INSTALLATION SUPERVISION. One experienced Kamewa Service Engineer will supervise the installation onboard during 15 normal working days. Travelling expenses for max. 3 trips of our Service Engineer to the shipyard as well as board and lodging charges during the travelling time and service days are included. The Services is rendered under our conditions TP 53E. Service and overtime over and above this scope of supply as well as travelling time and expenses between hotel and site, waiting time for which Kamewa is not responsible and consequential board and lodging expenses, stand-by time onboard, will be charged according to our list of rates valid at the time of the service. Classification -------------- The equipment will be built to the classification requirements of U.S. Coast Guard and ABS in accordance with the rules valid at the date of this tender. We undertake to correct over a period of 36 months which period shall commence on the date the vessel is delivered to its first owner, any defect in the equipment supplied, resulting from faulty material or workmanship. However, the guarantee period will not exceed (44) months after the equipment has been declared ready for delivery from our workshop. In addition, Kamewa will guarantee the aluminum components for wear and structural integrity for 60 months from beginning of service but not to exceed 66 months from delivery of equipment. The operator must perform all zinc replacement, painting and scheduled maintenance per Kamewa's instruction manual. Kamewa shall not be liable for any consequential loss or damage whatsoever which arises out of or in connection with the supply of the Equipment or its use including but not limited to loss of profit, towage, docking, crane rental, warping, scaffolding, assistance and services by yard personnel, loss of hire, or loss of contract. Responsibility for Equipment Selection -------------------------------------- It is the Buyer's responsibility to inform Kamewa about the maximum full scale resistance of the hull over the entire ship speed range. Based on these data it is Kamewa's responsibility to select suitable equipment. In case the information of maximum full scale resistance or equivalent data, received by Kamewa and used for the selection of the water jet unit(s) specified under this tender or contract, is incorrect or should change at a later stage, the consequences on performance, equipment and all costs involved shall later be born by the Buyer. General Conditions ------------------ Unless otherwise is expressly stated in this tender the enclosed "General Conditions for the supply of Plant and Machinery for export, ECE 188" shall apply. Limitation of Liability ----------------------- The total aggregate liability of Kamewa to the buyer pursuant to any claim or series of claims which arise under the contract shall not exceed 50 percent of the price paid for the equipment for the relevant ship set. Validity of Tender ------------------ This tender is valid two months, without obligation, and will be binding only after acceptance by your and our confirmation thereof. Yours faithfully, /s/ ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇ Kamewa America Encls.: Specification 023 Hydraulic System ---------------- For each water jet unit: 1 Main hydraulic pump (PTO-driven, mounted on gearbox or engine)
Appears in 2 contracts
Sources: Vessel Construction Agreement (Lighthouse Fast Ferry Inc), Vessel Construction Agreement (Lighthouse Landings Inc)
INSTALLATION SUPERVISION. One experienced Kamewa Service Engineer will supervise the installation onboard during 15 normal working days. Travelling expenses for max. 3 trips of our Service Engineer to the shipyard as well as board and lodging charges during the travelling time and service days are included. The Services is rendered under our conditions TP 53E. Service and overtime over and above this scope of supply as well as travelling time and expenses between hotel and site, waiting time for which Kamewa is not responsible and consequential board and lodging expenses, stand-by time onboard, will be charged according to our list of rates valid at the time of the service. Classification -------------- The equipment will be built to the classification requirements of U.S. Coast Guard and ABS in accordance with the rules valid at the date of this tender. Guarantee We undertake to correct over a period of 36 months which period shall commence on the date the vessel is delivered to its first owner, any defect in the equipment supplied, resulting from faulty material or workmanship. However, the guarantee period will not exceed (44) months after the equipment has been declared ready for delivery from our workshop. In addition, Kamewa will guarantee the aluminum components for wear and structural integrity for 60 months from beginning of service but not to exceed 66 months from delivery of equipment. The operator must perform all zinc replacement, painting and scheduled maintenance per Kamewa's instruction manual. Kamewa shall not be liable for any consequential loss or damage whatsoever which arises out of or in connection with the supply of the Equipment or its use including but not limited to loss of profit, towage, docking, crane rental, warping, scaffolding, assistance and services by yard personnel, loss of hire, or loss of contract. Responsibility for Equipment Selection -------------------------------------- It is the Buyer's responsibility to inform Kamewa about the maximum full scale resistance of the hull over the entire ship speed range. Based on these data it is Kamewa's responsibility to select suitable equipment. In case the information of maximum full scale resistance or equivalent data, received by Kamewa and used for the selection of the water jet unit(s) specified under this tender or contract, is incorrect or should change at a later stage, the consequences on performance, equipment and all costs involved shall later be born by the Buyer. General Conditions ------------------ Unless otherwise is expressly stated in this tender the enclosed "General Conditions for the supply of Plant and Machinery for export, ECE 188" shall apply. Limitation of Liability ----------------------- The total aggregate liability of Kamewa to the buyer pursuant to any claim or series of claims which arise under the contract shall not exceed 50 percent of the price paid for the equipment for the relevant ship set. Validity of Tender ------------------ This tender is valid two months, without obligation, and will be binding only after acceptance by your and our confirmation thereof. Yours faithfully, /s/ ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇ Kamewa America Encls.: Specification 023 Hydraulic System ---------------- For each water jet unit: 1 Main hydraulic pump (PTO-driven, mounted on gearbox or engine)
Appears in 1 contract
Sources: Vessel Construction Agreement (Lighthouse Fast Ferry Inc)