Common use of MAINTENANCE OF TRAFFIC Clause in Contracts

MAINTENANCE OF TRAFFIC. Maintenance of Pedestrian Traffic: No Maintenance of Railroad Traffic: No Maintenance of Vehicular Traffic: No – Closure w/ Detour Temporary Road(s): Phase A to Recommend: Temporary Road Plans & Notes by: County Consultant Detour Plan Prepared by: County Consultant X During the construction of the improvements, it is currently presumed that the road(s) are to remain open to through and local traffic and that the construction is to be completed under traffic. To the satisfaction of and subject to the Engineer’s review and approval, a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area shall be prepared. As may be applicable during the preparation of the plans, the Consultant shall work with the Engineer to determine if alternative methods of handling traffic would be warranted and desirable during the construction of the project. These measures may include, but not be limited to, the detouring of all through traffic while maintaining local traffic or the maintaining of through traffic on a one-way only basis. If the Engineer authorizes other methods, the Consultant will work with the Engineer to determine if special restrictions are to be enforced during the implementation of the alternate measure(s), i.e. a total time duration, a daily time/hour restriction, etc. The Consultant will also work with the Engineer’s Traffic Department to determine the detour route and prepare the necessary detour plan(s). As necessary for the alternative measures, the Consultant is to prepare a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area. This item of work shall also include the preparation of any necessary plans that indicate temporary work zone pavement markings and/or signs that are to be included in the project, especially where the number of traveled lanes and/or the width of traveled pavement are to be decreased during construction. All items of work relating to the maintenance of traffic are to be submitted with the final plan review submission.

Appears in 1 contract

Samples: cdn5-hosted.civiclive.com

AutoNDA by SimpleDocs

MAINTENANCE OF TRAFFIC. Maintenance of Pedestrian Traffic: No Maintenance of Railroad Traffic: No Maintenance of Vehicular Traffic: No – Closure w/ Detour X Temporary Road(s): Phase A to Recommend: Temporary Road Plans & Notes by: County Consultant Detour Plan Prepared by: County Consultant X (if needed) During the construction of the improvements, it is currently presumed that the road(s) are to remain open to through and local traffic and that the construction is to be completed under traffic. To the satisfaction of and subject to the Engineer’s review and approval, a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area shall be prepared. As may be applicable during the preparation of the plans, the Consultant shall work with the Engineer to determine if alternative methods of handling traffic would be warranted and desirable during the construction of the project. These measures may include, but not be limited to, the detouring of all through traffic while maintaining local traffic or the maintaining of through traffic on a one-way only basis. If the Engineer authorizes other methods, the Consultant will work with the Engineer to determine if special restrictions are to be enforced during the implementation of the alternate measure(s), i.e. a total time duration, a daily time/hour restriction, etc. The Consultant will also work with the Engineer’s Traffic Department to determine the detour route and prepare the necessary detour plan(s). As necessary for the alternative measures, the Consultant is to prepare a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area. This item of work shall also include the preparation of any necessary plans that indicate temporary work zone pavement markings and/or signs that are to be included in the project, especially where the number of traveled lanes and/or the width of traveled pavement are to be decreased during construction. All items of work relating to the maintenance of traffic are to be submitted with the final plan review submission.

Appears in 1 contract

Samples: p1cdn4static.civiclive.com

MAINTENANCE OF TRAFFIC. Maintenance of Pedestrian Traffic: No X Maintenance of Railroad Traffic: No Maintenance of Vehicular Traffic: No – Closure w/ Detour X Temporary Road(s): Phase A to Recommend: Temporary Road Plans & Notes by: County Consultant Detour Plan Prepared by: County Consultant X During the construction of the improvements, it is currently presumed that the road(s) are to remain open to through and local traffic and that the construction is to be completed under traffic. To the satisfaction of and subject to the Engineer’s review and approval, a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area shall be prepared. As may be applicable during the preparation of the plans, the Consultant shall work with the Engineer to determine if alternative methods of handling traffic would be warranted and desirable during the construction of the project. These measures may include, but not be limited to, the detouring of all through traffic while maintaining local traffic or the maintaining of through traffic on a one-way only basis. If the Engineer authorizes other methods, the Consultant will work with the Engineer to determine if special restrictions are to be enforced during the implementation of the alternate measure(s), i.e. a total time duration, a daily time/hour restriction, etc. The Consultant will also work with the Engineer’s Traffic Department to determine the detour route and prepare the necessary detour plan(s). As necessary for the alternative measures, the Consultant is to prepare a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area. This item of work shall also include the preparation of any necessary plans that indicate temporary work zone pavement markings and/or signs that are to be included in the project, especially where the number of traveled lanes and/or the width of traveled pavement are to be decreased during construction. All items of work relating to the maintenance of traffic are to be submitted with the final plan review submission.

Appears in 1 contract

Samples: sycamoretownship.org

MAINTENANCE OF TRAFFIC. Maintenance of Pedestrian Traffic: No Maintenance of Railroad Traffic: No Maintenance of Vehicular Traffic: No – Closure w/ Detour X Temporary Road(s): Phase A to Recommend: Temporary Road Plans & Notes by: County Consultant Detour Plan Prepared by: County Consultant X During the construction of the improvements, it is currently presumed that the road(s) are road will be detoured to remain open to through and local traffic and that the construction is to be completed under trafficlocal traffic maintained at all times. To the satisfaction of and subject to the EngineerTownship’s review and approval, a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area shall be prepared. As may be applicable during the preparation of the plans, the Consultant shall work with the Township and Engineer to determine if alternative methods of handling traffic would be warranted and desirable during the construction of the project. These measures may include, but not be limited to, the detouring of all through traffic while maintaining local traffic or the maintaining of through traffic on a one-way only basis. If the Engineer authorizes other methods, the Consultant will work with the Engineer to determine if special restrictions are to be enforced during the implementation of the alternate measure(s), i.e. a total time duration, a daily time/hour restriction, etc. The Consultant will also work with the Engineer’s Traffic Department to determine the detour route and prepare the necessary detour plan(s). As necessary for the alternative measures, the Consultant is to prepare a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area. This item of work shall also include the preparation of any necessary plans that indicate temporary work zone pavement markings and/or signs that are to be included in the project, especially where the number of traveled lanes and/or the width of traveled pavement are to be decreased during construction. All items of work relating to the maintenance of traffic are to be submitted with the final plan review submission.

Appears in 1 contract

Samples: sycamoretownship.org

MAINTENANCE OF TRAFFIC. Maintenance of Pedestrian Traffic: No X Maintenance of Railroad Traffic: No Maintenance of Vehicular Traffic: No – Closure w/ Detour X Temporary Road(s): Phase A to Recommend: Temporary Road Plans & Notes by: County Consultant Detour Plan Prepared by: County Consultant X During the construction of the improvements, it is currently presumed that the road(s) are to remain open to through and local traffic and that the construction is to be completed under traffic. To the satisfaction of and subject to the Engineer’s review and approval, a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area shall be prepared. As may be applicable during the preparation of the plans, the Consultant shall work with the Engineer to determine if alternative methods of handling traffic would be warranted and desirable during the construction of the project. These measures may include, but not be limited to, the detouring of all through traffic while maintaining local traffic or the maintaining of through traffic on a one-way only basis. If the Engineer authorizes other methods, the Consultant will work with the Engineer to determine if special restrictions are to be enforced during the implementation of the alternate measure(s), i.e. a total time duration, a daily time/hour restriction, etc. The Consultant will also work with the Engineer’s Traffic Department to determine the detour route and prepare the necessary detour plan(s). As necessary for the alternative measures, the Consultant is to prepare a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area. This item of work shall also include the preparation of any necessary plans that indicate temporary work zone pavement markings and/or signs that are to be included in the project, especially where the number of traveled lanes and/or the width of traveled pavement are to be decreased during construction. All items of work relating to the maintenance of traffic are to be submitted with the final plan review submission.

Appears in 1 contract

Samples: cdnsm5-hosted.civiclive.com

AutoNDA by SimpleDocs

MAINTENANCE OF TRAFFIC. Maintenance of Pedestrian Traffic: No Maintenance of Railroad Traffic: No Maintenance of Vehicular Traffic: No – Closure w/ Detour Temporary Road(s): Road(s):NA Phase A to Recommend: Temporary Road Plans & Notes by: County Consultant Detour Plan Prepared by: County Consultant X During the construction of the improvements, it is currently presumed that the road(s) are to remain open to through and local traffic and that the construction Road is to be completed under traffic. To the satisfaction of and subject to the Engineer’s review and approval, a tentative outline for the sequence of closed during construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area shall be prepared. As may be applicable during the preparation of the plans, the Consultant shall work with the Engineer to determine if alternative methods of handling traffic would be warranted and desirable during the construction of the project. These measures may include, but not be limited to, the detouring of all through traffic while maintaining local traffic or the maintaining of through traffic on a one-way only basis. If the Engineer authorizes other methods, the Consultant will work with the Engineer to determine if special restrictions are to be enforced during the implementation of the alternate measure(s), i.e. a total time duration, a daily time/hour restriction, etc. The Consultant will also work with the Engineer’s Traffic Department to determine the detour route and prepare the necessary detour plan(s). As necessary for the alternative measures, the Consultant is to prepare a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area. This item of work shall also include the preparation of any necessary plans that indicate temporary work zone pavement markings and/or signs that are to be included in the project, especially where the number of traveled lanes and/or the width of traveled pavement are to be decreased during construction. All items of work relating to the maintenance of traffic are to be submitted with the final plan review submission.

Appears in 1 contract

Samples: cdn5-hosted.civiclive.com

MAINTENANCE OF TRAFFIC. Maintenance of Pedestrian Traffic: No Maintenance of Railroad Traffic: No Maintenance of Vehicular Traffic: No – Closure w/ Detour Closed during Construction Temporary Road(s): NA Phase A to Recommend: Temporary Road Plans & Notes by: County Consultant X Detour Plan Prepared by: County Consultant X During the construction of the improvements, it is currently presumed that the road(s) are road will be closed to remain open to through and local traffic and that the construction is to be completed under all traffic. To the satisfaction of and subject to the Engineer’s review and approval, a tentative outline for the sequence of construction, a maintenance of traffic detour plan and/or maintenance of traffic and notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area shall be prepared. As may be applicable during the preparation of the plans, the Consultant shall work with the Engineer to determine if alternative methods of handling traffic would be warranted and desirable during the construction of the project. These measures may include, but not be limited to, the detouring of all through traffic while maintaining local traffic or the maintaining of through traffic on a one-way only basis. If the Engineer authorizes other methods, the Consultant will work with the Engineer to determine if special restrictions are to be enforced during the implementation of the alternate measure(s), i.e. a total time duration, a daily time/hour restriction, etc. The Consultant will also work with the Engineer’s Traffic Department to determine the detour route and prepare the necessary detour plan(s). As necessary for the alternative measures, the Consultant is to prepare a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area. This item of work shall also include the preparation of any necessary plans that indicate temporary work zone pavement markings and/or signs that are to be included in the project, especially where the number of traveled lanes and/or the width of traveled pavement are to be decreased during construction. All items of work relating to the maintenance of traffic are to be submitted with the final plan review submission.

Appears in 1 contract

Samples: cdn5-hosted.civiclive.com

MAINTENANCE OF TRAFFIC. Maintenance of Pedestrian Traffic: No Maintenance of Railroad Traffic: No Maintenance of Vehicular Traffic: No – Closure w/ Detour X Temporary Road(s): Phase A to Recommend: Temporary Road Plans & Notes by: County Consultant Detour Plan Prepared by: County Consultant X During the construction of the improvements, it is currently presumed that the road(s) are to remain open to through and local traffic and that the construction is to be completed under traffic. To the satisfaction of and subject to the Engineer’s review and approval, a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area shall be prepared. As may be applicable during the preparation of the plans, the Consultant shall work with the Engineer to determine if alternative methods of handling traffic would be warranted and desirable during the construction of the project. These measures may include, but not be limited to, the detouring of all through traffic while maintaining local traffic or the maintaining of through traffic on a one-way only basis. If the Engineer authorizes other methods, the Consultant will work with the Engineer to determine if special restrictions are to be enforced during the implementation of the alternate measure(s), i.e. a total time duration, a daily time/hour restriction, etc. The Consultant will also work with the Engineer’s Traffic Department to determine the detour route and prepare the necessary detour plan(s). As necessary for the alternative measures, the Consultant is to prepare a tentative outline for the sequence of construction, a maintenance of traffic plan and/or maintenance of traffic notes in sufficient detail for the proper control of traffic through the project, especially involving ingress to and egress from the abutting properties within the project area. This item of work shall also include the preparation of any necessary plans that indicate temporary work zone pavement markings and/or signs that are to be included in the project, especially where the number of traveled lanes and/or the width of traveled pavement are to be decreased during construction. All items of work relating to the maintenance of traffic are to be submitted with the final plan review submission.

Appears in 1 contract

Samples: cdnsm5-hosted.civiclive.com

Time is Money Join Law Insider Premium to draft better contracts faster.