State has given written approval to the specific deviation. The Contractor shall not be relieved from responsibility for errors or omissions in the Shop Drawings, Product Data or Samples by the Architect's approval thereof. 4.12.7 The Contractor shall direct specific attention, in writing or on resubmitted Shop Drawings, Product Data or Samples, to revisions other than those requested by the Architect on previous submittals. 4.12.8 No portion of the Work requiring submission of a Shop Drawing, Product Data or Sample shall be commenced until the submittal has been approved by the Architect as provided in Subparagraph 2.2.7 of these General Conditions. All such portions of the Work shall be in accordance with approved submittals.

  • Recycled Products The Contractor agrees to comply with all the requirements of Section 6002 of the Resource Conservation and Recovery Act (RCRA), as amended (42 U.S.C. 6962), including but not limited to the regulatory provisions of 40 CFR Part 247, and Executive Order 12873, as they apply to the procurement of the items designated in Subpart B of 40 CFR Part 247. References: 42 U.S.C. 6962, 40 CFR Part 247, Executive Order 12873 (More than $10,000)