MONITORING OF OPERATION AND MAINTENANCE. 19.1 Inspection and measurement of Performance Standards 19.1.1 The Technical Auditor shall inspect the Project Facilities at least once in a month and measure the compliance of the Operator with the Performance Standards. It shall make a report of such inspection (the “Inspection Report”) stating in reasonable detail the defects or deficiencies, if any, with particular reference to the Maintenance Requirements, the O&M Plan and Safety Requirements, and send a copy thereof to the Authority and the Operator within 7 (seven) days of such inspection. The Operator shall render such assistance and co-operation as may be reasonably required by the Technical Auditor to conduct such inspections.
Appears in 3 contracts
Sources: Performance Based Contract, Performance Based Contract (Pbc), Performance Based Contract (Pbc)