Harvest-Monitored Field Acreage Measurements Sample Clauses

Harvest-Monitored Field Acreage Measurements. Planted areas of Harvest-Monitored Fields (GPS acres) will be determined as follows:
AutoNDA by SimpleDocs

Related to Harvest-Monitored Field Acreage Measurements

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Biological Samples If so specified in the Protocol, Institution and Principal Investigator may collect and provide to Sponsor or its designee Biological Samples (“Biological Samples”). 12.2.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Test Samples The Contractor is responsible for providing Samples of sufficient size for test purposes and for coordinating such tests with the Work Progress Schedule to avoid delay.

  • Table 7b - Other milestones and targets Reference Number Select stage of the lifecycle Please select target type from the drop-down menu Description (500 characters maximum) Is this a collaborative target? Baseline year Baseline data Yearly milestones (numeric where possible, however you may use text) Commentary on your milestones/targets or textual description where numerical description is not appropriate (500 characters maximum)

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Particular Methods of Procurement of Goods and Works International Competitive Bidding. Goods and works shall be procured under contracts awarded on the basis of International Competitive Bidding.

  • Interim Measures 6.1 The Parties acknowledge that the British Columbia Claims Task Force made the following recommendation concerning interim measures:

  • Loop Testing/Trouble Reporting 2.1.6.1 Think 12 will be responsible for testing and isolating troubles on the Loops. Think 12 must test and isolate trouble to the BellSouth portion of a designed/non- designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Think 12 will be required to provide the results of the Think 12 test which indicate a problem on the BellSouth provided Loop.

Time is Money Join Law Insider Premium to draft better contracts faster.