KYTC Response to Final Documentation; Change Order Sample Clauses

KYTC Response to Final Documentation; Change Order. 13.1.6.1 KYTC’s failure to respond to a complete and final documentation of a Relief Event Claim that DBT submits in accordance with Section 13.1.5 within 45 days after KYTC’s receipt shall constitute KYTC’s rejection of the Relief Event Claim, 13.1.6.2 If KYTC finds the Relief Event Claim or any part thereof to be valid, or if the Relief Event Claim or any part thereof is deemed to be valid as a result of completion of the Dispute Resolution Procedures, KYTC will: (a) Deliver to DBT notice authorizing such partial or whole Relief Event Claim; (b) Pay such Relief Event Claim to the extent deemed valid (as to Extra Work Costs by one of the methods set forth in Section 13.2.2); and (c) Grant a commensurate Completion Deadline adjustment, if applicable, as provided for in the Contract Documents. 13.1.6.3 The Parties shall thereafter promptly execute a Change Order documenting the Relief Event Claim or part thereof that KYTC finds to be valid or that is determined to be valid through the Dispute Resolution Procedures.

Related to KYTC Response to Final Documentation; Change Order

  • Additional Documentation Execute and deliver, or cause to be executed and delivered, any and all other agreements, instruments or documents which Lender may reasonably request in order to give effect to the transactions contemplated under this Loan Agreement and the other Loan Documents.

  • Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-▇▇▇▇▇-▇▇▇▇▇▇▇-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-▇▇▇▇▇-▇▇▇▇▇▇▇-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • Optional Xactimate Response Attachment (Part 2)

  • Technical Documentation Prior to commencement of the Tests on Completion, the Contractor shall supply to the Engineer the technical documentation as specified in the Employer’s Requirements. The Works or Section shall not be considered to be completed for the purposes of taking- over under sub-clause 10.1 [Taking Over of the Works and Sections] until the Engineer has received the technical documentation as defined in this sub-clause 5.7, the "history file" including design calculations and certain certification as well as any other documents required to meet the CE Marking requirements.

  • ODUF Packing Specifications 6.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.