NEW. The Generator Lead Line is being relocated to accommodate the expansion of the landfill (Phase 2). As a result of the line relocation, the configuration of the Generator Lead Line will change as depicted in Attachment 3, Figure 2. Specifically, the existing Switch 566 and surge arrestors will be removed along with existing poles 209, and the following new CTO IFs shall be installed: • Pole 201, wood pole structure, to be located approximately ½ span from pole 17 ½;