Initial Training at Codexis’ Facility Sample Clauses

Initial Training at Codexis’ Facility. After the Effective Date, the GSK Team will participate in Wave 2 of Technology Transfer at Codexis’ facility in Redwood City, California, which training shall be completed as outlined in the Technology Transfer Plan (the “Initial Training”). GSK shall bear its own costs and expenses of participating in such Initial Training.

Related to Initial Training at Codexis’ Facility

  • Initial Training Training is important. It is also a matter widely discussed in books and articles. So the agreement should cover this issue if only to satisfy the worries of the Franchisee. We have used it as ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ .

  • Technical Training The CAISO and the Participating TOs shall respond to reasonable requests for support and provide relevant technical training to each other’s employees to support the safe, reliable, and efficient operation of the CAISO Controlled Grid and to comply with any NERC or WECC operator certification or training requirements. Examples of such technical training include, but are not limited to: (1) the theory or operation of new or modified equipment (e.g., control systems, Remedial Action Schemes, protective relays); (2) computer and applicator programs; and (3) CAISO (or Participating TO) requirements. The Parties shall enter into agreements regarding the timing, term, locations, and cost allocation for the training.

  • Construction Phase Services 3.1.1 – Basic Construction Services

  • Equipment Testing and Inspection 2.1.1 The Interconnection Customer shall test and inspect its Small Generating Facility and Interconnection Facilities prior to interconnection. The Interconnection Customer shall notify the NYISO and the Connecting Transmission Owner of such activities no fewer than five Business Days (or as may be agreed to by the Parties) prior to such testing and inspection. Testing and inspection shall occur on a Business Day. The Connecting Transmission Owner may, at its own expense, send qualified personnel to the Small Generating Facility site to inspect the interconnection and observe the testing. The Interconnection Customer shall provide the NYISO and Connecting Transmission Owner a written test report when such testing and inspection is completed. The Small Generating Facility may not commence parallel operations if the NYISO, in consultation with the Connecting Transmission Owner, finds that the Small Generating Facility has not been installed as agreed upon or may not be operated in a safe and reliable manner. 2.1.2 The NYISO and Connecting Transmission Owner shall each provide the Interconnection Customer written acknowledgment that it has received the Interconnection Customer’s written test report. Such written acknowledgment shall not be deemed to be or construed as any representation, assurance, guarantee, or warranty by the NYISO or Connecting Transmission Owner of the safety, durability, suitability, or reliability of the Small Generating Facility or any associated control, protective, and safety devices owned or controlled by the Interconnection Customer or the quality of power produced by the Small Generating Facility.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.